BC32 automated ID device Installation[1].pptx

lupande 1 views 16 slides Oct 11, 2025
Slide 1
Slide 1 of 16
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16

About This Presentation

comment installer MA-120 de Render, pour l'identification bactérienne automatisée


Slide Content

Installation Email: [email protected] Tel: +86 755 8654 0309 #6K, Building No.1, Baisha Emerging Industry Zone,Shahexi Road, Nanshan District, Shenzhen 518052 China

Pre-installation check Check the cartons and packages Correct quantity of the goods Without inversion or deformation Without mark of wet water Without trace of hit Without signs of being opened 2

Installation requirement Environment Temperature :10℃-30℃ Power supply : AC 220V , 50Hz , 250VA Relative humidity : 70% Atmospheric pressure : 76 kPa-106 kPa Altitude : 0 ~ 3000m Less dust, good ventilation environment. No corrosive, flammable and explosive gas or steam in the room Avoid direct sunlight or thermal radiation Good desktop level (inclination below 1/200) No body-perceivable shock. 3

Installation requirement No machinery transmitting high frequency nearby. Cautions on electromagnetic wave: Please don’t carry cellophane, walkie-talkie and other electric appliances transmitting electromagnetic wave into the room With protective earthling (below 10Ω earth impedance) 4

Not less than 20 cm Not less then 30cm Not less then 50cm Installation requirement 5

PC requirement CPU : mainstream CPU Storage : 4.0 GB Hard drive space : > 40G Operation system : Windows 7/10 Supporting software : Microsoft Word 97 and above At least 2 partitions required, install culture system in any disk except C partition No standby mode setting for computer No sleep mode setup on computer 6

Installation Unpacking Accessories check Remove protectors Install module 7

Unpacking Remove the screw Take out accessories Remove the foam Take out machine 8

Accessories check Check according to the paper you receive, please contact manufacturer if there is anything missing 9

Remove protector Remove the EPE foam from Instrument Remove the incubator bracket 10

Install the monitor Fix the monitor with its own screws Fix cables on bracket with cable buckle, see Pic1& Pic2 Pic1 Pic2 Install module 11

After power on, the Windows system start and software run automatically.

Packing 13

Packing procedure Take out the screen Put back the fixer as the picture Put back the foam Put back foam in box Put back machine 14

Put back other foam Put accessories in sealing bag Packing procedure 15

16
Tags