1-GairnsJ F 1904. Industrial locomotives for mining, factory, and allied uses. Part
II. Compressed air and internal combustion locomotives Cassier'sMag. 16363-77.
2-SAE 1999-01-0623, Schechter.M., “New Cycles for Automobile engines.
3-ISSN: 2456-1843, STUDY AND FABRICATION OF COMPRESSED AIR
ENGINE Ruby Sharma ,NaveenSingla, vol.1, January 2015, pp:27.
4-HE Wei et al. “Performance study on three-stage power system of compressed
air vehicle based on single-screw expander” science china, technological sciences,
August 2010, pp:2299–2303.
5-Huang, C.H., Hu, C.K., Yu, C.J., et al. (2013) Experimental Investigation on the
Performance of a Compressed-AirDrivenPiston Engine. Energies, 6, 1731-1745.
http://dx.doi.org/10.3390/en6031731
6-Tokhi, M.O., Al-Miskiry, M. and Brisland, M. (2001) Real Time Control of Air
Motors Using a Pneumatic H-Bridge.ControlEngineering Practice, 9, 449-457.
http://dx.doi.org/10.1016/S0967-0661(00)00122-2