Building system design topics.pptx

3,689 views 89 slides Aug 14, 2023
Slide 1
Slide 1 of 89
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85
Slide 86
86
Slide 87
87
Slide 88
88
Slide 89
89

About This Presentation

Building Systems Design Civil Engineering


Slide Content

2 + 2 + Building system design ENGR. RARL, CE

2 + 2 + THE BUILDING SITE 2

2 + THE BUILDING SITE In planning the design and construction of a building, we should carefully consider the environmental forces which the physical context for the building-its site-presents. A site’s geographic location, topography, plant materials, climate, and orientation to the sun and prevailing winds all influence decisions at a very early stage in the design process. 3

2 + The building site ENVIRONMENTAL FACTORS GEOGRAPHIC FACTORS: SOIL - the soil affects the type and size of a buildings foundation system, the drainage of ground and surface water, the types of plant material able to grow on a site. TOPOGRAPHY – Land forms and ground slopes affect the buildings foundation type, the building form and its relationship to the ground plane, site drainage, the site’s micro-climate: wind, temperature, solar radiation. VEGETATION - The types and location of plant materials affect the definition or visual screening of exterior spaces. 4

2 + The building site ENVIRONMENTAL FACTORS CLIMATIC FACTORS: THE SUN - The sun is the source of solar radiation (heat gain), natural light. The prevalence direction, and velocity of wind – affects the air infiltration into a building (potential heat loss), the ventilation of interior spaces and outdoor courts, the lateral load on a structure PRECIPITATION –The roof form, its construction, and the resulting gravity load o a structure, the presence and drainage of water on a site, the choice of building materials TEMPERATURE – Air temperature and thermal comfort are affected by all of the above climatic factors. 5

2 + The building site ENVIRONMENTAL FACTORS CLIMATIC FACTORS: VIEWS – The consideration of desirable and undesirable views will help determine the building form and orientation, the buildings fenestration (door and window openings), the plant materials used in landscaping the site SOUND – The level, quality and source of sounds affect: the distribution and orientation of the building mass, the choice of the building materials and their assembly. 6

Regulatory factors ZONING Zoning ordinances govern the use and bulk of buildings and structures within municipality or land use district. These ordinances typically regulate: The types of activities which may occur on a given piece of land How much of the land can be covered by a building How far a building must be set back from each of the property lines The total floor area that can be constructed 7

The type of occupancy a building houses The fire-resistance rating of its structure and construction The allowable height from the neighboring structures Add a Footer 8 Building code

2 + SOILS Practically all buildings rely on soil for their ultimate support. The integrity of a building structure therefore depends ultimately on the type of sol underlying the foundation and the soil’s strength under loading. There are two broad classes of soils – coarse-grained and fine-grained soils. Coarse-grained soils include gravels and sands which consist of relatively large particles. The individual particles of fine-grained soils are much smaller and often cannot be seen by the eye. The soil underlying a building site may actually consist of superimposed layers, each of which contains a mix of soil types. 9

2 + Soil classification On slopping sites and during excavation of a flit site, a soils potential for lateral displacement should be considered. The natural angle repose for dry, granular soils tend to be shallower that for more cohesive soils live compacted clay. 10

2 + Topography and climate 11

2 + Topography and climate 12

2 + Topography and building form 13

2 + Topography and building form 14

2 + sun A building’s location, orientation and form should take advantage of the sun’s thermal, hygienic, and psychological benefits. The sun’s radiation, however, may not always be beneficial, depending on the building site’s climate. In determining a building’s form and orientation, the objective should be to maintain a balance between under heated periods when a solar radiation is beneficial. 15

2 + Solar shading devices Shading devices shield a building’s exterior surfaces and interior spaces from solar radiation. Their effectiveness depends on their form and orientation relative to the sun’s angle. Exterior shading devices are more efficient than those located within a building’s spaces since they intercept the sun’s radiation before it can reach the buildings surfaces 16

2 + Solar shading devices 17

2 + Solar shading devices 18

2 + winds Wind prevalence, velocity, temperature, and direction are important site considerations in all climatic regions. In evaluating the wind’s potential effect on a building, its seasonal and daily variations should be carefully considered. Natural ventilation in buildings is generated by differences in air pressure as well as temperature. The resulting air flow patterns are affected more by building geometry that by air speed. Position of outlet has little effect on air flow pattern, but should be high to let rising warm air escape. Outlet should be as lar or larger than inlet or maximum air flow Interior partitions and large furnishings may adversely alter flow patterns 19

