Design Group Corporate Profile

gurudevgoud 2,376 views 121 slides Dec 13, 2012
Slide 1
Slide 1 of 121
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85
Slide 86
86
Slide 87
87
Slide 88
88
Slide 89
89
Slide 90
90
Slide 91
91
Slide 92
92
Slide 93
93
Slide 94
94
Slide 95
95
Slide 96
96
Slide 97
97
Slide 98
98
Slide 99
99
Slide 100
100
Slide 101
101
Slide 102
102
Slide 103
103
Slide 104
104
Slide 105
105
Slide 106
106
Slide 107
107
Slide 108
108
Slide 109
109
Slide 110
110
Slide 111
111
Slide 112
112
Slide 113
113
Slide 114
114
Slide 115
115
Slide 116
116
Slide 117
117
Slide 118
118
Slide 119
119
Slide 120
120
Slide 121
121

About This Presentation

DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to cater to the Design Engineering needs of small civil Engineering and Electrical Engineering projects, has now growth into a full fledged Consultancy Organisation, providing its Design Engineering Consultancy services...


Slide Content

An Engineering Consulting
Company

Content  

Content 
Sl. No.  Description  Page No. 
1  Design Group – A Profile  1 
2  ISO Certificate  4 
3  Certificate of Consulting Engineers Association of India  5 
4  Certificate of  Incorporation  6 
5  Empanelment with BHEL   7 
6  Empanelment with Construction Industry Development 
Council 

7  Merger of M/s. Subhadra Consulting Engineers with M/s. 
Design Group Project Consultants Pvt Ltd 

8  Experience ‐ write up on Sa
 Projects  11 
9  List of Project on Hand  26 
10  Organization Structure  
  A. Panel of Consultants / Advisors   30 
  B. Technical Personnel   32 
11  List of Project /Assignments Successfully Completed  
  A. Desk Study Report   34 
  B. Detailed Engineering of Projects  36 
  C. Preparation of Detailed Project Re
  43 
  D. Pre‐Feasibility Studies of Power Projects  50 
  E. Pre‐ Tender Services  59 
  F. Due Diligence Report  67 
12  A few Certificates for Successfully Completed  Projects  72 
13  Brief Profile of Advisor / Consultants  
  a) Advisor  
  ¾ H.V. Eswaraiah, Hydro Power Projects  89 
  ¾ Shankar V. Ne
 Wind Energy  90 
  ¾ P.R. Balasubramanian, Gas Based Power Plant  91 
  ¾ B.V Ramakrishnaiah,  Gates & Penstocks  92 
  ¾ Balachandran. V, Engineering Geology  93 
  ¾ C.R. Venkatesh , Hydro Power Projects  94 

Content  

Sl. No.  Description  Page No. 
  ¾ M.C. Rangarajan, E & M Works  95 
  ¾ S. Ramanan, Hydro Power Projects  96 
  ¾ Umashankar, Steel Structure  97 
  ¾ Narayanan V, Transmission Line  98 
  ¾ Channakeshava  C, Computer aided designs  99 
  ¾ Shridhar Prabhu, Legal Advisor, PPA  100 
  ¾ Srinath. N, Environmental Engineering  101 
  b) Consultants  
  ¾ C.S. Hebli, Chairman  102 
  ¾ B.L La
 Chief Executive Officer  103 
  ¾ P.R Mallikarjuna, Executive Director (Design Head)  104 
  ¾ P.K. Rupangudi , Director (Gates, Dams design)  105 
  ¾ Chikkaguddappa Director (Project Development  106 
  ¾ Raghavendra  Rao H, Director (Electrical Generation) 107 
  ¾ M.M. Reddy, Director (Transmission line, 
Switchyard & Sub‐Station) 
108 
  ¾ R .
Vasudevan, Deputy Director (Water & Waste 
Water) 
109 
  ¾ U.R. Raghotham , Director (Tunnel and Dam design) 111 
  ¾ G. Penchalaiah, Irrigation Project – Investigation  112 
  ¾ Suryanarayana, Engineering Geology  113 
  ¾ K. T. Sreedhara, Deputy Director (Irrigation)  114 
  ¾ Achutha Narayana, Deputy Director (Hydro civil 
de
sign) 
116 
  ¾ T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based 
Power Plant) 
117 
  ¾ P Sudarshan Rao, Manager (Electrical Generation)  118 

 
A Profile 

 
1. DESIGN  GROUP –A PROFILE 
 
was established in 1979 to offer consultancy 
services  for civil and electrical engineering 
projects. Having completed over 100 prestigious and varied assignments in the last 5 
years, DG is a leading consultancy firm,  offering full‐fledged consultancy services 
across various fields of engineering in India and Abroad.  
 
Equipped to provide de
 consultancy on very large engineering projects, DG has 
been providing technical consultancy services  to various organizations and 
companies for planning, detailed  design, and implementation of Hydel, thermal, 
and other power projects. These services  include analysis of financial aspects, design  
engineering for electrical installation of substations, switchyards and transmission 
lines, design en
 for civil engineering structures  including large dams, 
tunnels , canals, power canals, cross drainage works, surge tanks, penstock , and 
power houses. DG also provides services  related to other civil engineering fields of 
Irrigation, Water Supply, and Waste Water Treatment.   
 
DG, which has an annual turnover of over Rs.400  la
 provides consultancy 
services  required for the implementation of projects, right from concept to 
completion, commissioning, operation and maintenance, thereafter. DG’s services 
have been utilized by Large Industrial Houses, Firms, and Independent Power 
Producers in India, and elsewhere, for the planning and design engineering of their 
projects. In year 2004, DG wa
 honored with an ISO 9001:2008 certification for its 
design engineering services and  continues to hold the certification. 
 
DG have entered into MOU/ JV with number of large institution to name a few 
Messers:  
1) WAPCO New Delhi. 
2) ILF Consulting Engineer, Austria 
DESIGN GROUP 

 
A Profile 

3) GEM Engineering Company Ltd., Uganda 
4) IL&FS Ltd., Hyderabad  
5) NihamShand Cape town South Africa 
6) Land Mark Holding Ltd. Nairobi, Kenya 
7) SSDC Damam KSA 
 
 
 
DG has been empanelled in a few public sector undertakings. 
1) BHEL for extending design engineering services  in Hydro Power projects  
2) Karnataka  Neeravari Nigam Limited for engineering services  for Water 
Resources Projects. 
3) PFC consulting Limited, New Delhi for Power Projects. 
 
Our clients include Messers 
1) Nuclear Power Corporation Li
mited. 
2) Gammon India Limited. 
3) Fichtner Limited. 
Corporate Office

 
A Profile 

4) GMR Energy Limited. 
5) ILFS Infra Limited.  
6) WAPCO 
7) NTPC 
8) BHEL 
9) Ritwik Energy Limited Hyderabad 
10) Greenko Energy Limited Hyderabad 
11) AMR Mitra JV Ltd., Hyderabad 
 
More than 100 engineering software’s have been developed in house over a period 
of 20 years. In addition, more than a d
 engineering design softwares have been 
acquired and are in use for day to day work .State of Art facilities have been created 
to take up large Water Resources Projects. 
 
Presently the major Detailed Engineering works on hand are 
 
1.  Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in 
Saudi Arabia. 
2.  Balance Plant for Rafha  Gas based 2 x 55/70  MW + 2 x 35 MW Power Plant at 
Rafha Saudi  Arabia. 
3.  Two Irrigation Projects in Afghanistan namely  
a. M
achalgho Multipurpose Project, near Kabul 
b.  Pashdan Multipurpose Project in Herat region. 
4.  81 MW  Tinget HEP in Himachal Pradesh, India. 
5.  75 MW  Trishuli Galachhi HEP in Nepal, India. 
6.  25 MW  Mahan‐3 HEP in Chhattisgarh, India. 
7.  12 MW  Gatambe HEP in Kandy Sri Lanka. 
8.  Ba
 of Plant for 32 MW wind mill under phase II near Chikkodi near 
Belgaum, Karnataka, India.  
 
In addition 31 assignments are in different stages of  implementation  

 
A Profile 

 

 
A Profile 

 
 

 
A Profile 

 
 

 
A Profile 

 

 
A Profile 

 
 
 

 
A Profile 

 
 
 

 
A Profile 
10 
 
 

 
A Profile 
11 
8. EXPERIENCE  IN DESIGN ENGINEERING  OF A FEW IMPORTANT  
PROJECTS 
 
8.1   Balance of Plant of  Hail – 2 Power  Plant 
 
M/s. Alfanar one of the leading EPC contractors in Kingdom Saudi Arabia was 
awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi 
Electric  Company.  M/s IL
 Abu Dubai, UAE, were the principal consultants, M/s. 
DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and 
to issue all construction drawings and designs for complete plan except GTG. 
Siemens were the GTG equipment  suppliers.  
 
This was a fast track project, involving issue of mor
 than 600 drawings in a short 
span of 4 months. The project was successfully commissioned on schedule in the 
month of July 2011. The assignment included interaction with clients / SEC (Owners) 
during approval stage. 
 
The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/
  MW 
output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132 
kV GIS and 380 kV AIS. The extension project consisted of – 
 
1. 132 kV, 220MVA Generator Transformer, 13.8kV / 4.16kV 15MVA unit 
auxiliary transformers, 10 nos. service transformers, MV & LV Switchgears 
and ot
 BOP. 
2. Crude oil / Distillate oil fired Gas Turbine Generator units of 55/70MW 
output – 2nos. 
3. Crude oil treatment and forwarding and distillate oil forwarding system for 
new units. 
4. Associated piping, cabling & services 
 
 

 
A Profile 
12 
 
 
 
The Engineering services for  the project consisted of –  
 
• Civil Engineering involving structural designs, Architectural layouts, 
equipment foundations, for GTG  Building, FOTP Building & Switchgear 
Building, etc,. 
• Mechanical Engineering involving plant Layouts, piping, equipment sizing, 
fire fighting system, HVAC, etc,.  
• Process Engineering involving overall process flow discussions, P & ID
’s, etc,.  
• Electrical Engineering involving system studies, development of SLD’s, 
equipment sizing, for transformers, MV & LV, Switchgears, DC & UPS 
Systems, Cable & inter connection schedules. 
• IAC illumination Engineering involving interfacing new unit & BOP to 
existing CLR. 
 
GTG Building under Construction

 
A Profile 
13 
 
8. 2   Sea  Water Intake for PFBR Plant Systems:  
 
Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling 
Water System under ambitious plan of generating power through Plutonium Fast 
Breeder Reactor Project (PFBR) to M/s. Gammon India Limited.  The major 
components of the scheme were off‐shore intake shaft, on‐sh
 outlet shaft, and a 
submarine tunnel connecting the two structures  at about 45m below sea level.  M/s. 
Design Group Project Consultants Pvt Limited, were involved in detailed 
engineering services  for the sub marine tunnel and shafts.   The project is since been 
successfully completed. 
 
 
 
The total length of the sub marine tunnel is 565m,  Horse shoe shaped with 3600 mm 
dia finished diameter.  The outer diameter varied from 4300mm to 4600mm, 
thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate 
rock cover region, using M‐45 grade cement concrete.   Th
 tunnel passes  through 
Charnockyte type II rock medium having modulas of elasticity is 0.46 to 3.34 x 10
6
 
tons per square meter. The poisons’ ratio adopted ranged between 0.14 to 0.25 in 

 
A Profile 
14 
rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of 
insitu rock is 75.60 Mpa.  
 
 
 
 
 
  As per report investigation report the dry density of rock is 2.66 to 2.99 gms per 
cubic  centimeter. The tunnel was driven 45m below the sea level  without any 
geological surprises.   The tunnel carries 29 cumecs of seawater required for cooling 
Outlet Shaft as Viewed from Submarine Tunnel 
Submarine Tunne

 
A Profile 
15 
the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to 
be 1.024 ton  per cum. 
 
In addition,  inlet shaft (4250  / 5250 mm dia) and outlet shaft (6000  / 7000 mm dia) 
were sunk in both ends with 500mm,  thick cement concrete lining us
 M‐45 grade 
concrete.  
 
