TEAM Approach of Data Centre Facility Design
7
Telecommunication (ICT and Cabling System)
Entrance Room (Carrier Room)
Main Distribution Area (Meet Me Room)
Zone Distribution Area (End of Row)
Horizontal Distribution Area (Top of Rack)
Equipment Distribution Area (Rack)
ICT System (Info-Sec, Network, LAN, Mesh Wi-Fi, HCI Stack, etc.)
Electrical (Power System)
Power Supply (HT-AVR, HT Panel, Transformer, ATS-PFI-Synch)
Power Automation (DCIM, BCM, SCCS, Live SLD, Mini-SCADA)
Power Protection (UPS, Battery, Gen-Set, Fuel System, SRG)
Power Distribution (LT Panel, BBT, Bus-Way, TOB, AC-DC, PDU)
Power Infrastructure (Usage Policy, Ventilation, Exhaust, Billing)
Documentation (AHJ Approval, BCM, Crisis Management, AMC, etc.)
Data Hall (Rack, Containment, Raise Floor, Return Air, Thermal Insulation)
HVAC System (Chiller, PAHU, PAC, CAC, Dose, Thermal Storage)
Chiller Plumbing (Motor, Valve, Insulated Pipe, EMS, WLD)
Building Technology (DCIM, BMS, LAN, Mesh Wi-Fi, HCI Stack)
Safety System (Rodent, AFSS with Clean Agent and Plumbing)
Security System (Access, Surveillance, Man-Trap, Barrier, PAVA)
Mechanical (HVAC and BMS System)
Sire Selection (Seismic Zone, Flood History, Connectivity, etc.)
Layout and Area Plan with Vehicle, Human and Cargo Movement
Construction (Dismantling, Décor, Load Bearing Capacity of Slab)
Workspace (Office, FOC, NOC, SOC, Stage, Store, Lounge, Dorm)
Operations Centre (Video Wall, Video Matrix Controller, Roster)
Documentation (Usage Policy, Labeling, Certification, Contract)
Architectural (Structure and Workspace System)
TEAM Approach of Data Centre Design