2 + winds Wind creates pressure on the windward side of a building and suction on its other three sides. Wind also produces suction on flat roofs, and even on the windward side of roofs with itch less than 7:12 Lee ward -   being in or facing the direction toward which the wind is blowing. Wind ward -   being in or facing the direction from which the wind is blowing. 20

2 + Zoning ordinances Within a municipality or land-use district, zoning ordinances are generally intended to manage growth, regulate land-use patterns, control building density, direct development to areas with adequate services and amenities, protect environmentally sensitive areas, and conserve open space. 21

2 + 22

2 + 23

2 + paving Paving provide a wearing surface for pedestrian or vehicular traffic on site. It is a composite structure whose thickness and construction are directly related to the type and intensity of traffic and loads to be carried, and the bearing capacity and permeability of the subgrade. The subgrade – which must ultimately carry the pavement load, should be undisturbed soil or compacted fill, since it also receives moisture from infiltration, it should be sloped to drain. The base – is a foundation of well-graded aggregate that transfers the pavement load to the subgrade. It also prevents the upward migration of capillary water. The pavement – receives the traffic wear, protects the base, and transfers its load to a base structure. There are two types of pavement: Flexible and Rigid pavement. 24

Pavement color and texture are important aesthetic considerations which also affect the pavement’s absorption or reflection of heat and light Provide traction for ramps and pavements in areas subject to icy conditions Avoid surface irregularities for wheelchair traffic Provide tactile warning strips for the visually impaired at grade changes and hazardous vehicular areas 25

Unit paving details 26

27

Retaining walls Retaining Walls are used to create relatively level areas and to allow changes in elevation which cannot be accomplished by grading within the horizontal dimensions of a site. They must be constructed to resist the thrust of the soil being retained. This thrust can cause a retaining wall to fall in three ways. 28

29

Architectural drawings Architectural drawings make up the graphic language of building, design and construction. In the design process, drawings are used to visualize possibilities, study alternatives, and present design ideas about the form and spaces of a building. Construction drawings consists primarily of plan section and elevation views which are orthographic projections onto a perpendicular drawing surface. 30

Architectural drawings Is a view looking down at a building from above, illustrating its location and orientation on a plot of land and providing information about the site’s topography, landscaping, utilities and site work. SITE PLAN 31

Architectural drawings Are horizontal views of a buildings exterior, usually taken from a point of view perpendicular to the principal vertical surfaces. They illustrate the size, shape, and materials of the exterior surfaces as the size proportion and nature o the doors and windows openings within them. BUILDING ELEVATIONS 32

Architectural drawings Are horizontal views of a buildings exterior, usually taken from a point of view perpendicular to the principal vertical surfaces. They illustrate the size, shape, and materials of the exterior surfaces as the size proportion and nature o the doors and windows openings within them. PARALINE VIEWS/ORTHOGRAPHIC 33

Architectural drawings Is a horizontal view after vertical plane is cut through a building and the front portion is removed. It reveals the vertical and, in one direction, the horizontal dimensions of the buildings spaces. While it illustrates primarily the thickness and construction of floors, roofs and walls, it may also include exterior and interior elevations seen beyond the plane of cut. BUILDING SECTION 34

Building elements A building can generally be broken down into the following physical systems: Structural System Exterior Envelope Interior Subdivisions of Space 35

Loads on buildings In enclosing space of habitation, a building’s structure must be able to support two types of loads – static and dynamic. 36

Loads on buildings STATIC LOADS are assumed to be constant in nature and are of two kinds: DEAD LOADS - are relatively fixed and include the weight of the building structure itself as well as the weights of any permanent elements within the building, such as mechanical equipment's. LIVE LOADS – are movable loads which may not be present all of the time. They include the weights of a buildings occupants and furnishings, as well as snow loads on roofs. 37

Structural forces In the structural analysis of buildings ,we are concerned with the magnitude, direction, and point of application of forces, and their resolution to produce a state of equilibrium. Three conditions are necessary for a structural system to be in equilibrium: The sum (Σ) of all vertical forces = 0 Σ of all horizontal forces = 0 Σ of all moments of all forces about any point = 0 Therefore, as each structural element is loaded, its supporting elements must react with equal but opposite forces. 38