8.3   Varahi Tail Race Mini Hydel Scheme: 
 
 
River Varahi is an important West flowing river of Karnataka  State with large 
Hydel power potential. Power development in the Varahi Valley with an installed 
capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x 
115= 230 MW at Varahi Underground Po
 House was completed by Karnataka 
Power Corporation Ltd. in the year 1989.  The Varahi Tail Race Mini Hydel scheme 
has been planned and engineered by Design Group for M/s. Sandur Power  Co. Ltd. 
Varahi Tail Race Mini Hydel Scheme utilizes the tailrace discharges of Varahi 
Underground Power house and the av
 level difference between the point of 
confluence of tailrace of Under round Power House with Varahi River and the FRL 
of Varahi Irrigation Dam proposed downstream, for generation of power. The 
proposed scheme comprises of the construction of a diversion weir across Varahi 
river just downstream of the confluence of ta
 race of VUGPH with Varahi River, a 
gravity  type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m 
Dia simple type surge tank, 7m dia penstock tunnel, 3 Nos. steel penstocks and a 
power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW 
ca
pacity each under phase  I and a tail race joining the Varahi River on its right flank.  
Under Phase II, two more units of similar capacity have been added. 
 
 
 
 
 

 
A Profile 
16 
 
 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
View of Diversion Weir Structure with radial gates
Overview of Power House
Power  House  under Construction 

 
A Profile 
17 
 
 
The cost of the project inclusive of escalation in costs during construction and 
financial charges is placed at Rs. 13,439 lakhs. The project is under  advance stage of 
completion and is to be commissioned during the year 2005. 
 
 
                                                                      
 
 
Penstock Tunnel, Concrete Lining under Construction 
22m dia Shaft

 
A Profile 
18 
 
8.4   AMR/ SHAMBURI  Mini Hydel Scheme  
 
M/s. AMR Power Pvt. Ltd. Implemented the 24 MW (5 x4.8 MW) Mini Hydel 
Scheme across river Nethravathi, a major west flowing river  in Karnataka.  The 
design flood at the barrage is 11500  cumecs. The plant is situated 35 km from 
Mangalore, a major co
 city in west Karnataka.  The project has a low head 
fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a 
large flow. The design discharges utilized for power draft is 78.47  cumecs per unit. 
The units are capable of running at 15% continuous overload. ‘S’ ty
pe Kaplan 
turbine coupled to 4800  KW synchronous generator through the gear box are 
adopted. During the construction, another developer M/s. Rithwik Energy 
Generation proposed a 24 MW  capacity power plant on the other bank. After mutual 
discussion, it was agreed to utilize the existing facilities of M/s. AMR Po
  
 
 
  Thus, a power house accommodating 10 x 4.8 MW was planned and developed, 
with a combined annual generation of 115.14  GWHr. The scheme comprises of, a 
barrage across river Nethravathi  with 30 radial gates to safely pass the 11500 cumecs  
flood, non‐overflow  sections, a power block on the left ba
 a surface power house, 
and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river. 

 
A Profile 
19 
The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 
KV rating. The construction took 27 months and the plant was synchronized. DG 
provided the design engineering services. 
 
8.5   Modernisation of Shivanasamudram Power Channel. 
 
Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company,  owned by 
ea
rstwhile Karnataka Electricity  Board, as a part of the Modernisation programme of 
the existing Shivanasamudram Hydro Power  Project, had proposed to increase the 
water carrying capacity of the power channel upto the Shivanasamudram Balancing 
Reservoir and also increasing the live capacity of the Shivanasamudram Balancing 
Reservoir to cater to the increased n
 of the power channel and also the increased 
needs of the drinking water supply for Bangalore City.  VVNL entrusted the work of 
planning for the improvements and the detailed engineering for the same to 
Shivanasamudram Power Project is the earliest of the power projects constructed in 
India,  way back in th
 year 1902,  to supply electrical power to Kolar Gold Mines 
situated 85 kms away. 
 
 
 
 
 
 
 
 
 
 
 
Originally a 2000m long power channel connecting Shiva head works and the Shiva 
Balancing Reservoir had been constructed with a central earthen divider wall and 
side slopes lined with  stone pi
  
Divider wall under Construction 

 
A Profile 
20 
 
The central divider wall was an earthen bund with stone pitching on the side slopes 
the overall dimensions of the divider wall has been 3.7m at the top and 8.2m at the 
bottom. 
 
Over a period of the last 100 years, the water carrying capacity of the channel had 
been re
 to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting, 
vegetation growth, etc.  In order to increase the discharge carrying capacity of the 
channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of 
the side slopes  was reset and covered with RCC l
 The vegetation growth was 
completely removed.  After modernization, discharge carrying capacity of the power 
channel has increased to 59.5 cumecs.   The live capacity of Shiva Balancing Reservoir 
has been substantially increased by desilting the reservoir and removal of weed 
growth.  In addition,  DG was asked to suggest simple method of d
 of the 
Balancing Reservoir.  A simple technique of using a shovel mounted on a raft made 
out of a battery of empty steel drums was suggested and used along with ejection of 
the silt by a mud pump  and a pipe line supported on empty floating drums, and 
taken to th
 shores. 
 
8.6   Link Canal Mini Hydel Scheme: 
 
Karnataka  Irrigation Department, as a part of the modernization of K.R. Sagar 
project irrigation Canal System, took up the scheme to construct a link canal taking 
off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery 
Branch canal ne
 Peehalli at the 17th Mile (27.20  km) in Mandya District.  At the tail 
end of this link canal, there is a difference in level of about 8.3m between the bed of 
the link canal and the bed of the Cauvery branch canal and is negotiated by the 
construction of a dr
 structure.  Link Canal Mini Hydel Scheme was formulated to 
utilize the water flow of the link Canal and the head available at the drop at the end 
of Link Canal, for power generation.  
 

 
A Profile 
21 
 
 
 
  
Karnataka  Irrigation Department, as a part of the modernization of K.R. Sagar 
project irrigation Canal System, took up the scheme to construct a link canal taking 
off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery 
Branch canal near Peehalli at the 17th Mile (27.20  km) in Mandya District.  At th
e tail 
end of this link canal, there is a difference in level of about 8.3m between the bed of 
the link canal and he bed of the Cauvery branch canal and is negotiated by the 
construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to 
u
tilize the water flow of the link Canal and the head available at the drop at the end 
of Link Canal, for power generation.   
 
The scheme is simple with minimum civil engineering works. The civil engineering 
components comprise of a 70m long approach channel, intake structure, gated 
bypass weir with p
 of automatic falling shutters, surface power house, tail 
channel leading the water back to the branch canal. The installed capacity of the 
scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The 
View of Power House as seen from Downstrea
m

 
A Profile 
22 
average annual energy generation is 10.10 GWHr. The cost of the scheme is Rs. 80 
Million. The Project was completed in the year 2003 by the Developers M/s Graphite 
India Ltd., Bangalore, The civil engineering works were contracted to M/s Mysore 
Construction Co., Bangalore.  The Planning and Detailed Design Engineering was 
hand
led by Design Group.  
 
 
8.7   Captive Power Plant  of 5.8 MW capacity at John Welch Research Centre, 
Whitefield, Bangalore  for M/s General Electric: 
 
 
 
Design Group was associated as a major leader for the Planning, Detailed 
Engineering and construction co‐ordination of the 5.8 MW Diesel Engine based 
Overall view of DG Plant
Inside view of Generator Room

 
A Profile 
23 
Captive Thermal Station of the GE India Technology Centre at Bangalore, which has 
been completed on a time bound schedule of 6 months. 
 
8.8  Windmill Power 
 
M/s. Doddanavar Brothers, who have Plan to develop 100MW  Wind Farm in 
Chikkodi, Belgaum district of Karnataka,  India, availed our technical support for 
Engineering of ba
 of a plant. Critical  main equipment of capacity 10 x 1.5 MW 
was sourced from M/s. Sinovel, China, while the rest was sourced locally. 
 
     
 
DG assisted the developers by drafting technical specifications, preparing data 
sheets, floating tender for fabrication of towers, tower internals and electrical 
right from 690 volts to the grid connection. In addition,  assistance was extended 
for procurement activities.  The Civil Raft Foundation drawings were provided 
after detail designs, for local sub‐surface so
 conditions. The entire  assignment 
was completed in 9 months.  
 
 
 
 
 
Foundation of Wind Mill 

 
A Profile 
24 
 
 
1. DG designed  33 kV outdoor yard sub‐station at  Wind farm, 33 kV transmission 
line from Wind farm to  pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard 
pooling station and 110 kV transmission line from pooling station to KPTCL 
evacuating 110 kV sub‐station. 
2. DG p
 technical specification for 33 kV substation at Wind farm,  33 kV 
transmission line, 33 / 110 kV pooling station and floated enquiry for the 
procurement and scrutinized the Vendor offers and finalized the orders on 
suppliers. 
3. Vendor drawings and specification scrutinized. 
4. Assisted in commissioning the sub‐station an
 transmission line. 
 
The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x 
1.6 MW GE machines have been selected, the civil foundation is under 
construction.  
 
8.9  Design of Vacuum Chambers  
 
M/s. Hind High Vacuum Co. Pvt. Ltd., specializing in manufacture of Pressure 
Vessels  and Vacuum Chambers for defence, pharmaceuticals, and solar panels, 
entrusted to DG, design and preparation of fabrication drawings for a Robotic TIG 
Wind Turbine Generator Hub 

 
A Profile 
25 
Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed  for 
negative pressure of 1 kg per sq.cm, with a rider that the defection of internal 
structural members must be limited to 0.5 mm. 
 
 
 
The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit 
chambers, tool chambers, etc. The robotic arm moves on rails. The welding will be 
carried out under Argon gas atmosphere. The chamber were analysed using NISA 
Software package and the analysis has been validated by Indian Institute of Sci
 
Bangalore, the pioneer research institute, by using ETAB software. The analysis, 
design, and fabrication drawings have been forwarded to M/s. Hind High Vacuum 
Co. Pvt. Ltd. The fabrication of chamber is in advance state of complexion. The 
Robotic TIG Welding Chambers,  when commissioned, will be one‐of‐its‐kind in th
 
world.  
 
8.10  Design Group has been successfully providing pre‐tender and post‐tender 
services  for various public sector undertakings and several private sector 
undertakings, in as much as assessment of costs, detailed  specifications of various 
items of work, conditions of contracts, tender documents, tender analysis and 
reports leading to selection of construction and su
 agencies as per time bound 
schedules and needs of clients. 

 
Projects on Hand 
26 
Annexure – I 
9. LIST OF PROJECTS ON HAND  
 
A. POWER PROJECTS – DETAILED ENGINEERING  
 
Sl. 
No. 
Name of the Project  Installed 
Capacity 
in MW 
Project 
Cost in Rs. 
Lakhs 
Clients 
1. Lower UHL SHEP Project, 
Himachal Pradesh. 
13.00  9500  M/s. Trident Power Systems Ltd., 
Himachal Pradesh 
2. Singatalur‐Huligudda Mini Hydel 
Scheme, Karnataka‐ 
18.00  6000  M/s..Tungabhadra Power Projects 
Ltd., Bangalore. 
3. Lambadug Hydro Electric Project, 
Himachal Pradesh. 
25.00  12250  M/s. Himachal Sorang Power Pvt. 
Ltd, Shimla, Himachal Pradesh 
4. Cauvery Small Hydel Project, 
Karnataka. 
24.00  13000  M/s. XS Hydro Energy Private Ltd., 
Bangalore 
5. Huvinahedagi Mini Hydel 
Sc
heme, Karnataka. 
24.75  13500  M/s. XS Hydro Power Pvt. Ltd, 
Bangalore 
6. Agrahara MHSI & II, Karnataka.  1.475  700  Sarovara Energy Pvt Ltd., 
Bangalore. 
7. Water Supply System for Bharathi 
Cement Plant at Cuddapha, 
Andhra Pradesh  
Water 
Supply 
Scheme 
‐  M/s. Bharathi Cement Corporation 
Ltd Andhra Pradesh 
8. Paudital Lassa Hydro‐El
 
Project, Himachal Pradesh. 
24  19200  M/s. Greenko Hatkoti Energy Pvt 
Ltd., Hyderabad. 
9. Jeori Lower Mangalad SHPP, 
Himachal Pradesh. 
15  12000  M/s. Techology House (India)  Pvt 
Ltd., Hyderabad. 
10. Nimishamba Mini Hydel Scheme, 
Karnataka, 
3  1700  M/s. Nimishamba Energy India 
Private Ltd., Bangalore 
11. Kollya Mini Hydel Scheme, 
Karnataka. 
24  192
00  M/s. Kumaradhara Power Pvt Ltd 
Bangalore 
12. Chikkodi Windmill Project, 
Karnataka. 
100  6000  M/s.Doddanavar Brothers, Belgaum 
13. Mahan Hydro Electric Project, 
Chathisgard. 
24  2000  M/s.Venika Hydro projects Pvt Ltd, 
Bangalore 

