labour charges such as
9.995
Machine mixing, vibrating, curing etc., -domical
roof - SF
1
cum 61,141 6,11,105
Cum
5
V.R.C.C (1:1 1/2 :3) 20mm size HBG, machine
crushed chips including cost,
seignorage and conveyance of all materials and labour charges such as
7.752
Machine mixing, vibrating, curing etc., -conical dome base slab - SF
1
cum 25,035 1,94,072
Cum
6
V.R.C.C (1:1 1/2 :3) 20mm size HBG, machine crushed chips including cost,
126.635
cum
seignorage and conveyance of all materials and labour charges such as
1
cum 7249 9,17,978
Machine mixing, vibrating, curing etc., -cylindrical wall - SF
7
V.R.C.C (1:1 1/2 :3) 20mm size HBG, machine crushed chips including cost,
3.675
seignorage and conveyance of all materials and labour charges such as
Machine mixing, vibrating, curing etc., -ring beam at bottom of cylindrical wall - SF
Cum
1
cum 7,854.636 28,866
8
3.845 cum
V.R.C.C (1:1 1/2 :3) 20mm size HBG, machine crushed chips including cost, seignorage and
conveyance of all materials and labour charges such
as Machine mixing, vibrating, curing etc., -circular
girder - SF
1
cum 6,914 26,585
9
11.751
cum
V.R.C.C (1:1 1/2 :3) 20mm size HBG, machine crushed chips including cost seignorage and conveyance of all materials and labour charges such as
1
cum 25,035 29,4,187
Machine mixing, vibrating, curing etc., - inclind cone shaped slab - SF
10
1.668
cum
V.R.C.C (1:1 1/2 :3) 20mm size HBG, machine crushed chips including cost seignorage and conveyance of all materials and labour charges such as
1
cum 7,498 12,507
Machine mixing, vibrating, curing etc., - Bracing at 4m heigh - SFt