Structural forces Forces can be assumed to be applied in a uniformly distributed manner, as in the case of a live load on a floor or a wind load on a wall. A force can be also a concentrated load, as when a beam bears on a post or a column bears on its footing. Forces may be parallel and collinear, as when a column supports a vertical load from above. They can also be parallel but not meet, as when a beam supports a load at its mid span. These parallel, non-concurrent forces will tend to a cause of a rigid structural element to bend and deflect, which must be resisted by material’s internal strength. 39

Structural forces Any force will tend to cause a body to move in the direction of its line of action. The force can also cause the body to rotate if it does not pass through the body’s center of gravity. The rotational effect of a force is called a moment. For each moment created by the forces acting on a structural element there must be an equal but opposite resisting moment. A number of concurrent forces, acting through a common point can be resolved into a single resultant which is equivalent to a several forces. In a similar manner, an inclined force can be resolved into vertical and horizontal components. 40

Basic structural elements A beam transfers its load laterally along its length to its supports. Due to the non-concurrent forces, a beam is subject to bending. This results in a combination of compressive and tensile stresses which are greatest along the beam’s top and bottom edges. In bending, a beam also becomes subject to horizontal and vertical shear stresses. BEAMS 41

As a general rule, the strength of a beam will increase according to the square of its increase in depth, while its stiffness will increase according to the cube of its increase in depth. Similarly, if a beam’s length is doubled the bending stress will double and it will be able to carry only half of its original load. Its deflection under loading will also increase according to the cube of its increase in length. BEAMS 42

truss A truss consists of short, straight, rigid members assembled into a triangulated pattern. This triangulation is what a truss as a whole is subject to bending, the individual members are subject only to compression or tension. 43

A planar structural element, such as reinforced concrete slab, can span horizontally and transfer its load to its supports by bending. ONE WAY SLAB – Act as a wide, flat beam spanning between two supports. TWO-WAY SLAB – supported along four sides, is more versatile since it provides more paths along which stresses may travel to the supporting elements. PLANAR STRUCTURAL ELEMENT 44

Lateral stability A buildings structural elements must be configured to form a stable structure under any possible load conditions. Therefore while a structural system is designed primarily to carry vertical gravity loads, it must also withstand lateral wind or earthquake forces. Three basic mechanisms for ensuring lateral stability. Diagonal Bracing – (timber or steel) Bracing a frame with diagonal members Rigid Frame – (steel or reinforced concrete developing a frame with rigid joints capable of resisting changes in angular relationships Shear Wall – (wood, concrete, or masonry) Using rigid planar element capable of resisting shape changes 45

Joints and connections Structural elements can be joined to each in three ways. Butt joints allow one of the elements to be continuous and usually require a third mediating element to make the connection. Overlapping joints allow all the connected elements to be continuous across the joint, the structural elements can also be molded or shaped to form the connection. The connectors used to join the structural elements can be in the form of a point, line or surface. While line and surface types of connectors resists rotation, point connectors do not unless distributed across a large surface area 46

47

FOUNDATION SYSTEMS The foundation system is that part of a building’s substructure which transmits the building’s loads down to the supporting soil. These loads include the dead load of the building’s weight and the live load of its occupants and contents. 48

A foundation system typically consists of columns, piers or walls which rest on footings. These footings are the widened parts of the foundation which directly on the soil. They are spread in order to distribute their loads over a wide enough area that the soils bearing capacity is not exceeded. TYPES OF FOUNDATION SYSTEMS 49

Implementing rules and regulations of the national building code of the Philippines ( pd 1096) Includes NBCDO MEMORANDUM CIRCULAR NO. 1, s. 2004 SCHEDULE OF FEES & OTHER CHARGES NBCDO MEMORANDUM CIRULAR NO. 2004-2 NBC FORMS LEGAL OPINIONS P.D. 1096 (National Building Code) R.A 544 (Civil Engineering Law) R.A. 9266 (New Architecture Act of 2004) 50

Rule – 1 general provisions These Rules shall be known and cited as the “Revised Implementing Rules and Regulations of the National Building Code of the Philippines (P.D. 1096)” and shall be referred to as the “IRR”. Section 101. Title 51