 
Projects on Hand 
27 
Sl. 
No.  Name of the Project 
Installed 
Capacity 
in MW 
Project 
Cost in Rs. 
Lakhs 
Clients  
14. Trishuli  Galchhi Hydro Electric 
Project, Nepal. 
75  80000  M/s. Siddhakali Power Pvt. Ltd., 
Nepal 
15. Kukke 1 & 2 MHS, Karnataka.  24  14400  M/s. Kukke Hydro Projects Pvt Ltd, 
Bangalore. 
16. Anusha Mini Hydel Scheme, 
Andhra Pradesh. 
4  1600  M/s. Dhenu Hydro Pvt Ltd 
Hyderabad 
17. Navya Mini Hydel Scheme, 
Andhra Pradesh. 
2.60  1300  M/s. Mitra Energy Pvt Ltd 
Hyderabad 
18. Ramya MHS, Andhra Pradesh.  3.
80  1900  M/s. Kurnool Energies Pvt Ltd 
Hyderabad 
19. Koilakunte Mini Hydel Scheme, 
Andhra Pradesh. 
12   M/s. Dhenu Hydro Power Private 
Ltd., Hyderabad. 
20. Halsur Diversion weir under 
Shiggon lift Irrigation Scheme, 
Savanur, Karnataka 
  400  M/s. Karnataka  Neeravari Nigam 
Ltd., Karnataka 
21. River Water Intake Pump House 
and Approach Bridge, Pu
 
 
2 X 270  300  M/s. GVK Ltd through M/s. Fichtner 
Consulting Engineers (India)  Pvt 
Bangalore 
22. Machalgho Multipurpose Project, 
Machalgho, Afghanistan. 
  US $ 95 
Million 
M/s. Gulf Civil Engineering & 
construction Co. Kabul, Afghanistan 
23. Pashdan Irrigation Project, near 
Heart, Afghanistan. 
  US $ 180 M/s. Hewadwal Group Afghanistan 
24. Ti
nget‐2 Hydro Electric Project in 
Himachal Pradesh 
81  60000  M/s. AMR—Mitra JV, Hyderabad 
25. Balance of Plant for Rafha Gas 
based Power Plant, Saudi Arabia. 
2 x 75 + 2 x 
75 
  M/s. SSEM  Riyadh through M/s. ILF 
Abu Dhabi 
26. Study Report on Gandak Canal 
HEP in V
 West 
Champaran District, Bihar. 
3 X 5   M/s. WAPCOS New Delhi 
27. Detailed Design Engineering 
services for Kurtha SHP in 
Himachal Pradesh. 
2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd., 
Hyderabad 
28. Detailed Design Engineering 
services for Kuril SHP in Himachal 
Pradesh. 
 
2 X 2.5  4000  M/s. Sa
 Hydro Power Pvt Ltd., 
Hyderabad 

 
Projects on Hand 
28 
Sl. 
No. 
Name of the Project  Installed 
Capacity 
in MW 
Project 
Cost in Rs. 
Lakhs 
Clients 
29. Detailed Design Engineering 
services for Chhoned SHP. 
3 X 5  1200  M/s. Parvat Hydro Power Pvt Ltd., 
Hyderabad 
30. Detailed Design Engineering 
services for Sangam SHP Raichur, 
Karnataka. 
3 X 8  19200  M/s. Pavanganga Power Private 
Ltd., Hyderabad. 
31. Review Consultants for Umjaut 
(70MW) & Umduma HEP (90MW) 
in Meghalaya 
160  100000  M/s ETA Star Ltd,. Dubai 
 
B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT 
 
Sl. 
No.  Name of the Project 
Installed 
Capacity 
in MW 
Project 
Cost in Rs. 
Lakhs 
Clients 1  Bellary Solar Power Project, 
Karnataka. 
5  7500  M/s.Vishrutha Power Pvt. Ltd., 
Bellary 
2  Proposal to bring 10 TMC of Raw 
water from Sakleshpura to 
Chikkaballapur & Kolar District & 
T.G. Halli 
‐  ‐  M/s. Larsen & Toubro Limited, 
Bangalore 
 
C. PRE TENDER ENGINEERING SERVICES   
 
Sl. 
No.  Name of the Project 
Installed 
Capacity 
in MW 
Project 
Cost in Rs. 
Lakhs 
Clients 
1. 
Upper Narmada Irrigation Project 
Madhya Pradesh – EPC Bid 
Irrigation 
Project 
‐  M/s. Gammon India Ltd. Mumbai 
2. 
60MGD River water. Pipeline‐
73kms for VSNL Ltd, at Salboni in 
West Bengal – EPC Bid 
Water 
Supply 
‐  M/s. Gammon India Ltd. Mumbai 
3. 
Agra Water Supply Project in Agra 
– EPC Bid 
Water 
Supply 
‐  M/s. Gammon India Ltd. Mumbai 
4. 
Raw water supply system for 4 x 
300 MW Ra
igarh SKS  Power 
Generation (Chattisgarh) Ltd 
Water 
Supply 
‐  M/s. Gammon India Ltd. Mumbai 
 

 
Projects on Hand 
29 
 
D. PREPARATION  OF TENDER DOCUMENT  
 
Sl. 
No Name  of the Project 
Installed 
Capacity 
in MW 
Project 
Cost in 
Rs. Lakhs 
Clients 
1. Dagmara HEP – Preparation of bid 
document for Civil, E&M, H&M 
Transmission Line Component 
works 
25 x 5 ‐  M/s. Bihar Electricity Board, 
through M/s. WAPCOS  
New Delhi. 
 
E. OTHERS 
 
Sl. 
No Name  of the Project 
Installed 
Capacity in 
MW 
Project 
Cost in 
Rs. Lakhs 
Clients 
1. Design and drawings of Electrical 
System for Beneficiation Plant, 
Bagalkot, Karnataka 
Electrical 
Distribution 
‐  M/s. Doddanavar Nanjinzhao 
Mining and Metallurgy (P) Ltd., 
Belgaum Karnataka. 
2. Detailed Civil Engineering for Two 
Transfer points. Tunnel in cut & 
cover, Box Pulsing for coal 
conveyor system for addition of 2 x 
250 MW to Sikka Thermal Power 
Plant in Jamnagar District Gujarat  
Coal 
Handling 
System 
‐  M/s. Multi Design Infra Works Pvt. 
Ltd. Bangalore 
3. Design of 35.58  MLD capac
ity 
Sewage Treatment Plant under 
UGD Scheme to Shimoga City  
‐  ‐  M/s. GVPR 
 

  
Panel of Consultants / Advisors 
30 
Annexure – II (A) 
10. ORGANISATION STRUCTURE  
A. PANEL OF CONSULTANTS/ADVISORS  
 
Sl. No.  Name & Qualification  Designation 
1. 
 
Sri C.S. Hebli 
Director Technical (Retd), 
Karnataka Power Corporation Ltd. 
Bangalore. 
Chairman & 
Chief Consultant. 
2.  Sri H.V. Eswaraiah 
Director Technical (Retd), 
Karnataka Power Corporation Ltd., 
Bangalore. 
Consultant –Hydro Civil 
Designs. 
3.  Sri G.N. Yoganarasimhan, 
Director (Retd), 
WRTD, Rourke, 
Bangalore. 
Advisor‐Hydrology. 
4.  Sri. P.R. Balasubramanian,  
CMD (Retd), FACT,  
Triavaneore, Kerala. 
Bangalore. 
Advisor‐ Gas Based Power 
Plant. 
5.  Dr.  D.N. Seshagiri, PhD Harvard, USA.  
Director (Retd), 
En
gineering Geology, 
Geological Survey of India. 
Advisor – Engineering Geology. 
6. 
Sri.Vishwanath Balachandran, 
Director General, GIS (Retd). 
Chennai.   
Advisor‐ Engineering 
Geology. 
7. 
Sri. Shankar Nesargi 
Managing Director (Retd.) 
VVNL, Bangalore. 
Advisor ‐Wind Energy 
8.  Sri. C. R. Venkatesh 
Executive Director (Retd.) 
NHPC Ltd., New Delhi, 
Bangalore. 
Advisor ‐Hydro Power 
Projects. 
9.  Sr
 H. Rangarajan, B.Sc, B.E. 
Executive Director(Retd),  
KP CL, Bangalore. 
Executive Director (Elec.) 

  
Panel of Consultants / Advisors 
31 
 
Sl. No. Name & Qualification  Designation 
10. Sri B.V. Ramakrishnaiah, 
Bangalore. 
Advisor – Gates. 
11. Sri Srinath Anekal, ME (Civil), MS(Environment) 
USA. 
Bangalore. 
Advisor‐Environment. 
12. Sri. M. M. Kamath,  
Chief Engineer (Retd), 
NMPT, Mangalore. 
Advisor – Marine Engineering. 
13. Sanker Pradesh, M.Tech  (Roorkee),   
New Delhi. 
Consultant‐ Geology. 
14. Sri. Thippeswamy 
Chief Engineer (Retd.) 
BWSSB, Bangalore. 
Advisor –Water and Waste 
Water System. 
15. Sri. V. Su
 Kumar, M.Tech (Khargpur), 
Bangalore. 
Advisor – GIS 
 
16. Sri V. Narayanan, 
General Manager, SAE (I) Ltd (Retd), 
Bangalore. 
Advisor – Transmission 
Lines. 
17. Sri. Ramanan 
Chief Engineer (Retd.) 
NHPC Ltd., New Delhi, 
Bangalore. 
Consultant‐Hydro 
18. Dr. Y. Lingaraju.  Advisor ‐  Ground Water 
19. Sri. Umashankara , B.E. (Civil) 
Ex‐Me
 
 
Advisor ‐Steel Structure. 
20. Sri. G. Rajagopalan, 
Director (Retd), 
Engineering Geology, 
Geological Survey of India, Chenn ai. 
Consultant – Engineering 
Geology 
21. Sri. Krishnappa, 
Financial Controller(Retd), 
KP CL, Bangalore. 
Advisor – Finance. 
 
22. 
Sri. Sridhar Prabhu – Legal Adviser   Advisor –PPA 
23. Sri. Venkateshwar Rao 
New Delhi. 
Consultant (Liaison) 
24. Sri T.
 Somanathan, B.E. (Mech). 
Foremerly NLPC Ltd., 
Advisor –Welding. 

  
Technical Personnel 
32 
Annexure – II (B) 
 
B. TECHNICAL PERSONNEL 
 
Sl. No.  Name & Qualification  Designation 
1  Sri C.S. Hebli, B.E(Hons)  Chairman. 
2  Sri B.L. Lakshminarasimha,  Chief Executive Officer 
            B.Sc., B.E., M.E., MIE, AI V, MASCE.    
3  Sri. P.R.Mallikarjuna    Executive Director (Design Head) 
  M.E.(I.I.Sc.), MIE, MIWRS, MISEO.   

Sri. Chikkaguddappa  B.E. (Civil)  Director (Project Development) 
5  Sri. H.Raghavendra Rao B.E. (Elec)  Director (Electrical Generation.) 

