PEMBINAAN LOJI RAWATAN KUMBAHAN BERPUSAT, RANGKAIAN PAIP PEMBENTUNGAN DAN TEBATAN BANJIR DI SUNGAI SEGGET, JOHOR BAHRU BENGKEL KOORDINASI ANTARA PACKAGE 1: PEMBINAAN LOJI RAWATAN KUMBAHAN BERPUSAT DENGAN KAPASITI 150,000 P.E. DAN KERJA-KERJA YANG BERKAITAN DENGANNYA DI ATAS LOT 20216 DAN PTB 20476, JOHOR BAHRU, JOHOR DARUL TAKZIM SECARA REKA DAN BINA. PACKAGE 2: MEMBINA DAN MENYIAPKAN TEBATAN BANJIR, RANGKAIAN PAIP PEMBENTUNGAN, KERJA-KERJA LANSKAP, PENGALIHAN UTILITI DAN KERJA-KERJA BERKAITAN DI DALAM RIZAB SUNGAI SEGGET DAN JALAN WONG AH FOOK, JOHOR DARUL TAKZIM.
Carta Alir / Proses Bagi Kompleks Rawatan Air Sungai Segget Sewage Incoming Q=29,137m 3 /day Primary Screen Chamber Wet Well Dry Pit SecondaryScreen Chamber Grit & Grease Chamber EQ Tank SBR Level 2 SBR Level 1 SHT Thickened SHT Sand Filter System + UV River Drum Thickener Centrifuge Decanter DRY CAKE Sand Sedimentation Sludge Treatment Biological Treatment Primary Treatment Inlet Sump (total 150,000PE) Q avg =33,750m 3 /day Q peak =91,412m 3 /day River Water Q=2915m 3 /day River Intake Station (temporary until sewer line completed)
“Catchment” Wadihasan PE=36,000 PE Q=8100m 3 /day 0.09m 3 /s “Catchment” Wadihana PE=34,000 PE Q=7650m 3 /day 0.09m 3 /s Kompleks Rawatan Air Sungai Segget 150,000PE Q avg =33,750m 3 /day “Catchment “ Pusat Bandar PE=80,000 PE Q= 18,000m 3 /day 0.21m 3 /s MH1 MH6 MH8 Baki : 1,541PE= 347m 3 /day Baki : 3,191PE= 718m 3 /day Baki : 15,769PE= 3,548m 3 /day
Existing Private STP For CBD Within Sungai Segget Catchment
MENARA PUBLIC BANK=1,692PE CITY SQUARE=7,000PE MAYBANK=296PE MERLIN TOWER=2,468PE HOTEL GATEWAY=49PE GRAND PARADISE HOTEL =105PE OCEAN PARADISE HOTEL =81PE COMPACT HOTEL @ JA RESIDENT=328PE MAYBANK BANK=65PE HONG LEONG BANK=58PE UMNO/MCA=94PE MAYBANK FINANCE=28PE OCBC BANK=109PE HOTEL TROPICAL INN=1,966PE PAN GLOBAL PLAZA=183PE WISMA LKN=889PE KOMTAR=5,000PE WISMA MARIA=81PE SEKOLAH=377PE MENARA LANDMARK=5,335PE TEMPAT BERIBADAT=211PE PERSADA JOHOR=700PE HOTEL PUTERI PACIFIC=3,608PE MENARA ANSAR=1,500PE KOTARAYA=3,244PE TRIUMPH HOTEL=177PE MENARA TM ASIA LIFE-EON BANK=338PE MAYBANK=56PE BANK NEGARA=279PE BANK PERTANIAN=69PE AIA=349PE MATEX, SERVICE APARTMENT/HOTEL=2,779PE MIDWEST EQUITY, COMMERCIAL SUITES=3,914PE KOMTAR=4,800PE BSN=773PE BELLO HERITAGE S.B., HOTEL=196PE “Future Land Use Under Committed Development” 13,762PE PRIVATE STP 36,187PE 49,949PE “INDIVIDUAL SEPTIC TANK(IST)” & “COMMUNAL SEPTIC TANK(CST)” 9,771PE Jumlah : 59,720PE Baki : 20,280PE BUMACI HOLDINGS S.B., COMMERCIAL SUITES=1300PE
“CATCHMENT 1” PE sedia ada 45,958PE=10,341m 3 /day Kebenaran merancang 13,762PE=3,096m 3 /day Jumlah : 59,720PE=13,437 m 3 /day Baki : 20,280PE= 4,563m 3 /day