SECTION 102. Declaration of Policy It is hereby declared to be the policy of the State to safeguard life, health, property, and public welfare, consistent with the principles of sound environmental management and control; and to this end, make it the purpose of the Code to provide for all buildings and structures, a framework of minimum standards and requirements to regulate and control their location, site, design, quality of materials, construction, use, occupancy, and maintenance. 52

SECTION 103. Scope and Application 1. The scope of this IRR shall cover the following disciplines: architectural, civil/structural, electrical, mechanical, sanitary, plumbing, and electronics. This shall also apply to the design, location, siting, construction, alteration, repair, conversion, use, occupancy, maintenance, moving, demolition of, and addition to public and private buildings and structures, except traditional indigenous family dwellings, and those covered by Batas Pambansa Bilang 220 otherwise known as the “Economic and Socialized Housing Projects”. 53

2. Existing buildings or structures without appropriate building permits/certificates of occupancy may be legalized and issued the necessary permits and certificates, provided, they are made to conform to these rules and regulations. However, they shall be subject to the imposition of penalties, surcharges, fines and other appropriate measures. 3. The applicable and consistent provisions of the allied professional codes and other government agency codes as approved by the DPWH Secretary shall serve as the referral codes of PD 1096 and this IRR. 54

SECTION 104. General Building Requirements 1. All buildings or structures as well as accessory facilities thereto shall conform in all respects to the principles of safe construction and must be suited to the purpose for which they are designed. 2. Buildings or structures intended to be used for the manufacture and/or production of any kind of article or product shall observe adequate environmental safeguards. 3. Buildings or structures and all parts thereof as well as all facilities found therein shall be maintained in safe, sanitary and good working condition. 55

SECTION 105. Site Requirements The land or site upon which will be constructed any building or structure, or any ancillary or auxiliary facility thereto, shall be sanitary, hygienic or safe. In case of sites or buildings intended for use as human habitation or abode, the same shall be at a safe distance, as determined by competent authorities, from streams or bodies of water and/or sources of air considered to be polluted; from a volcano or volcanic site and/or any other building considered to be a potential source of fire or explosion. 56

SECTION 106. Definitions 1. For purposes of this IRR, the following definitions shall apply: ADDITION – Any new construction which increases the height and/or floor area of existing buildings/structures. AGENCY OF THE GOVERNMENT – Refers to any of the various units of the government including a department, bureau, office, instrumentality, or government owned or controlled corporation. ALTERATION – Works in buildings/structures involving changes in the materials used, partitioning, location/size of openings, structural parts, existing utilities and equipment but does not increase the building height and/or floor area. 57

APPLICATION FORMS – A preformatted prescribed application form duly accomplished and notarized by the respective design professional with validation matrices related to other building rules and regulations. APPLICANT/PERMITTEE – Any person, firm, partnership, corporation, head of government or private institution, organization of any character applying for the issuance of permits and certificates. BUILDING OFFICAL – the Executive Officer of the OBO appointed by the Secretary. BUILDING PERMIT – A document issued by the Building Official (BO) to an owner/applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition or other work activity of a specific project/building/structure or portions thereof after the accompanying principal plans, specifications and other pertinent documents with the duly notarized application are found satisfactory and substantially conforming with the National Building Code of the Philippines (the Code) and its Implementing Rules and Regulations (IRR). 58

CODE – PD 1096, otherwise known as the National Building Code of the Philippines. CONSTRUCTION – All on-site work done in the site preparation, excavation, foundation, assembly of all the components and installation of utilities, machineries and equipment of buildings/structures. CONVERSION – A change in the use or occupancy of buildings/structures or any portion/s thereof, which has different requirements. DEMOLITION – The systematic dismantling or destruction of a building/structure, in whole or in part. DEPARTMENT – The Department of Public Works and Highways (DPWH). EXECUTIVE DIRECTOR – The Executive Officer or Head of the NBCDO. 59

MOVING – The transfer of buildings/structures or portion/s thereof from original location or position to another, either within the same lot or to a different one. OFFICE OF THE BUILDING OFFICIAL (OBO) – The Office authorized to enforce the provisions of the Code and its IRR in the field as well as the enforcement of orders and decisions made pursuant thereto. REFERRAL CODES – The applicable provisions of the various agency and technical professional codes that are supplementary to the Code. RENOVATION – Any physical change made on buildings/structures to increase the value, quality, and/or to improve the aesthetic. REPAIR – Remedial work done on any damaged or deteriorated portion/s of building/structure to restore to its original condition. SECRETARY – Head or Chief Executive Officer of DPWH. STAFF – The personnel of the National Building Code Development Office (NBCDO). 60