Sri M.M. Reddy, B.E.(Elecl)  Director (Electrical Power Evacuation) 
7  Sri.P.K.Rupangudi, M.E. (Civil)  Director (Gates, Dams design) 

Sri.U.R.Raghotham, M.Tech. (Civil)   Director (Tunnel and Dam design) 
9  Sri.R.Vasudevan B.E. (Elec)  Deputy Director (Water & Wa
 Water) 
10  Sri.K.T.Sreedhara, B.Tech (Civil)  Deputy Director (Irrigation) 
11  Sri. Narayana  Achutha  Deputy Director (Hydro civil design) 
  M.Tech, IIT Ka npur, (Hydraulics)  
12  Sri.T.S.Srinivasa, B.E (Civil), M.E  Deputy Director ‐‐Civil (Gas)      
13  Sri.Sudarshan Rao B.E. (Elec)  Manager (Electrical Generation) 
14 
Mr.Gangadar Pattanashetti  Senior Design Engineer (Irrigation) 
  M.Tech, IIT Guwahati, (Water Resources)  
15  Sri. Anantha Murthy,  
B.Sc AMIE (Civil) 
General Manager (Civil  Designs) 
16  Ms.Kavitha.M,  B.E, MB A  Administrative Officer  
17  Sri. R. Suryanarayana, M.Sc (Geology)  Consultants (Engineering Geology) 
18  Ms. Sneha Dandavathe., B.E.(Civil)  Design Engineer (Hydrology) 
19  Mr. K.V. Chandrakanth B.E. (Elec)  Design Engineer (Elec.) 
20  Mr. Vasanth Kumar B.E (Civil)  Design Engineer (Project Planning) 
21  Mr. Shivanand, B.E (Civil)  De
sign Engineer (Water conductor system) 
22  Mr. Pramod Kumar, B.E.(Civil)  Design Engineer (Power House & Tail Race) 
23  Mr. Lokesh  B.E (Civil)  Design Engineer (Dam Design) 
24  Mr. Sudeendra, M.Tech (Structures)  Design Engineer (Gas Power Plant) 

  
Technical Personnel 
33 
Sl. No.  Name & Qualification  Designation 
25  Mr. Mohan Kumar, M.Tech (Structures)  Design Engineer (Gas Power Plant) 
26  Mr. Puneeth. S, B.E(Elec)  Design Engineer (Elec.) 
27  Mr. Naveen V. B.E.(Mech)  Piping Engineer (Mechanical) 
28  Mr. Yoghesh K ,B.E.(Civil)  Design Engineer (Planning) 
29  Ms. Anusha Hegde K. B.E.(Elec)  Design Engineer (Electrical) 
30  Ms. Smitha Nagaraj B.E.(Elec)  Design Engineer (Electrical) 
31  Ms. Kumari Diptimayee, B.E.(Civil)  Design Engineer (Irrigation) 
32  Ms. P
 U Jadhav, B.E (Civil)  Design Engineer  
33  Mr. Pradyumna K, B.E.(Civil)  Design Engineer (Trainee) 
34   Mr. Vinay M V  B.E .(Civil)   Design Engineer (Trainee) 
35  Mr. Saravanan S   Design Engineer (Hydro Civil)  
36  Ms.Sunita G Galgali, B.E (Civil)  Assistant Design Engineer  
37  Sri Mahesh Desai  Manager (Drawings‐ Section) 
38  Mr
.Prasanna.T  CAD Engineer (Electrical) 
39  Mr.M.Shashi Kumar  Junior Design Engineer (Drawings) 
40  Mr.Manthesh.M  CAD Engineer (Mechanical Piping)  
41  Mr.Praveen.S.Ladva  CAD Operator (Civil) 
42  Mr.Nagashetty S   CAD Engineer (Hydro) 
43  Mr.Sangashetty V Biradar  CAD Operator (Gas Power Plant) 
44  Mrs. Sharadhamma  H   CAD Engineer (Civil) 
  Office Support Staff:  
45  Sri. Nagesh, S  Of
ficer / Manager / Accountant 
46  Sri Suresh   Accountant 
47  Ms. Thara. R  Receptionist 
48  Mrs. Geetha N  Personal  Secretary 
49  Sri. Ravi Kumar K   Stenographer Cum Secretary 
50  Ms. Sowmya A  Personal  Secretary 
  

  
Desk Study Report 
34 
Annexure – III (A) 
 
11. LIST OF PROJECT ASSIGNMENTS  SUCCESSFULLY COMPLETED 
 
 
A. Preparation of Desk Study Report on Hydro Power Projects self identified by DG to 
various IPP’s in Nepal  and India. 
 
 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. 
Lakhs 
Year  Clients 
1. Jaleswar HEP, Nepal.  200.00  US $400 
Million 
2008  M/s. Maytas Infra Ltd., 
Hyderabad. 
2. Taksindu HEP, Nepal.  270.00  US $540 
Million 
2008  M/s. Nandadevi Agro‐
Farms Pvt Ltd., Hyderabad. 
3. Syar Khola ‘A’ HEP, Nepal  140.00  US $280 
Million 
2008  M/s. Dunagiri Pvt Ltd., 
Hyderabad. 
4. Syar Khola ‘B’ HEP, Nepal.  360.00  US $720 
Million 
2008 M/s. Harmosha Pvt Ltd., 
Hyderabad. 
5. Prok HEP, Ne
  480.00  US $960 
Million 
2008 M/s. Nandadevi Pvt Ltd., 
Hyderabad. 
6. Jogimara Trisuli HEP, 
Nepal. 
240.00  US $480 
Million 
2008 M/s. Haramosh Agro‐Farms 
Pvt Ltd., Hyderabad. 
7. Bihi HEP, Nepal.  270.00  US $540 
Million 
2008 M/s. Dunagiri Agro‐Farms 
Pvt Ltd., Hyderabad. 
8. Kappe HEP, Arunachal 
Pradesh. 
98.00  73900  200
8 M/s. Hemavathy power & 
light Pvt Ltd 
9. Champung Pobe HEP, 
Arunachal Pradesh. 
140.00  105500  2008 M/s. Hemavathy power & 
light Pvt Ltd, Bangalore. 
10. Changlai HEP, Arunachal 
Pradesh. 
48.00  36200  2008 M/s. Hemavathy power & 
light Pvt Ltd, Bangalore. 
11. Braing pube HEP, 
Arunachal Pradesh. 
48.00  36200  2008 M/
 Hemavathy power & 
light Pvt Ltd, Bangalore. 
12. Pakke HEP, Arunachal 
Pradesh. 
70.00  52800  2008 M/s. Hemavathy power & 
light Pvt Ltd, Bangalore. 
13. Nargum HEP, Arunachal 
Pradesh. 
84.00  63300  2008 M/s. Hemavathy power & 
light Pvt Ltd, Bangalore. 
 
14. Chann Siang HEP 
Arunachal Pradesh. 
66.00  50557  2008 M/s. He
 power & 
light Pvt Ltd, Bangalore. 

  
Desk Study Report 
35 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. 
Lakhs 
Year  Clients 
15. Papu HEP Arunachal 
Pradesh. 
110.00  88000  2008 M/s. Hemavathy power & 
light Pvt Ltd, Bangalore. 
16. Arket Bazar HEP, Nepal.  110.00  US $220 
Million 
2007 M/s. Parasnath Greenlands 
Pvt Ltd., Hyderabad. 
17. Uiya HEP, Nepal.  105.00  US $210 
Million 
2007  M/s. Maytas Infra Ltd., 
Hyderabad. 
18. Phillim HEP, Nepal.  150.00  US $300 
Million 
2007 M/s. MMS Steel & Power 
Ltd.,Hyderabad. 
19. Amras HEP, Nepal.  150.00  US $3
 
Million 
2007 M/s. Maytas Properties Pvt 
Ltd., Hyderabad. 
20. Budhi Gandaki HEP, 
Nepal. 
600.00  US $1200 
Million 
2007 M/s. RVK Energy Pvt Ltd., 
Andhra Pradesh 
 

  
Detailed Engineering – Completed 
36 
 
B. DETAILED ENGINEERING  OF PROJECTS ‐ COMPLETED  
 
 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
1. Balance of Plant for Hail‐2 
Gas based Power Plant, Saudi 
Arabia. 
2 x55/75   2011 M/s. Alfanar Riyadh through 
M/s. ILF Abu Dhabi 
2. Computation of HFL, 
elevation capacity of barrage, 
design of barrage for Halasur 
Barrage across Varada River 
‐ Shiggaon Lift Irrigation 
Scheme Dharwar District, 
Karnataka 
Irrigation  4000  2011 M/s. Karnataka  Neeravari 
Nigama Limited, Karnataka. 
 
3. Detailed Analysis,Design 
and  Preparation  of 
Fabrication of TIG Welding 
Chamber. 
Mechanical  5200  2010 M/s. Hind High Va
 Co. 
Pvt. Ltd. Bangalore 
 
4. Balance of civil works for 
Horizonal Belt Filter Station 
Building  including 
Equipment and Accessories 
Foundation Can go. 
—  —  2010 M/s. Delkor Technik India 
Pvt Ltd., Bangalore. 
5. Al‐Gubrah Mobile SWRO 
Plant Civil Design, Muscat. 
—  —  2010  M/s. ILF Abu Dhabi. 
6. Dandavathi  Re
 
Irrigation Project Karnataka 
Irrigation  10200  2009 M/s. Karnataka  Neeravari 
Nigam Ltd., Bangalore 
7. Varahi Underground Power 
House Stage‐II Karnataka. 
2 x 215  2500  2009  M/s. Karnataka  Power 
Corporation Ltd., Bangalore 
8. Energy Audit of Fiber Glass 
Product  Manufacturing 
Units, Bangalore 
 
Energy 
Audit 
60  2009 M/s. ICP(India) Private Ltd., 
Ba
ngalore. 
9. 35 MLD/STP for Shimoga 
Town, Shimoga District, 
Karnataka. 
 
—  —  2009 M/s. GVPRS Hyderabad. 

  
Detailed Engineering – Completed 
37 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
10. Balance of civil works for 18 
mtr dia x 3.0 SWD RCC tank 
for thickener application. 
—  —  2009 M/s. Delkor Technik India 
Pvt Ltd., Bangalore. 
11. Detailed Engineering for 
Transmission line including 
Foundation Designs for the 
20km, double circuit 
transmission line connecting 
Vajamangala 220kV station 
to Kachakola 220kV station. 
   2009 Sharavathy Con ductors Pvt 
Ltd, Bangalore 
12. 25 mtr dia x 3.0 SWD 
130TPH capacity RCC tank 
with tunnel and overflow 
launder for thickener 
application 
—  —  200
9 M/s. Delkor Technik India 
Pvt Ltd., Bangalore. 
13. 100MW Wind Farm 
development‐1phase 
16.5MW Chikkodi Belgaum 
District, Karnataka 
10 x 1.65  10000  2009 M/s.Doddanavar Brothers, 
Belgaum Karnataka 
 
14. Energy Audit of steel 
Fabrication Manufacturing 
Unit, Bangalore. 
Energy 
Audit 
50  2008  M/s. Goel Engineering 
Private Ltd., Bangalore. 
15. Design and Dr
 for DM 
Vessel. 
—  —  2008 M/s. Velath Engineering 
Works, Sharjah UAE 
16. Construction Water supply 
for Kamalanga Thermal 
Power Plant, Orissa. 
3 x 350  450000  2008 M/s. GMR Energy Limited, 
Bangalore 
17. Somanamaradi Small Hydel 
Project‐ Stage‐II, in Raichur 
District, Karnataka. 
1 x 6  1500  2007 M/s. Na
 Power 
Co. Pvt. Ltd, Bangalore 
18. Balance of civil works for 
Design and Drawing for 
Sulphur Storage Tank. 
—  —  2007 M/s. Velath Engineering 
Works, Sharjah UAE 
19. Design and Drawing of Flue 
Gas Scrubber (V‐1507) 
Vessel. 
   2007 M/s. Velath Engineering 
Works, Sharjah UAE 

  
Detailed Engineering – Completed 
38 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
20. Detailed Engineering for 
Transmission line towers 
including  Foundation 
Designs for 50kms of Hiriyur 
–  Kudithini  440kV 
Transmission line. 
—  —  2007 Sharavathy Con ductors Pvt 
Ltd, Bangalore 
21. Balance of E&M works for 
Bhavani Barrage Hydro 
Electric Project I. 
2 x 5  3000  2007  M/s. Meclin Fabricators 
Private Limited Chennai. 
22. Balance of E&M works for 
Bhavani Barrage Hydro 
Electric Project II. 
2 x 5  3000  2007  M/s. Sri Saravana 
Engineering Works 
company Pvt Ltd. Bhavani 
Tamil Nadu 
23. Co
nstruction of earthen 
bund for Sarvaraja Sarovara 
Reservoir near Cuddaph, 
Chittur  District, Andhra 
Pradesh. 
—  —  2007 M/s. ECC‐‐CPPL Pvt Ltd., 
Hyderabad. through M/s. 
SM Constructions Bangalore. 
24. Shamburi MHS, Dakshina 
Kannada District, Karnataka. 
5 x 4.80  9726  2006  M/s.Rithwik Energy 
Generation Pvt. Ltd. 
Hyderabad. 
25. Design and Drawing fo

Natural Gas Storage (Buffer) 
Pressure vessel. 
—  —  2006 M/s. Velath Engineering 
Works, Sharjah UAE 
26. Balance of Civil Works for 13 
mtr dia x 3.0 SWD RCC tank 
for thickener application. 
—  —  2006 M/s. Delkor Technik India 
Pvt Ltd., Bangalore. 
27. Balance of Civil Works for 4 
x B3
5: 40V‐12G Genset Gas 
Power Plant at Sudan. 
—  —  2006  M/s.Rolls‐Royce Energy 
Systems India Pvt.Ltd., 
New Delhi 
28. Detailed Engineering for 
Transmission line Towers 
including Foundation Design 
for 132/66/11 kV Kolar Sub‐
Station works. 
 
