Caribbean Port Efficiency: Challenges and Opportunities

caribank 186 views 21 slides Jul 12, 2018
Slide 1
Slide 1 of 21
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21

About This Presentation

This presentation was delivered by S. Brian Samuel, PPP Coordinator, CDB, at the Bank's 47th Annual Meeting in Montego Bay, Jamaica on May 19, 2016. For more information about port efficiency in the Caribbean, visit www.caribank.org.


Slide Content

Caribbean Port Efficiency:
Challenges and Opportunities
S. Brian Samuel
PPP Coordinator
Caribbean Development Bank
CDB 46
th
Annual General Meeting,
19
th
May 2016, Montego Bay, Jamaica

Contents
1.Why we need to improve our ports
2.Bottlenecks and challenges
3.Trends in trade
4.Port PPPs: A Kingston case in point
5.New kids on the block: cruise ship terminals
6.Port investment opportunities

Why improve our ports?
•Efficiency of ports impacts the Region’s competitiveness
•By international comparison, our ports are inefficient
•Hence port efficiency deserves policy attention
•Lack of infrastructure hinders development of exports
•CDB commissioned a major regional port study, by
Maritime and Transport Business Solutions (MTBS:
•“To stimulate new perspectives with respect to policies,
practices and institutions required for enhancing efficiency”

Wide disparity in port infrastructure
CARICOM Wharf, Port of Spain
Carenage, Grenada
Kingston Container Terminal

Efficiency levels generally low:
7 dimensions: Productivity, Labour, Infrastructure,
Equipment, Nautical access, IT and Autonomy
Port with the highest efficiency rating (Nassau) is a
Public-Private Partnership

Bottlenecks and challenges:
•Poor state of port infrastructure: Falling into the sea
•Institutional setting: Very little private sector participation
•Accessibility: Continental shelves and sheltered harbours
•Lack of integrated IT systems: Archaic manual processes
•Low throughputs: Below the radar of private port operators
•Overstaffing: Outdated regulations and politicized unions
•Poor landside infrastructure: Ports squeezed downtown
•Old vessels: Outcasts from Europe and North America

Trade and shipping trends:
•Maritime connectivity is limited to the main transhipment
hubs: Kingston, Freeport, San Juan, P-o-S, Dom Rep
•With expanded Panama Canal, transhipment and larger
vessel sizes will continue
•Private sector participation in larger ports. Paramaribo,
Bahamas: examples of the private sector improving efficiency
•Ship sizes are increasing: new generation of post-Panamax
vessels carry 18,000 TEUs; more than the annual traffic of
Grenada

Everyone wants a hub:
•The Caribbean Basin is characterized by high trans-
shipment activity
•Large shipping lines call at few conveniently situated hubs
(close to major trade routes)
•Trans-shipment results in increased transport costs
incurred by smaller islands that cannot receive direct calls
•With increasing ship sizes, trans-shipment will also
increase

Main transshipment ports:

Divergent growth forecasts:

Different strategies for different sizes:
Mature larger ports:
•High growth requires investment in infrastructure &
equipment
•Labourrestructuring usually necessary
•Exploit trans-shipment opportunities
•Involve private sector (large enough to attract attention
from private port operators)

Different strategies for different sizes:
OECS & other smaller ports:
•Limited growth potential
•Large infrastructure projects uneconomic due to small
scale
•Requires regional vision & cooperation
•Training, labourrationalization & IT/studies needed

Port PPPs: Kingston case in point
•Seeking to capitalize on expansion of the Panama Canal,
Jamaica launched expansion and divestment of Kingston
Container Terminal (KCT) via a 30-year Concession
•After a transparent bid process, world’s largest shipping
company CMA-CGM selected as Preferred Bidder;
financial closing underway
•Will double the capacity of KCT, in a major expansion
project
•Multi-party support for this and other transport projects

New kids on the block: Cruise ports
•Cruise ships are the fastest growing segment of the
Caribbean tourist market
•60% of the world’s cruise ships winter in the Caribbean
•New generation beyond capacity of traditional terminals
•Cruise lines building captive terminals: Labadie Haiti and
Falmouth Jamaica
•New cruise terminals will free up space for cargo
•Urgently needed in the OECS, due to heavy congestion in
urban areas

Congestion hindering cruise traffic:
RedcliffeQuay, St John’s Antigua

Potential port capital expenditures:
•About $750 million needed in new port infrastructure and
equipment over the next 10-15 years
•Most of this investment will be public sector
•Options for PPPs limited to larger ports/projects

Recommendations for BMCs (1):
•Port projects are capital intensive and require prudent
investment decisions
•Especially in the OECS, there is a need regional
cooperation –not all port expansion projects will be viable
•Allow Port Authorities greater autonomy. Political
interference limits ability to operate on an efficient basis. A
higher degree of autonomy can be realized through private
sector involvement

Recommendations for BMCs (2):
•Recognize the need for labourrestructuring. In many
ports labouris organized under traditional rules from
the breakbulk era. This is unsustainable in the
container age
•Adopt a long term port development vision. The lack of
a long term vision hampers development as investors
are uncertain of the future

Recommendations for CDB (1):
•Get involved early in the process (master plan,
feasibility studies, reform measures) in order to secure a
position for subsequent infrastructure lending
•Emphasize the urgent need for port investments and
modernization among BMCs, as low port efficiency
affects the competitiveness and economic growth of the
Region

Recommendations for CDB (2):
•Combine funding with port reform; CDB should use its
influence in realizing port and/or labourreform
•Grant/concessionary funding needed for smaller OECS
ports
•Formulation of regional port strategy for the OECS. Port
investments are often not financially feasible; it would be
a waste of resources if all OECS countries invested in
deep-sea facilities

Thank you!