SECTION 201. Responsibility for Administration and Enforcement The administration and enforcement of the provisions of the Code and this IRR, including the imposition of penalties for administrative violations thereof, is hereby vested in the Secretary. 61

SECTION 202. Technical Staff The National Building Code Development Office (NBCDO) created through DPWH Department Order, shall serve as the technical staff of the Secretary. The functions thereof are as follows: 1. Assist the Secretary in the administration and enforcement of the provisions of the Code and its IRR. 2. Review, evaluate and take final action on various technical and legal problems forwarded to the Office of the Secretary. 3. Conduct seminar/workshops on the Code, its IRR, and Batas Pambansa Blg . 344 (Accessibility Law). 4. Undertake such other duties and tasks as may be assigned by the Secretary from time to time. 62

SECTION 203. General Powers and Functions of the Secretary 1. Formulate policies, plans, standards and guidelines on building design, construction, use, occupancy and maintenance, in accordance with the Code. 2. Issue and promulgate additional rules and regulations in the form of Memorandum Circulars to implement the provisions of the Code and ensure compliance with policies, plans, standards and guidelines and issue office guidelines or Memorandum Circulars to guide the actions of the Building Official in the performance of his duties and responsibilities. 3. Exercise appellate jurisdiction over the decisions and orders of the Building Official. The order or decision of the Secretary shall be final and executory subject only to review by the Office of the President of the Republic. 63

4. Evaluate, review, approve and/or take final action on changes and/or amendments to existing Referral Codes as well as on the incorporation of other referral codes, which are not yet expressly made supplementary to the Code and its IRR. 5. Prescribe and impose the amount of fees and other charges as may be deemed necessary that the Building Official shall collect in connection with the performance of regulatory functions. 6. Appoint a Building Official, separate and distinct from the Office of the City/Municipal Engineers in all Cities and Municipalities . 64

SECTION 208. Fees 1. The Secretary, thru Memorandum Circulars, shall prescribe the rates of fees and formulate guidelines in the imposition and collection of fees. 2. Subject to existing budgetary, accounting and auditing rules and regulations, the Building Official shall retain not more than 20% of the income/collection derived from permit fees and other charges for the operating expenses of his office. The remainder of 100% shall accrue to the general fund of the respective city/municipality. 3. Every Building Official shall keep a permanent record and accurate account of all fees and other charges fixed and authorized to be collected and received. 65

SECTION 209. Exemption Public buildings and traditional indigenous family dwellings shall be exempt from payment of building permit fees. As used in the Code, the term “traditional indigenous family dwelling” means a dwelling intended for the use and occupancy by the family of the owner only and constructed of native materials such as bamboo, nipa , logs, or lumber, the total cost of which does not exceed fifteen thousand pesos (P 15,000.00). 66

SECTION 212. Administrative Fines a. The Secretary or his duly authorized representative may prescribe and impose fines not exceeding ten thousand pesos (P10, 000.00) in the following cases, subject to the terms and procedures as hereunder provided: i . Erecting, constructing, altering, repairing, moving, converting, installing or demolishing a private or public building/structure if without building/demolition permit. ii. Making any alteration, addition, conversion or repair in any building/structure/ appurtenances thereto constructed or installed before the adoption of the Code, whether public or private, without a permit. Imposition of Administrative Fines 67

iii. Unauthorized change, modification or alteration during the construction in the duly submitted plans and specifications on which the building permit is based. iv. Non-compliance with the work stoppage order or notice and/or orders to effect necessary correction in plans and specifications found defective. v. Non-compliance with order to demolish building/structure declared to be nuisance, ruinous or dangerous. vi. Use or occupancy of a building/structure without Certificate of Occupancy/Use even if constructed under a valid building permit. vii. Change in the existing use or occupancy classification of a building/structure or portion thereof without the corresponding Certificate of Change of Use. viii. Failure to post or display the certificate of occupancy/use/operation in a conspicuous place on the premises of the building/structure/appurtenances. ix. Change in the type of construction of any building/structure without an amendatory permit. 68