—  —  2006 Sharavathy Con ductors Pvt 
Ltd, Bangalore 

  
Detailed Engineering – Completed 
39 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
29. Perla Mini Hydel Scheme, 
Dakshina Kannada District, 
Karnataka. 
5 x 4.80  9726  2005 M/s.AMR Power Pvt. Ltd. 
Hyderabad. 
30. Nagarjuna Sagar Tail Pond 
Dam and Hydro Power 
Station, Nalgonda, Andhra 
Pradesh 
2 x 25  42500  2005  M/s. ST UP Consultants 
Private Ltd., Bangalore 
31. Construction of Gandikota 
Dam across Pennar River, 
Kadapa, Andhra Pradesh. 
Irrigation  5500  2005  M/s. ST UP Consultants 
Private Ltd., Bangalore 
32. Yakla Micro Hydel Scheme 
in Dargeling We
 Bengal. 
2 x 250  100  2005  M/s. Raj Kumar and 
Company, Bangalore 
33. Somanamaradi Small Hydel 
Scheme, Raichur District, 
Karnataka. 
2 x 6  4800  2004 M/s. Narayanapur Power 
Co. Pvt. Ltd., Bangalore 
34. Hullahalla Mini Hydel 
Scheme, Mandya District, 
Karnataka. 
3 x 4  4740  2004 M/s.Limbavali Power Pvt. 
Ltd., Bangalore 
35. So
mavathi Mini Hydel 
Scheme,  Chickmagalur 
District, Karnataka. 
2 x 3  2746  2004 M/s.SRM Power Pvt. Ltd. 
Bangalore 
36. Gugal Small Hydel Scheme, 
Gulbarga District, Karnataka. 
4 x 2.5  4000  2004 M/s.SRS Energy Pvt. Ltd. 
Bangalore 
37. Design of Anchor Blocks for 
Birkapilli HEP Turkey ( XLS 
generation) 
—  —  200
4  M/s. Quest‐GE‐Global 
Engineering Development 
Centre,Bangalore. 
38. Koynad MHS, Kodagu 
District, Karnataka. 
2 x 2  1800  2004 M/s. Sadguru Saai Energies 
Pvt. Ltd., Bangalore. 
39. Design and Preparation of 
GA drawings for following 
tanks. Crude Oil Tank Slop 
Crude Oil Tank Crude Oil / 
Water Tank Product Water 
Tank Fi
 Water Tank 
Diesel Oil Tank. 
Tank Farm   2004 M/s. Velath Engineering 
Works Sharju, UAE. 

  
Detailed Engineering – Completed 
40 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
40. 110 kV Switchyard extension 
at Bellary Steels, Bellary 
District, Karnataka. 
 
Switchyard  100  2003  M/s. Bhowalaka Steels, 
Bangalore, through LEG. 
41. Pre‐Cas t RCC Bridge over 
Upper Tunga barrage across 
River Tunga, Shimoga 
District, Karnataka. 
   2003 M/s. Mysore construction Co 
Ltd., Bangalore. 
42. Architural and Structural 
services for Construction of 
Pediatric Ward at Kidwai 
Memorial Institute of 
Oncology – Honorary 
Assignment 
  300  2003 M/s. Nandalal Mohan Lal 
Jairani Kapur Charitable 
Tr
ust Bangalore. 
43. Link Canal MHS 2001, 
Mandya District, Karnataka. 
1 x 1.5  700  2002 M/s.Graphite India Ltd., 
Bangalore. 
44. Varahi Tail Race MHS, 
Udupi District, Karnataka. 
5 x 7.5  13439  2002 M/s. Sandur Power Co. Pvt. 
Ltd., Bangalore. 
45. Civil works for the proposed 
132/33kV ODY at INDALCO. 
—  —  200
2 M/s. ASEA Brown Boveri 
Ltd., Bangalore. 
46. 132  KV  Switchyard 
Capacitor Bank for HINLCO 
Renukot. 
Switchyard   2002  M/s. BHEL Bangalore. 
47. 132 kV Switchyard near 
Samayanallur,  Madurai, 
Tamil Nadu. 
Switchyard  300  2001 M/s.Bharat Heavy Electricals 
Ltd. 
48. 110 kV Switchyard extension 
connected with 128 MW DG 
set installation for KS
 
Kozikhode. 
Switchyard  300  2001  M/s. BHEL, Bangalore, 
through M/s.. MECON, 
Bangalore 
49. 110  KV Substation at 
Navakarnataka  Steels, 
Bellary District, Karnataka. 
Substation   2001  M/s. LEG Bangalore 
50. 66 KV outdoor Switchyard 
and Substation at NAL 
Bangalore. 
Switchyard   2001 M/s. GEPC Ltd., Bangalore 

  
Detailed Engineering – Completed 
41 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
51. DG Plant at GE ITC Ltd., 
Whitefield, Bangalore 
7.4  4000  2000 M/s. GEITC Ltd., Bangalore 
52. Design of Supplying 
Structures of 220kV Switch 
yard for M/s. Nippon Denro 
Ispat Ltd., Dolvi, Maharastra. 
Switchyard  800  2000 M/s.. AEG‐NGEF Limited 
Bangalore. 
53. 110 kV Switchyard at 
HINDALCO,  Renukoot, 
Uttar Pradesh. 
Switchyard  250  2000  M/s. Bharat Heavy 
Electricals Ltd. Bangalore. 
54. Design of Supplying 
Structures for the proposed 
66 KV Ou
tdoor Switchyard 
at a very Cycle s Ludhiana. 
Switchyard  200  1999  M/s. Kirloskar Electric 
Company Ltd., Bangalore. 
55. Harangi HEP at Harangi 
Dam, Kushalnagar District, 
Karnataka 
2 x 4.5  3200 
 
1999 M/s. Sulzer Flovel Hydro 
Ltd., Faridabad, Haryana. 
56. Sheshadri Iyer MHS Mandya 
District, Karnataka. 
3 x 2  1200 
 
199
  M/s. Atria Power 
Corporation Limited, 
Bangalore. 
57. Remodeling of Shiva Power 
Channel  at 
Shivanasamudram, Mandya 
District, Karnataka. 
—  1000 
 
1998  M/s. Karnataka  Power 
Transmission Corporation 
Ltd., Bangalore. 
58. Dumkar  Hydro‐Electric 
Project at Leh, Ladakh, J&K 
State. 
3 x 1.5  300  1998  Chief Project Engineer, 
Power Development 
Corporation Ltd., K
 
J&K State. 
60. Civil works for De‐Bottle 
Neck Project MSDS‐4, 
Electrical works of Bokaro 
Steel Plant, Bihar. 
—  —  1995 M/s. NGEF Ltd., Bangalore 
61. 110/33KV Switchyard and 
Substation at Xeldem 
Madgon Goa for Goa 
Electricity Board. 
Switchyard  300  1989 M/s. NGEF Ltd., Bangalore 

  
Detailed Engineering – Completed 
42 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
62. 110 KV Outdoor Yard 
Substation for M/s. Madras 
Refineries Ltd., Manali 
Chennai. 
Switchyard  150  1988 M/s. NGEF Ltd., Bangalore 
63. 132 KV Outdoor Yard and 
Substation for M/s. Petrofills 
Co‐operatives Ltd., Kalewar, 
Gujrat. 
Switchyard  200  1987 M/s. NGEF Ltd., Bangalore 
 

  
Preparation of DPR 
43 
 
C. PREPARATION  OF DETAILED PROJECT REPORTS  
 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
 
1. 
Kukke Hydro Projects Stage 
1 Dakshina Kannada 
District, Karnataka 
8 x 3  
12714 
 
 
2011 
M/s. Kukke Hydro Projects 
Pvt Ltd., Bangalore 
 
2. 
Kukke Hydro Projects Stage 
2 Dakshina Kannada 
District, Karnataka 
4 x 3  
7113 
   
2011 
M/s. Kukke Hydro Projects 
Pvt Ltd., Bangalore 
 
3. 
Lower UHL, Mandi District, 
Himachal Pradesh 
2 x 7.5  
9435 
 
2011 
M/s. Trident Power Systems 
Pvt Ltd., Hyderabad 
 
4. 
Dananahalli MHS, Mandya 
District, Karnataka 
 
2 x 3 
475
0  2011 M/s. Punam power Pvt Ltd, 
Bangalore. 
 
5. 
Feasibility Study on water 
Supply lines for Bharathi 
Cement Factory  from 
Saravaraju Sarovar De 
Reservoir near Cuddaph 
Andhra Pradesh. 
   2010  M/s.Bharathi Cement 
Corporation Limited 
Hyderabad 
 
6. 
Navya Mini Hydel Scheme 
near Kurnool, Andhra 
Pradesh 
2 x 1.3  2281  
201

M/s. Mitra Energy Pvt Ltd 
Hyderabad 
 
7. 
Augmentation of Water 
Supply Scheme at Hutti 
Gold Mines Raichur District, 
Karnataka 
—  —  
2010 
M/s. Hutti Gold Mines Co 
Ltd. Bangalore 
 
8. 
Kollaya  MHS  near 
Kumaradhara  Dakshina 
Kannada District, Karnataka 
 
6 x 4 
 
12000 
 
2010 
M/s. Kumaradhara Power 
Co.Pvt Lt
 Bangalore. 
 
9. 
Solar Power Plant at Bellary 
District, Karnataka 
5 x 1  
600 
 
2009 
M/s. Vishrutha Power Pvt 
Ltd., Bangalore 
 
10. 
Anusha Mini Hydel Scheme 
near Kurnool, Andhra 
Pradesh 
2 x 1.9  
2778 
 
2009 
M/s. Dhenu Hydro Pvt Ltd 
Hyderabad 
11. Ramya  MHS  near 
Kurnool,Andhra  Pradesh 
2 x 2  290
0  
2009 
M/s. Kurnool Energies Pvt 
Ltd Hyderabad 

  
Preparation of DPR 
44 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
12. Kodekal Basaveshwara MHS 
Near Narayanapur Dam, 
Gulbarga  District, 
Karnataka. 
2 x 5  
4500 
 
 
2009 
M/s. Kodekal Basaveshwara 
Power Generation Pvt 
Ltd.,Bangalore 
 
13. 
Magundi MHS near 
Magundi Village, Mudigere 
Taluk,  Chikkamangalur 
District, Karnataka. 
 
3 x 3 
 
5200 
 
2009 
M/s. Shakuntalam Power 
Pvt Ltd., Bangalore. 
 
14. 
Dabevadi MHS Uttara 
Kannada District, Karnataka. 
 
3 x 4 
 
6271 
 
2008 
M/s.Dabevadi Hydel Power 
Pvt. Ltd., Uttara Kannada 
Karnataka. 
 
15. 
Yadekumari MHS Hassan 
District, K
 
2 x 10.5  8200  
2008 
M/s. Sri Maruthi Power Gen 
India Pvt Ltd., Bangalore 
 
16. 
Devargaddi MHS, Uttara 
Kannada District, Karnataka. 
 
2 x 3 
 
3000 
 
2008 
M/s.Baliyan Power Private 
Limited 
Bangalore. 
 
17. 
Perdur MHS, Dakshina 
Kannada District, Karnataka. 
2 x 3  3000  2008  M/s. Dishaa Power 
Corporation Pri
vate Ltd., 
Bangalore. 
 
18. 
H. Malligeri MHS, near 
Maddur branch canal, 
Mandya District, Karnataka. 
1 x 1  461  2007 M/s. Venika Green Power 
Pvt Ltd., Bangalore. 
 
19. 
Hosamatha MHS, near 
Hosamatha village Dakshina 
Kannada District, Karnataka. 
3 x 1.2  1807  2007  M/s.Vakkal Power 
Corporation Ltd., 
Bangalore. 
 
20. 
Devarabetta MHS, H
 
District, Karnataka. 
2 x 6.5  3910  2007 M/s. Pinnacle Green Power 
Pvt. Ltd., Bangalore. 
 
21. 
Addhole MHS, near Bisale 
village, Hassan District, 
Karnataka. 
3 x 8  8676  2007 M/s. Trimurthy Power Pvt. 
Ltd., Bangalore. 
22. Hongadahalli Mini Hydel 
Scheme, Hassan District, 
Karnataka. 
 
18.9 
 
7200 
 
2007 
M/s. Sri. Ma
 Power 
Gen India Pvt Ltd., 
Bangalore 
23. Mallahalli MHS, near 
Patla,Kodagu  District, 
Karnataka. 
 
3 x 8.39 
 
9778 
 
2007 
M/s. Nandini Power Co. 
Bangalore Pvt. Ltd., 
Bangalore. 

  
Preparation of DPR 
45 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
24. Hathipathar MHS 
Chathisgarh State. 
 
