SlidePub
Home
Categories
Login
Register
Home
Technology
Bhendi bazaar
Bhendi bazaar
1,724 views
19 slides
Jun 15, 2021
Slide
1
of 19
Previous
Next
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
About This Presentation
BHENDI BAZAAR, MUMBAI
FOLLOW ON INSTAGRAM: @conceptive_architects
Size:
1.48 MB
Language:
en
Added:
Jun 15, 2021
Slides:
19 pages
Slide Content
Slide 1
REDEVELOPMENT OF
BHENDI BAZAAR,
MUMBAI
Presented By:
Simran Aggarwal
MURP-I (20-22)
FOA, SUPVA
Slide 2
OVERVIEW: ╸BhendiBazaarisamarketinSouth
Mumbai.
╸Thebazaarispopularforshopping
namelyantiqueitems,hardwareitems
etc.
╸Theareaissettoberedevelopedwith
theprojectbeingundertakenbySaifee
BurhaniUpliftmentTrust.
╸SaifeeBurhaniUpliftmentTrustisanot-
for-profittrustthatwassetupin2009to
undertaketheredevelopmentofoneof
India'smostvibrantbutcongested
localities.
2
Slide 3
3
OVERVIEW:
•BhendiBazaarisof16.5Acreswhichisdividedinto280plots.
•Ithasmorethan3500residentialtenantswith1250shopswhichtotalsupto245
totalnumberofbuildings.
•Thisbazaarisover125yearoldwhichiscrumblingpoorinfrastructurewith
congestedstreets.
Slide 4
NEED FOR
REDEVELOPMENT
╸Thebazaarisover125-year-old,whichis
crumblingunderpoorinfrastructure.
╸Inthepast3yearsmorethan170people
havediedin11incidentofbuilding
collapse.
╸Unsatisfactorylivingconditionforthe
tenants.(becauseoffamilyexpansion)
╸Neartononepublicspacefor
recreationalpurpose.
╸Illegalconstruction.
╸Thearealackbasicutilitiessuchas
sewage treatmentsandproper
ventilation.
Existing Scenario Of BhendiBazaar
4
Slide 5
INTENT &
CONTEXT
╸TheredevelopmentofBhendi
Bazaarisdonetocreatemore
commercialopportunitieswhile
upliftingthequalityoflifeofthe
residents.
╸Thevisionforthenewerawillbe
achievedthroughbuildingefficient
infrastructurewith modern
amenities and promoting
sustainablelivingandcreationof
greenopenspaces.
╸Thisprojectaimstobethemodel
forfuturesmartcities.
5
Slide 6
STAKEHOLDERS
╸Thisredevelopmentprojectindicatesthelackofrequired
stakeholdersengagedinprojectformulation.
╸TheprojectwasokayedbyMaharashtraHousingandArea
DevelopmentAuthorityandBombayMunicipalCorporation.
6
Slide 7
METHODOLOGY
╸Startedin2009,originaldeadlinewas2023.
╸Phase-I:
╶Subclusters1and3completedandtenantsfromthe
locationhavebeenshifted.
╸Phase-2:
╶Expectedtobecompletedby2025
7
Slide 8
METHODOLOGYADOPTED
8
╸Fortheexecutionofwork,responsibilitiesaredividedinto
differentdepartmentsanditiscontrolledbyeachother
whichfurtherhelpstomaintainthecontinuityofthework.
╶Administration
╶ExecutionDepartment
╶PlanningDepartment
╶BillingDepartment
╶HousingBoard,Mumbai
╶SiteSafetyDepartment
╶LocalGoverningBody.
Slide 9
9
MASTER PLAN
Slide 10
10
CONNECTIVITY:
Existing Religious Structures & Reservation Buildings
Sub-Sector Development
Slide 11
11
CONNECTIVITY:
Wrap-Around Rehab Apartments
4-5 Acres of Podium Greens
Rehab Retails
3500: Podium Parkings
Slide 12
12
CONNECTIVITY:
3200 Rehab Apartments & 1900 Sale Apartments
Slide 13
13
REDEVELOPED : BHENDI BAZAAR
Slide 14
DURING:
╸ThehighpriestoftheDawoodiBohracommunity.TheBohris
formabout85percentofthepopulationofBhendiBazaar.
╸Between2010and2013thetrustbuiltseveraltransithomes.
MostofthemnearMazgaonwhichisabout5kmfromBhendi
Bazaar.
╸InApril,2011some100familiesweralsomovedtotransitcolony.
14
Slide 15
AFTER:
1
•FollowingthedesignofneighborhoodasperthepolicyissuedbyMaharashtra
Governmentin2009.
•100-150ofchaulshasbeenreplacedby17highstoreyresidentialbuildings.
•Wideststreetsupto20meters.
•Maximumgreenareasandproperventilation.
Slide 16
AFTER:
╸Theentireredevelopmentiseco-friendly.
╸Thebuildingriseprogressivelyinheightfromsouthtonorth,
thusensuringthateveryflatcatchesthebreezecomingfrom
thesea.
╸Outof17towers,13willbeusedtorehabilitatethecurrent
residentsandremaining4towerswillbeputonsalefor1200-
1600residence.
╸Thegroundfloorwillbecommercialwithundergroundparking,
andresidentialparkingwillbebuiltontop.
16
Slide 17
AFTER:
╸Accordingtoa2012regulationoftheMRTPAct,residential
tenantsaresupposedtoget35%moreareaontheirexisting
totalcarpetareaandcommercialtenantsareeligibleforan
additional20%.
17
Slide 18
SWOT Analysis
18
STRENGTHS
•Smart Transit:
Commercial Transit
Accomodation
•Sustainale Development
WEAKNESSES
•The saled towers
doesnot help in
generating economy.
•Economic Growth
•Social Gatherings
OPPORTUNITIES
•While construction, the
increase in pollution
percentage.
THREATS
Slide 19
Thankyou!
19
Tags
mumbai
bhendi bazaar
slum
redevelopment
slum redevelopemnt
Categories
Technology
Download
Download Slideshow
Get the original presentation file
Quick Actions
Embed
Share
Save
Print
Full
Report
Statistics
Views
1,724
Slides
19
Age
1632 days
Related Slideshows
11
8-top-ai-courses-for-customer-support-representatives-in-2025.pptx
JeroenErne2
46 views
10
7-essential-ai-courses-for-call-center-supervisors-in-2025.pptx
JeroenErne2
46 views
13
25-essential-ai-courses-for-user-support-specialists-in-2025.pptx
JeroenErne2
37 views
11
8-essential-ai-courses-for-insurance-customer-service-representatives-in-2025.pptx
JeroenErne2
34 views
21
Know for Certain
DaveSinNM
21 views
17
PPT OPD LES 3ertt4t4tqqqe23e3e3rq2qq232.pptx
novasedanayoga46
26 views
View More in This Category
Embed Slideshow
Dimensions
Width (px)
Height (px)
Start Page
Which slide to start from (1-19)
Options
Auto-play slides
Show controls
Embed Code
Copy Code
Share Slideshow
Share on Social Media
Share on Facebook
Share on Twitter
Share on LinkedIn
Share via Email
Or copy link
Copy
Report Content
Reason for reporting
*
Select a reason...
Inappropriate content
Copyright violation
Spam or misleading
Offensive or hateful
Privacy violation
Other
Slide number
Leave blank if it applies to the entire slideshow
Additional details
*
Help us understand the problem better