a. In the determination of the amount of fines to be imposed, violations shall be classified as follows: i . Light Violations (a) Failure to post Certificate of Occupancy/Use/Operation. (b) Failure to post Building Permit construction information sign. (c) Failure to provide or install appropriate safety measures for the protection of workers, inspectors, visitors, immediate neighbors and pedestrians. ii. Less Grave Violations (a) Non-compliance with the work stoppage order for the alteration/addition/ conversion/repair without permit. (b) Use or occupancy of building/structure without appropriate Certificate of Occupancy/Use/Operation. Determination of Amount of Fines 69

iii. Grave Violations (a) Unauthorized change, modification or alteration during construction in the duly submitted plans and specifications on which the building permit is based. (b) Unauthorized change in type of construction from more fire-resistive to less fire resistive. (c) Non-compliance with order to abate or demolish. (d) Non-compliance with work stoppage order for construction/demolition without permit. (e) Change in the existing use or occupancy without Certificate of Change of Occupancy/Use/Operation. (f) Excavations left open without any work being done in the site for more than one hundred twenty (120) days. 70

SECTION 214. Dangerous and Ruinous Buildings or Structures Dangerous buildings are those which are herein declared as such or are structurally unsafe or not provided with safe egress, or which constitute a fire hazard, or are otherwise dangerous to human life, or which in relation to existing use, constitute a hazard to safety or health or public welfare because of inadequate maintenance, dilapidation, obsolescence, or abandonment; or which otherwise contribute to the pollution of the site or the community to an intolerable degree 71

SECTION 215. Abatement of Dangerous Buildings 1. Structural Hazards a. Whenever any building/structure or portion thereof has been damaged by fire, earthquake, wind, flood, or by any other cause to such an extent that the structural strength or stability thereof is materially less than it was before the catastrophe and is less than the minimum requirements of the National Structural Code of the Philippines (NSCP) for new buildings of similar structure, purpose or location. b. Whenever any portion or member or appurtenances thereof is likely to fall, or to become detached or dislodged or to collapse and thereby injure persons or damage property. c. Whenever any portion of a building/structure or any member, appurtenance or ornamentation on the exterior thereof is not of sufficient strength or stability, or is not anchored, attached or fastened in place so as to be capable of resisting a wind pressure of one-half of that specified in the NSCP for such type of buildings. 72

SECTION 215. Abatement of Dangerous Buildings d. Whenever any portion thereof has been wrecked, warped, buckled or settled to such an extent that the walls or other structural portions have materially less resistance to wind or earthquake than is required in the case of similar new construction. e. Whenever the building/structure or any portion thereof, because of: (1) dilapidation, deterioration or decay; (2) faulty construction; (3) the removal, movement or instability of any portion of the ground necessary for the purpose of supporting such building; (4) the deterioration, decay or inadequacy of its foundation; or (5) any other cause, is likely to partially or totally collapse. f. Whenever the exterior walls or other vertical structural member lean or buckle to such an extent that a plumb line passing through the center of gravity does not fall inside the middle one-third of the base. g. Whenever the building/structure, exclusive of the foundation, shows 33% or more damage or deterioration of its supporting member or members, or 50% damage or deterioration of its non supporting members, enclosing or outside walls or coverings. 73

SECTION 215. Abatement of Dangerous Buildings h. Whenever the building/structure has been so damaged by fire, wind, earthquake or flood, or has become so dilapidated or deteriorated as to become: (1) an attractive nuisance to public; (2) a harbor for vagrants, criminals or immoral persons; or (3) a resort for purposes of committing unlawful or immoral acts. i . Whenever the building/structure which, whether or not erected in accordance with all applicable laws or ordinances, has in any non-supporting part, member or portion, less than 50% or in any supporting part, member or portion less than 66% of the: (1) strength; (2) fire-resisting qualities or characteristics; (3) weather-resisting qualities or characteristics required by law in the case of a newly constructed building of like area, height and occupancy in the same location. j. Whenever any portion of a building/structure remains on the site after its demolition or whenever any building/structure or portion thereof is abandoned for a period in excess of twelve (12) months so as to make it a nuisance or hazard to the public. 74