2 x 6 
 
7000 
 
2007 
M/s. Shasta Investment and 
Initiation Company Pvt Ltd 
Hyderabad. 
25. Benchagaddi  MHS, 
Dakshina Kannada District, 
Karnataka 
 
12 
 
6000 
 
2007 
M/s. Pusala Power 
Company Pvt Ltd., 
Hyderabad. 
26. Talthare MHS in Kodagu 
District, Karnataka. 
 
2 x 3.7 
 
3000 
 
2007 
M/s. GM Property 
Developers Pvt. Ltd, 
Bangalore. 
27. Kanchimane MHS, Shimoga 
District, Karnataka 
 
2 x 2 
 
2000 
 
2007 
M/
s. Sagar Power (Dandela) 
Pvt. Ltd Hyderabad 
 
28. 
Tomabattu MHS, Shimoga 
District, Karnataka. 
 
2 x 2.5 
 
2500 
 
2007 
M/s. Siddhi Vinayaka 
Spechem (P) Ltd., 
Bangalore 
29. Havinahedgi  MHS, 
Hospet,Bellary  District, 
Karnataka. 
 
4 x 6 
 
12000 
 
2007 
M/s. XS Power company 
Pvt Ltd Hyderabad. 
30. Construction of weir ac
 
across River Nethravathi at 
Thumbe for providing Water 
Supply to Mangalore City 
Mangalore  District, 
Karnataka. 
   
 
2007 
M/s. Mangalore City 
Corporation, Mangalore. 
 
31. Shamburi MHS, near 
Shamburi / Kamthi Bazar 
village Dakshina Kannada 
District, Karnataka, 
5 x 4.80  9733  2006  M/s. Rithwik Energy 
Generation Pvt. Ltd., 
Hyderabad 
32. Varahi  MH
S,  near 
Hosangadi village Udupi 
District, Karnataka, 
2 x 4.50  4926  2006 M/s. South Can ara Electric 
Power Ltd., Bangalore. 
33. Handihalla MHS, Mandya 
District, Karnataka. 
 
3 x 8.25 
12000  2006  M/s.Penna Cemen t 
Industries (P) Ltd., 
Bangalore 
34. Sorang  HEP,  near 
Barakhamba village, Mandi 
Himachal Pradesh 
 
2 x 50 
 
58600 
 
200

M/s. Himachal Sorang 
Power Pvt. Ltd., Hyderabad 

  
Preparation of DPR 
46 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
35. Maranahalli MHS near 
Maranahalli, Hassan District, 
Karnataka. 
3 x 4.70  5313  2006  M/s.Deepak Cables, 
Bangalore. 
36. Iggalur Barrage MHS, near 
Iggalur village, Bangalore 
District, Karnataka. 
 
1 x1.50 
 
861 
 
2006 
M/s. Saroj Energy Co. Pvt. 
Ltd., Bangalore. 
37. Adishakthi Maramma MHS, 
Mandya District, Karnataka. 
4 x 6  
9600 
 
2006 
M/s. Pioneer Genco Private 
Ltd., Hyderabad 
38. Shalvi MHS Shimla District, 
Himachal Pradesh State. 
 
2 x 3.
 
 
4859 
 
2006 
M/s. Oriental Structural 
Engineers Pvt. Ltd., New 
Delhi. 
 
39. 
Yatanur MHS, near 
Gulbarga District Karnataka. 
2 x 3  2000  2006 M/s. SKN Hydro Energy 
Pvt Ltd. 
 
40 
Yatanur Mini Hydel Scheme, 
Bijapur District, Karnataka. 
2 x 2  
1600 
 
2005 
M/s. SKN Hydro Energy 
Pvt Ltd., Ba
 
 
41. 
Kallaja MHS, near Kallaja 
village Dakshina Kannada 
District, Karnataka. 
3 x 2.5  3943  2005 M/s.Srishti Power Pvt. Ltd., 
Bangalore. 
 
42. 
Kollya MHS, near Kollya / 
Veeramangala  village 
Dakshina Kannada District, 
Karnataka. 
6 x 3  9671  2005  M/s.SNC Power 
Corporation Pvt. Ltd., 
Bangalore 
 
43. 
Neerukatte  MHS, 
Neerukatte  Village Da
 
Kannada District, Karnataka. 
4 x 3.75  8185  2005  M/s..Sagar Power 
(Neerukatte) Ltd., 
Bangalore. 
 
44. 
Perla MHS, near Perla 
village Dakshina Kannada 
District, Karnataka. 
5 x 4.80  9901  2005 M/s. AMR Power Pvt. Ltd., 
Bangalore 
45. Durgadahalla  MHS, near 
Charmadi village Dakshina 
Kannada District, Karnataka. 
2 x 9  9377  2005  M/
s. Corporate Hydro 
Energy Pvt. Ltd., 
Hyderabad. 
46. Dodda Betta MHS, Hassan 
District, Karnataka. 
3 x 7  7871  2005 M/s. Sanjeevini Power Pvt. 
Ltd., Bangalore. 
47. Somavathi  MHS, 
Chikkamangalur District, 
Karnataka. 
2 x 3  2746  2005 M/s. SRM Power Pvt. Lt., 
Bangalore. 

  
Preparation of DPR 
47 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
48. Astalakshmi MHS, near 
Kumbaradi  village, 
Chikkamangalur District, 
Karnataka. 
2 x 3.5  1816  2005  M/s..Shankaranarayana 
Power Enterprises Pvt Ltd., 
Bangalore. 
49. Uyamballi MHS, near 
Koggedoddi,  Bangalore 
District, Karnataka 
 
2 x 5 
 
5512 
 
2005 
M/s. SNS Power Project 
Pvt., Bangalore. 
50. Surlabi MHS in Somavarpet 
Taluk, Kodagu District, 
Karnataka 
 
2 x 2 
 
1600 
 
2005 
M/s. Core Green Hydro 
Power India Pvt Ltd., 
Hyderabad 
51. Gondi  MHS  near 
Sidlipura,Tarikere Taluk 
Ch
ikkamangalur District, 
Karnataka 
 
2 x 1.5 
 
1500 
 
2005 
M/s. Bhadragiri Power Pvt 
Ltd., Bangalore. 
52. Detailed Survey and 
Investigation work, EIA 
Study and Preparation of 
DPR for following Projects. 
a) Belliyur HEP 
b) Neerukatte  HEP 
 
 
 
 
15 
15 
 
 
 
 
8200 
8200 
 
 
 
 
2005 
2005 
M/s. NTPC Hydro Ltd., 
Noid, NC
 Delhi 
53. Adahole MHS Phase 1 and 2 
near Dakshina Kannada 
District, Karnataka. 
 
 
2 x 12.5 
 
 
12500 
 
 
2005 
M/s. Trimurthi Power Pvt 
Ltd., Bangalore. 
54. Gugal  Small  Hydel 
Scheme,Gulbarga District, 
Karnataka. 
 
3 x 3.34 
 
4958 
 
2004 
M/s. SRS Energy Private Ltd., 
Bangalore. 
55. Somanamaradi Small Hydel 
Project  on Upper Krishna 
Right Bank Canal, Raichur 
District, Karnataka. 
 
 
4 x 6 
9600  2004  M/s. Narayanapur Power Co. 
Pvt. Ltd., Bangalore 
56. Baje MHS Udupi District, 
Kar
nataka. 
3 x 1  1456  2004  M/s. Devar Power Pvt. Ltd., 
Bangalore. 
58. Kadamane MHS‐II, Hassan 
District, Karnataka. 
2 x 7.5  8500  2004  M/s.Nagarjuna Holdings (P) 
Ltd., Hyderabad. 
59. Hullahalli  MHS, near 
Hullahalli/ Ramapura village, 
Mysore District, Karnataka. 
2x1  800  2004  M/s.Karnataka Renewable 
Energy Development Ltd., 
Bangalore. 

  
Preparation of DPR 
48 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
60. 
 
Shivanasamudram  MHS, 
Malavalli Taluk, Mandya 
District, Karnataka 
1 x 1  452  2004  M/s.Vakkal Power 
Corporation Ltd., Bangalore. 
61. 
 
Chikkmandya  MHS, 
Chikkmandya,  Mandya 
District, Karnataka. 
1 x 0.50  471  2004  M/s.Adichunchanagiri 
Energy Projects Pvt. Ltd., 
Mandya. 
62. Hullahalla MHS, Dhanagere, 
Mandya District, Karnataka. 
3 x 4  4740  2004 M/s. Limbavali Power Pvt. 
Ltd., Bangalore. 
 
63. 
 
Dinnekere  MHS, 
Chikkamangalur District, 
Karnataka. 
 
2 x 3 
 
3000 
 
2004 
M/s. Vejetha Glazed Tiles 
Industries, Hyderabad, 
Andhra Pradesh. 
64. Afzalpur MHS, near 
Afzalpur,Gulbarga District, 
Karnataka. 
 
2 x 4 
 
4520 
 
200

M/s. Jasper Energy Pvt Ltd., 
Bangalore 
65. 
 
Sonna MHS, near soma 
villege Gulbarga District, 
Karnataka. 
 
2 x 3 
 
3300 
 
2004 
M/s. Jasper Energy Pvt Ltd., 
Bangalore 
66. Singatalur‐Huligudda MHS 
near Thimmalapur village, 
Bellary District, Karnataka 
 
3 x 6 
 
6000 
 
2003 
M/s. Tungabhadra Power 
Co. Pr
 Ltd., Bangalore. 
67 Mannapitlu MHS, near 
Arambodi village Dakshina 
Kannada District, Karnataka. 
3 x 5  6320  2003 M/s.Bobba Power Projects, 
Bangalore. 
68. Mulibettu MHS, near 
Mulibettu village Dakshina 
Kannada District,Karnataka. 
 
2 x 4.5 
 
4282 
 
2003 
M/s.Mount Kailash Power 
Projects Pvt. Ltd. Bangalore. 
69. 
 
Kilanjara MHS, near Kalladi 
village Da
kshina Kannada 
District, Karnataka. 
2 x 3  3052  2003  M/s.Phalguni Power 
Projects‐1, Bangalore. 
70. 
 
Kolavur MHS., near Niralike 
village Dakshina Kannada 
District, Karnataka. 
 
2 x 4.5 
 
4368 
 
2003 
M/s.Phalguni Power 
Projects‐2, Bangalore. 
71. 
 
Horiabbe MHS, near 
Siddapur village Udupi 
District, Karnataka. 
2 x 3  2596  2003  M/
s. S.K. Farms, Hubli. 

  
Preparation of DPR 
49 
Sl. 
No 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
72. MGHE MHS Shimoga 
District, Karnataka. 
2 x 10  11500  2003 M/s.Suchindra Investment 
& Financial Services, 
Bangalore 
73. Abilbiru MHS, Hassan 
District, Karnataka. 
2 x 3  2273  2003 M/s. South‐West Hydro 
Power Pvt. Ltd., Bangalore. 
74. 
 
Somavathi  MHS, 
Chikkamangalur District, 
Karnataka. 
2 x 3  2698  2003 M/s. SRM Power Pvt. Lt., 
Bangalore. 
75. Akkihebbal MHS, Mandya 
District, Karnataka. 
2 x 1.25  
700 
 
2002 
M/s. Cauvery Hydro 
En
ergy Ltd Bangalore 
76. 
 
Kadamane MHS‐I, Hassan 
District, Karnataka. 
2 x 4.5  5200  2001 M/s.Paschim Hydro Energy 
(P) Ltd., Hyderabad. 
77. 
 
Kumudavati Mini Hydel 
Scheme,Haveri  District, 
Karnataka. 
2 x 0.250  361.98  
2001 
M/s. Krisri Power Tech Pvt 
Ltd, Bellary Karnataka 
78. 
 
Keertihole MHS near 
Kutupuzha village,Virajpet 
Taluk, Kodugu Di
 
Karnataka. 
 
3 x 8 
 
7200 
 
2001 
M/s. Subash Project & 
Marketing Co Pvt Ltd., 
Bangalore, 
79. 
 
Hemavathi High Level 
Canal MHP,Gorur, Hassan 
District, Karnataka. 
2 x 2  600  
2000 
M/s. Flax India Limited 
Bangalore 
 
80. 
Hebbakawadi MHSMandya 
District, Karnataka. 
 
2 x 1 
400  1999 M/s. Jayalakshmi Power Co 
Pr
ivate Ltd., Bangalore 
81. 
 
Maddur Canal MHSMandya 
District, Karnataka. 
2 x 1.5  500  1998  M/s. Khodays Ltd., 
Bangalore 
82. 
 