SECTION 215. Abatement of Dangerous Buildings 2. Fire Hazards a. Any building/structure or portion thereof, device, apparatus, equipment material, or vegetation which may cause fire or explosion, or provide a ready fuel or augment the speed and intensity of fire or explosion arising from any cause. b. All buildings/structures or portions thereof not provided with the required fire-resistive or fire protective construction or fire-extinguishing system or equipment. c. Whenever any door, aisle, passageway, stairway, or other means of exit is not of sufficient width or size, or is not so arranged as to provide safe and adequate means of exit in case of fire and panic. d. Whenever any building/structure, because of obsolescence, dilapidated condition, deterioration, damaged, inadequate exits, lack of sufficient fire-resistive construction, hazardous electric wiring, gas connections or heating apparatus, or other cause, in violation of the Fire Code of the Philippines (PD 1185). 75

SECTION 215. Abatement of Dangerous Buildings 3. Unsafe Electrical Wiring a. All wiring systems or installations which do not conform to the rules and regulations embodied in the latest Philippine Electrical Code. b. Inadequately maintained or improperly used electrical wirings, outlets, devices and/or equipment. 4. Unsafe Mechanical Installation a. Mechanical systems or installations which do not conform to the rules and regulations embodied in the Philippine Mechanical Code. b. Inadequately maintained or improperly used mechanical outlets, devices and/or equipment. c. Lack of or improper operation of required ventilating equipment or air-conditioning systems. d. Improperly installed or lack of protection and safety provisions on steam, gas and fuel supply lines. 76

SECTION 215. Abatement of Dangerous Buildings 5. Inadequate Sanitation/Plumbing and Health Facilities a. All sanitation and plumbing systems or installations which do not conform to the rules and regulations embodied in the Code on Sanitation of the Philippines and the Revised National Plumbing Code. b. Inadequately maintained or improperly used sanitation and plumbing facilities. c. Infestation of insects, vermin or rodents and lack of adequate control for the same. d. Lack of adequate garbage and rubbish storage and removal or disposal facilities. e. Source of pollution. 6. Architectural Deficiency a. All buildings/structures or portion thereof used or occupied for purposes other than their intended uses. b. Improper/Unauthorized Occupancy/Location. c. Insufficient amount of natural light and ventilation due to inadequate open spaces such as courts and yards as required. d. Inadequate sizes of rooms and space dimensions and window openings. e. Dilapidated, blighted and other unpresentable buildings/structures against generally accepted aesthetic standards. 77

RULE III - PERMITS AND INSPECTION 1. No person, firm or corporation, including any agency or instrumentality of the government shall construct, alter, repair, convert, use, occupy, move, demolish and add any building/structure or any portion thereof or cause the same to be done, without first obtaining a building permit therefor from the Building Official assigned in the place where the subject building/structure is located or to be done. The prescribed application for building permit form (NBC Form B-01) shall be used by all applicants. 2. Permits supplementary to a Building Permit shall be applied for and issued by the Building Official. These include Ancillary and the Accessory Permits. 78

a. Ancillary Permits The Ancillary Permits duly signed and sealed by the corresponding professionals and the plans and specifications shall be submitted together with the duly notarized application for Building Permit. The Building Permit is null and void if not accompanied by the Ancillary Permits. The prescribed Ancillary and other Accessory Permits/forms shall likewise be used whenever applicable. The Ancillary Permits are the following: i . Architectural Permit ii. Civil/Structural Permit iii. Electrical Permit iv. Mechanical Permit v. Sanitary Permit vi. Plumbing Permit vii. Electronics Permit 79

b. Accessory Permits i . Accessory Permits are issued by the Building Official for accessory parts of the project with very special functions or use which are indicated in the plans and specifications that accompany the building permit application. These may include, among others: bank and records vaults; swimming pools; firewalls separate from the building/structure; towers; silos; smokestacks; chimneys; commercial/industrial fixed ovens; industrial kilns/furnaces; water/waste treatment tanks, septic vaults; concrete and steel tanks; booths, kiosks and stages; and tombs, mausoleums and niches. ii. Accessory Permits are issued by the Building Official for activities being undertaken prior to or during the processing of the building permit. The coverage is spelled out in the accessory permit form including the expiry period. These shall be signed by the concerned owner/applicant and by the concerned professionals. These permits include, among others, ground preparation and excavation, encroachment of foundation to public area, fencing, for fence not exceeding 1.80 meters high, sidewalk construction, temporary sidewalk enclosure and occupancy, erection of scaffolding, erecting, repair, removal of sign; and demolition. 80