New Ganderbal Hydro 
Electric Project, near Jammu, 
Jammu and Kashmir State   
3 x 15 
 
4000 
 
 
1996 
M/s. Ch ief Engineer PDC 
J&K State. Through M/s. 
THC New Delhi. 
 

  
Pre‐Feasibility Study Report 
50 
D. PRE‐FEASIBILITY STUDIES  OF POWER PROJECT 
 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
1 Baje‐Hiriadka MHS, Udupi 
District, Karnataka. 
 
2 x 1.5 
1425  
2011 
M/s. Aparimita Power 
Ventures PVt Ltd., 
Bangalore 
2 Gulisattenhalli  MHS, 
Hasan District, Karnataka. 
 
2 x 2.5 
3185  
2011 
M/s. Aparimita Power 
Ventures PVt Ltd., 
Bangalore 
3 Kuppahalli MHS, Mandya 
District, Karnataka. 
 
2 x 2 
2123  
2011 
M/s. Aparimita Power 
Ventures PVt Ltd., 
Bangalore 
4 Bellur  MHS, Dakshina 
Kannada  District, 
Karnataka. 
 
2 x 1.5 
1500  
2010 
M/s. Muktar Po
 (India) 
Private Ltd., Goa 
5 Mundaja Hole MHS, 
Dakshina  Kannada 
District, Karnataka. 
 
2 x 1 
1000  
2010 
M/s. Muktar Power (India) 
Private Ltd., Goa 
6 Ujre MHS, Dakshina 
Kannada  District, 
Karnataka. 
 
2 x 1.5 
1500  
2010 
M/s. Muktar Power (India) 
Private Ltd., Goa 
7 Kumadvati MHS near 
Anjanapura 
C
hnnarayapatna, 
Karnataka. 
 
2 x 1.5 
 
1400 
 
2010 
M/s. Brigade Infra Pvt Ltd 
Bangalore 
8 Um‐Lunar  SHEP, 
Meghalaya  Northeast 
State. 
2 x 12  20000  2009  M/s. Green Valliey 
Industries Private Ltd., 
Kolkatha. 
9 Gurkhi MHS, Belgaum 
District, Karnataka. 
 
3 x 6 
9000  2009 M/s. Aditya Infrastructure 
Hyderabad 
10 Potli MH
S, Belgaum 
District, Karnataka. 
3 x 6  9000  2009 M/s. Aditya Infrastructure 
Hyderabad 
11  Chagotkallu MHS, Raichur 
District, Karnataka. 
 

600  
2009 
M/s. Samvah Energy Pvt Ltd 
Bangalore 
12  Hurley MHS Hassan 
District, Karnataka. 
1  540  2009  M/s. Classic Group Pvt Ltd., 
Bangalore 
13. Kangtangshiri  HEP 
Arunachal Pradesh. 
2 x 17.5  20000  2008  M/s. Raajratna  Metal 
Industries, Hyderabad 

  
Pre‐Feasibility Study Report 
51 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
14. Ropum HEP Arunachal 
Pradesh. 
40  32000  2008  M/s. Raajratna  Metal 
Industries, Hyderabad 
15. Barpu HEP Arunachal 
Pradesh. 
135  111645  
2008 
M/s. Raajratna  Metal 
Industries, Hyderabad 
16. Par HEP Arunachal 
Pradesh 
96  79400  2008  M/s. Par Infra Limited, 
Hyderabad. 
17. Dardu HEP Arunachal 
Pradesh. 
3 x 25  52000  2008 M/s. Dardu Power Pvt Ltd., 
Hyderabad. 
18. Alavalli MHS Hassan 
District Karnataka. 
2 x2  1600  200
 M/s. Hotel Maruthi Pvt. Ltd. 
Bangalore. 
19. Pema Shelphu ‐ HEP.  
Arunachal Pradesh. 
97.5  61900  2008  M/s. Raajratna  Energy 
Holdings Pvt. Ltd. 
Hyderabad. 
20. Marwari  HEP, 
Uttarakhand State. 
8  4000  2008 M/s. R.R. Construction & 
Infrastructure India Pvt Ltd. 
Hyderabad 
21. Balganga‐II  HEP. 
Uttarakhand State. 
7  3500  2008 M/s. R.R. C
 & 
Infrastructure India Pvt Ltd. 
Hyderabad 
22. Doodh Ganga / Meena 
HEP. Uttarakhand State. 
6  3000  2008 M/s. R.R. Construction & 
Infrastructure India Pvt Ltd. 
Hyderabad 
23. Bernigad HEP, 
Uttarakhand State. 
6.5  3300  2008 M/s. R.R. Construction & 
Infrastructure India Pvt Ltd. 
Hyderabad 
24. Vijaya Nagar‐Rampur HEP 
Uttarakhand St
 
20  1000  2008 M/s. R.R. Construction & 
Infrastructure India Pvt Ltd. 
Hyderabad 
25. Rampur‐Tilwari  HEP 
Uttarakhand State. 
25  12500  2008  M/s. R.R. Construction & 
Infrastructure India Pvt Ltd. 
Hyderabad 
26. Madya Maheshwar HEP 
Uttarakhand State. 
18  9000  2008  M/s. R.R. Construction & 
Infrastructure India Pvt Ltd. 
Hyderabad 
27. Kepjog Mini Hydel 
Scheme,Jog,  Shimoga 
District Karnataka. 
10  4800  2008  M/s. Vensai Power Projects 
Pv
t Limited, Hyderabad 

  
Pre‐Feasibility Study Report 
52 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
28. 35 MW Bio Mass Power 
Plant near eggbough, 
Leeds, U.K 
35  US $ 700,000 2008  M/s. Dass Green Energy 
Inc., Boston, USA. 
29. Baipadi MHS, Dakshina 
Kannada  District, 
Karnataka. 
2 x 3  2682  2007 M/s. Srishti Power Pvt. Ltd., 
Bangalore. 
30. Hemavathi Right Bank 
Canal MHS Stage‐II. 
Hassan District, Karnataka. 
 
2 x 1 
1350  
2007 
M/s. Sri Maruthi Power Gen 
India Pvt. Ltd. Bangalore. 
31. Kela  Chavadi 
MHS,Agumbe, Shimoga 
District, Karnataka. 
 
2 x 2 
120
0  
2007 
M/s. Delmon Energy Pvt. 
Ltd. Bangalore. 
32. Hosakambi MHS,Uttara 
Kannada  District, 
Karnataka. 
 
2 x 2 
1200  
2007 
M/s. Mysore Mercantile Co. 
Ltd. Bangalore. 
33. Dugganballu MHS, Uttara 
Kannada  District, 
Karnataka. 
 
2 x 2.5 
3141  
2007 
M/s. Mysore Mercantile Co. 
Ltd. Bangalore. 
34. Tombattu Hole MHS, 
Shi
moga  District, 
Karnataka. 
 
1 x 2 
1000  
2007 
M/s. Siddhi Vinayaka 
Spechem Pvt Ltd., 
Bangalore 
35. Bairekoppa MHS, Dharwar 
District, Karnataka. 
 
2 x 2.5 
3320  
2007 
M/s. Mysore Mercantile Co. 
Ltd. Bangalore. 
36. Kalgodu  MHS, 
Chikkamagalur District, 
Karnataka. 
 
 
2 x 1 
1080  
2007 
M/s. Saisri Power Projects & 
Sy
stem Pvt Ltd Bangalore 
37. Sondahalla MHS, Uttara 
Kannada  District, 
Karnataka. 
 
2 x 3.5 
2555  2007  M/s. Disha Power 
Corporation Pvt Ltd 
Bangalore 
38. Kelasi MHS, Hubli‐
Dharwar  District, 
Karnataka. 
 
2 x 2.5 
3036  
2007 
M/s. Abletech Electro 
Engineers Pvt Ltd Bangalore 
39. Kallur B MHS, Gulbarga 
District, Karnataka. 
 
4 x 4 
618
1  
2007 
M/s. Jasper Energy Pvt Ltd., 
Bangalore 
 

  
Pre‐Feasibility Study Report 
53 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
40. Gundiadka  Small 
Hydropower  Project. 
Dakshina  Kannada 
District, Karnataka. 
5  1790  2007  M/s. Saileela Power Pvt. 
Ltd. Bangalore 
41. Kottanadka Mini Hydel 
Scheme, Kodagu District, 
Karnataka. 
2 x 1  1200  2007 M/s. AMR Power Private 
Ltd. Bangalore. 
42. Kannadagal MHS,Uttara 
Kannada  District, 
Karnataka. 
2 x 12  13200  2007 M/s. Trident power Systems 
Pvt Ltd., Hyderabad. 
43. Illva MHS Uttara Kannada 
District, Karnataka. 
7.5  3771  2007 M/s. Sri Shankara Narayana 
Po
wer Corporation Pvt Ltd., 
Bangalore. 
44. Kalgatta MHS Dakshina 
Kannada  District, 
Karnataka 
2 x 2.5  2800  2007 M/s. Samvah Energy Pvt 
Ltd., Bangalore. 
45. Kubjanadi MHS Udupi 
District, Karnataka 
2 x 2.5  1750  2007 M/s. PSR Hydro Energy Pvt 
Ltd., Bangalore. 
46. Manchikeri MHP Uttara 
Kannada  District, 
Karnataka. 
 
3 x 6  621
0  2007 M/s. PSR Hydro Energy Pvt 
Ltd 
47. Kurkamane Mini Hydel 
Scheme, Hassan District, 
Karnataka. 
 
24  8676  2006 M/s. Trimurthy Power Pvt. 
Ltd. Bangalore. 
48. Nanniru Halla, Shimoga 
District, Karnataka 
2 x 2  1800  2005 M/s. Pinnacle Renewable 
Energy Pvt. Ltd., Bangalore. 
49. Ulippu MHS, Udupi 
District, Karnataka 
2 x 6  595
8  2005  M/s. NTPC Hydro Ltd., 
Noida. 
50. Kallaja MHS, Udupi 
District, Karnataka 
 
2 x 3  2662  2005 M/s. Srishti Power Pvt. Ltd., 
Bangalore. 
51. Devaragundi MHS, Udupi 
District, Karnataka. 
2 x 2  1814  2005 M/s. Astra Infrastructure 
Pvt. Ltd., Secunderabad. 
 

  
Pre‐Feasibility Study Report 
54 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
52. Horabele MHS, Udupi 
District, Karnataka 
1.00  3663  2005 M/s. Karnataka  Renewable 
Energy Development Ltd., 
Bangalore. 
53. Biligere MHS, Udupi 
District, Karnataka. 
2  851  2005 M/s. Astra Infrastructure 
Pvt. Ltd., Secunderabad. 
54. Surlabi MHS, Dakshina 
Kannada  District, 
Karnataka. 
2 x 2  1932  2005 M/s.Karnataka  Renewable 
Energy Development Ltd., 
Bangalore., Bangalore. 
55. Haraga Hole MHS, 
Dakshina Kannada  District, 
Karnataka. 
2 x 1.5  1363  2005  M/s.Karnataka Renewable 
Energy Development Ltd., 
Bangalore. 
56. Mukkodlu MHS Dakshina 
Kannada District, Karnataka. 
1.50  681  2005  M/s.Karnataka Renewable 
Energy Development Ltd., 
Bangalore. 
57. Sirangahalli MHS, Kodagu 
District, Karnataka. 
0.80  331  2005 M/s.Karnataka  Renewable 
Energy Development Ltd., 
Bangalore. 
58. Bhadrakali Mini Hydel 
Scheme, Kodagu District, 
Karnataka. 
0.70  344  2005 M/s.Karnataka  Renewable 
Energy Development Ltd., 
Bangalore. 
59. Chapparahalla MHS Phase 
I Karnataka. 
2 x 7  4200  2005 M/s. Akasha Ganga Energy 
Pvt. Ltd., Bangalore. 
60. Ch
 MHS Phase 
II Karnataka. 
3  900  2005 M/s. Akasha Ganga Energy 
Pvt. Ltd., Bangalore. 
61. Katigudde MHS Kodagu 
District, Karnataka. 
2  915  2005 M/s. Delta Power Projects 
Pvt. Ltd., Bangalore. 
62. Murukannu  MHS, 
Sakeleshpura,  Hassan 
District, Karnataka. 
 