3. Exemption From Building Permits A building permit shall not be required for the following minor constructions and repairs, provided these shall not violate any provision of the Code and this IRR. a. Minor Constructions i . Sheds, outhouses, greenhouses, children’s playhouses, aviaries, poultry houses and the like, not exceeding 6.00 sq. meters in total area, provided they are completely detached from any other building and are intended only for the private use of the owner. ii. Addition of open terraces or patios resting directly on the ground, not exceeding 20.00 sq. meters in total floor area, exclusively for the private use of the owner. iii. Installation of window grilles. iv. Garden pools for the habitation of water plants and/or aquarium fish not exceeding 500 millimeters in depth and exclusively for private use. 81

v. Garden masonry walls other than party walls not exceeding 1.20 meters in height, footpaths, residential garden walks and/or driveways. b. Repair Works i . Repair works not affecting or involving any structural member, such as replacement of deteriorated roofing sheets or tiles, gutters, downspouts, fascia, ceilings and/or sidings. ii. Repair and/or replacement of non load-bearing partition walls. iii. Repair and/or replacement of any interior portion or a house not involving addition or alteration. iv. Repair and/or replacement work of doors and windows. v. Repair and/or replacement work of flooring. vi. Repair of perimeter fence and walls. vii. Repair and/or replacement of plumbing fixtures, fittings or pipings , such as toilet bowls, sinks, lavatories, urinals, bidets, pipes, faucets, valves for single detached dwellings and duplexes. 82

SECTION 302. Application for Permits 1. Any person desiring to obtain a building permit and any ancillary/accessory permit/s together with a Building Permit shall file application/s therefor on the prescribed application forms. 2. Together with the accomplished prescribed application form/s, the following shall be submitted to the OBO: a. In case the applicant is the registered owner of the lot: i . Certified true copy of OCT/TCT, on file with the Registry of Deeds, ii. Tax Declaration, and iii. Current Real Property Tax Receipt. b. In case the applicant is not the registered owner of the lot, in addition to the above; duly notarized copy of the Contract of Lease, or Deed of Absolute Sale. 83

SECTION 302. Application for Permits 3. Five (5) sets of survey plans, design plans, specifications and other documents prepared, signed and sealed over the printed names of the duly licensed and registered professionals (Figs. III.1. and III.2.): a. Geodetic Engineer, in case of lot survey plans; b. Architect, in case of architectural documents; in case of architectural interior/interior design documents, either an architect or interior designer may sign; c. Civil Engineer, in case of civil/structural documents; d. Professional Electrical Engineer, in case of electrical documents; e. Professional Mechanical Engineer, in case of mechanical documents; f. Sanitary Engineer, in case of sanitary documents; g. Master Plumber, in case of plumbing documents; h. Electronics Engineer, in case of electronics documents. 84

a. Architectural Plans/Drawings i . Vicinity Map/Location Plan within a 2.00 kilometer radius for commercial, industrial, and institutional complex and within a half-kilometer radius for residential buildings, at any convenient scale showing prominent landmarks or major thoroughfares for easy reference. ii. Site Development Plan showing technical description, boundaries, orientation and position of proposed building/structure in relation to the lot, existing or proposed access road and driveways and existing public utilities/services. Existing buildings within and adjoining the lot shall be hatched and distances between the proposed and existing buildings shall be indicated. Architectural Documents 85

iii. Perspective drawn at a convenient scale and taken from a vantage point (bird’s eye view or eye level). iv. Floor Plans drawn to scale of not less than 1:100 showing: gridlines, complete identification of rooms or functional spaces. v. Elevations, at least four (4), same scale as floor plans showing: gridlines; natural ground to finish grade elevations; floor to floor heights; door and window marks, type of material and exterior finishes; adjoining existing structure/s, if any, shown in single hatched lines. vi. Sections, at least two (2), showing: gridlines; natural ground and finish levels; outline of cut and visible structural parts; doors and windows properly labeled reflecting the direction of opening; partitions; built-in cabinets, etc.; identification of rooms and functional spaces cut by section lines. vii. Reflected ceiling plan showing: design, location, finishes and specifications of materials, lighting fixtures, diffusers, decorations, air conditioning exhaust and return grills, sprinkler nozzles, if any, at scale of at least 1:100. 86

87

88

89