2 x 5.5 
 
4360 
2004  M/s. Paschim Holdings 
private Ltd., Hyderabad. 
63. Ba
 MHS, Karnataka.  2 x 6  3720  2004  M/s. Paschim Holdings 
private Ltd., Hyderabad. 
64. Hulikal Hole MHS, Udupi 
District, Karnataka. 
2 x 2  1700  2004 M/s. Devar Power Pvt. Ltd., 
Bangalore. 
65. Vuddigudda  MHS, 
Chickmagalore District, 
Karnataka. 
2 x 0.45  591  2004 M/s. Woodae Gooda  Coffee 
Estate Mercara, Kodagu 
Di
strict Karnataka 

  
Pre‐Feasibility Study Report 
55 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
66. Kadamane Mini Hydel 
Scheme‐II, Sakeleshpura 
Hassan District, Karnataka 
2 x 5  4500  2004 M/s. Nagarjuna Holdings 
Pvt Ltd., Hyderabad. 
67. Durgadahallihalla  Mini 
Hydel Scheme, Karnataka. 
3 x 6  7500  2004 M/s. Nagarjuna Holdings 
Private Ltd., Hyderabad. 
68. Koo Hole MHS, Madapura, 
Kodagu District,Karnataka. 
1  461  2004 M/s.Karnataka  Renewable 
Energy Development Ltd., 
Bangalore. 
69. Napanda Hole MHS, 
Garavale, Kodagu District, 
Karnataka. 
1 x 0.50  273  2004 M/s. Karnataka  Renewable 
Energy Development Lt
 
Bangalore. 
70. Sulugodu  MHS  – 
Megaravalli, Hosanagara 
Taluk, Shimoga District, 
Karnataka 
1 x 1  446  2004 M/s. Syed Ibrahim & Sons, 
Shimoga. 
71. Koynad MHS, Madikeri 
Taluk, Kodagu Dakshina 
Kannada  District, 
Karnataka. 
2 x 1.75  1880  2004 M/s.Sadguru Sai Energies 
Pvt. Ltd., Bangalore. 
72. Beliyur MHS South 
Kannada  District, 
Karnataka. 
2 x 7.
5  9736  2004  M/s. NTPC Hydro Ltd., 
Noida. NCR New Delhi. 
73. Nirkatte MHS Dakshina 
Kannada  District, 
Karnataka  
3 x 5  7204  2004  M/s. NTPC Hydro Ltd., 
Noida. New Delhi 
74. Dodda Betta MHS 
Dakshina  Kannada 
District, Karnataka 
74  19438  2004  M/s. NTPC Hydro Ltd., 
Noida. New Delhi 
75. Ku
lkunda MHS Dakshina 
Kannada  District, 
Karnataka 
2 x 9.5  8260  2004  M/s. NTPC Hydro Ltd., 
Noida. New Delhi 
76. Bhimanakallu  MHS 
Dakshina  Kannada 
District, Karnataka  
3 x 4.5  6383  2004  M/s. NTPC Hydro Ltd., 
Noida. New Delhi 
77. Kollya MHS Dakshina 
Kannada District, Karnataka 
3 x 6  9348  2004  M/s. NTPC Hydro Ltd., 
Noida. New Delhi 

  
Pre‐Feasibility Study Report 
56 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
78. Bajimane MHS Udupi 
District, Karnataka 
2  946  2004 M/s. Falcon Power Pvt. Ltd., 
Bangalore. 
79. Devaragundi  MHS, 
Dharmasthala Dakshina 
Kannada  District, 
Karnataka. 
 
2 x 2 
1814  
2004 
M/s. Aster Infrastructure 
Pvt. Ltd. Hyderabad. 
80. Ganadahalli MHP Mandya 
District, Karnataka. 
 
2 x 2.5 
1915  
2004 
M/s. SMR power Pvt Ltd., 
Bangalore 
 
81. Biligeri MHS, Madikeri, 
Kodugu  District, 
Karnataka 
 
2 x 1 
851  
2004 
M/s. As
 Infrastructure 
Pvt Ltd Hyderabad 
 
82. Gulgal MHS, Gulbarga 
District, Karnataka 
3 x 3.3  3623  2004 M/s. SRS Energy Pvt Ltd., 
Bangalore 
83. Kadamane Mini Hydel 
Scheme‐I, Hassan District, 
Karnataka. 
 
2 x 3 
 
3000 
2003  M/s. Paschim Holdings 
private Ltd., Hyderabad. 
84. Hachinad Mini Hydel 
Scheme, Kodagu District, 
K
arnataka. 
2 x 1  1118  2003 M/s.Karnataka  Renewable 
Energy Development Ltd., 
Bangalore. 
85. Uyamballi MHS, Bangalore 
District, Karnataka. 
2 x 5  3663  2003 M/s.Karnataka  Renewable 
Energy Development Ltd., 
Bangalore. 
86. Abilbiru  MHS, 
Sakaleshpura  Hassan 
District, Karnataka 
2 x 2.25  1350  2003 M/s. South West Hydro Pvt 
Ltd., Bangalore. 
87. Kunchikal Falls MH
S, 
Dakshina  Kannada 
District, Karnataka. 
2 x 2.5  1500  2003 M/s. South Can ara Electric 
Co. Pvt. Ltd., Bangalore. 
88. Hosangadi Mini Hydel 
Scheme,  Dakshina 
Kannada  District, 
Karnataka 
2 x 1.5  1230  2003  M/s.Hosangadi Hydro 
Power Projects Ltd., 
Bangalore. 
89. Upper Kaneri MHS, Uttara 
Kannada  District, 
Karnataka. 
 
2 x 5 
3000  
200

M/s. Sree Swarna Energy 
Ltd Hyderabad. 

  
Pre‐Feasibility Study Report 
57 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
90. Dinnekere  MHS, 
Chikmagalur  District, 
Karnataka. 
 
2 x 0.5 
459  
2003 
M/s. Jasper Energy Pvt Ltd 
Bangalore. 
 
91. Mannapittlu Hydro‐Power 
Projects Dakshina Kannada 
District, Karnataka 
3 x 3  4540  2003 M/s. Bobba Power Projects 
Pvt Ltd., Bangalore 
92. Debewadi  MHS, 
Chandryapatana, Hassan 
District, Karnataka. 
2 x 2.5  2569  2003  M/s. Aji Engineering 
Bangalore. 
93. Pre‐feasibility Report on 
Wind Energy Farm near 
Chitradurga, Karnataka. 
 
10 x 0.5 
 
200

2002  M/s.Khoday Ltd., 
Bangalore. 
94. KIOC  L  Tailings 
Classification  & 
Distribution Project 
   2002 M/s. Roche Mining. (MPJV) 
Melboune Au strlia 
95. Dodda Halla Mini Hydel 
Scheme, Chickmagalore 
District, Karnataka. 
 
3 x 6 
 
900 
2001 M/s. Klen & Marshall Ltd., 
Bangalore. 
96. Singatalur‐Huligudda 
MHS, Hospet, Bellary 
District, K
 
 
3 x 6 
 
7200 
2001 M/s. Reddy Veeranna & Co., 
Private Bangalore. 
 
97. Horiabbe MHS, Udupi 
District, Karnataka. 
2 x1.5 + 
1x0.5 
1877  2001  M/s. S K Farm Pvt Ltd., 
Hubli 
98. Hebbakawadi MH Sin 
Mandya  District, 
Karnataka 
 
3 x 1 
 
600 
2000 M/s. Gilda Investments & 
F
inancing, Bangalore 
99. Right Bank High Level 
Canal  MH  Sat 
Tungabhadra  Dam, 
Hospet, Bellary District, 
Karnataka. 
 
2 x 1.5 
 
400 
2000 M/s. Tungabhadra Power 
Co. private Ltd., Bellary. 
 
100. 2 x 5 MW Elaneeru Mini 
Hydel Scheme, Dakshina 
Kannada  District, 
Karnataka. 
 
 
2 x 5 
 
3600 
2000 M/s. Nagarjuna E
ngineering 
& Con tracts Private Ltd., 
Hyderabad. 

  
Pre‐Feasibility Study Report 
58 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
101. Elaneeru  MHS 
Chickmagalore District, 
Karnataka. 
 
 
 
2 x 3 
3000  
 
2000 
M/s. Nagarjuna Engineering 
& Corporation Co. Pvt Ltd. 
Hyderabad. 
102. Kabbinale Mini Hydel 
Scheme,  Dakshina 
Kannada  District, 
Karnataka. 
 
2 x 1 
 
700 
1999 M/s. Sanicons Engineering 
& Con tracts Pvt Ltd, 
Bangalore. 
103. Preparation of Executive 
Summary report on 
Kattepura MHS near 
Kattepura  village 
Arakalgud,  Hassan 
District, Karnataka. 
2 x 1  600   M/s. Bright Vidyut Co Pvt 
Ltd., Bangalore 
 

  
Pre‐Tender Services 
59 
E. PRE‐TENDER SERVICES 
 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
1. Indrasagar  Pollavaram 
Multipurpose Project – A 
project of National Interest. 
Multipurpose 
Project 
450000  2011 M/s. ILFS Hyderabad. 
2. Ghattaprabha HEP at 
Ghattaprabha Dam, Karnataka 
EPC bid 
2 x 10  4000  2011  M/s. Megawin 
Switchgear Pvt. Ltd., 
Salem Tamil Nadu. 
3. Pre‐Tender service for Canal 
Distribution network and 
ancillary  structures 
preparation of GAD’s for 
Bridges, Aqueducts, Siphons 
etc. 
Irrigation 
Project 
—  2011  M/s. Associated 
Engineering Consultants 
& Analysts Pv
 Ltd., 
Mumbai. 
4. Balance of Plant for Rafha Gas 
Based Power Plant, Kingdom 
of Saudi Arabia. 
400  —  2011  M/s. ILF Consulting 
Engineers Abudabhi, 
UAE 
5. Balance of Plant for AL—Jong 
of Gas Based Power Plant, 
Kingdom of Saudi Arabia. 
400  —  2011  M/s. ILF Consulting 
Engineers Abudabhi, 
UAE 
6. Pr
‐Tender Services for 
Electro‐Mechanical Equipment 
for Dumajorhi SHEP 
2 x 7.5  —  2011  M/s. Megawin 
Switchgear Pvt Ltd., 
Salem, Tamil Nadu. 
7. Pre‐Tender Services for Balgad 
SHEP, Uttarkhand State 
3 x 6.6  —  2011  M/s. Simplex 
Infrastructures Ltd., 
Mumbai. 
8. Pre‐Tender Services for 
Khutani SHEP Uttarkhand 
St
ate. 
3 x 7  —  2011  M/s. Simplex 
Infrastructures Ltd., 
Mumbai. 
9. Pre‐Tender Services for 
Seraghat SHEP Uttarkhand 
State 
3 x 3.7  —  2011  M/s. Simplex 
Infrastructures Ltd., 
Mumbai. 
10. Balance of Plant for Qassim 
Gas Based Power Plant 
Qassim Kingdom of Saudi 
Arabia. 
400  —  2010  M/s.ILF Consulting 
Engineers Ab
udabhi, 
UAE. 

  
Pre‐Tender Services 
60 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
11. Balance of Plant for Tabouk‐2 
Gas Based Power Plant 
Tabouk, Kingdom of Saudi 
Arabia. 
2 x 70  —  2010  M/s.ILF Consulting 
Engineers Abudabhi, 
UAE. 
12. Basanthpur and Saradih 
Barrage, Janjgir District, 
Chhattisgarh. 
Irrigation 
Project 
—  2010  M/s. Simplex 
Infrastructure Co Pvt 
Ltd., Mumbai. 
13. Kachchh Branch Canal and 
Rewa Branch Canal‐ Gujarat. 
Irrigation 
Project 
—  2010  M/s. Simplex 
Infrastructure Co Pvt 
Ltd., Mumbai. 
14. Bheden ‐Jharsuguda Water 
Supply, Orissa. 
Water Supply  —  2010  M/s. Simplex 
In
frastructure Co Pvt 
Ltd., Mumbai. 
15. Bansagar‐1 SHEP, Mirzapur 
District, Uttar Pradesh 
9.5  4800  2010  M/s. Simplex 
Infrastructure Co Pvt 
Ltd., Mumbai. 
16 Somavathi MHS  9  3000  2010  M/s.Velankeni 
Renewable Energy Pvt 
Ltd,.Bangalore. 
17. Bandraun SHEP Lalitpur 
District, Uttar Pradesh 
14.0 MW  —  2010  M/s. Simplex 
Infrastructure Co Pvt 
Ltd., Mu
 
 
18. Condenser Cooling System for 
2 x 300 MW EMCO TPP 
Warror Maharashtra 
2 x 300  —  2010 M/s.Gammon India Ltd., 
Mumbai 
19. Plant Water System Package 
for Kakrapara Atomic Power 
Project 3 & 4 units Gujarat 
 
2 x 700   2010 M/s.Gammon India Ltd., 
Mumbai. 
20. Dhaulasidh HEP, Hi
 
Pradesh. 
 
40 MW  2000  2010  M/s.Design  Group + 
M/s.Feedback Ventures 
(Joint Venture) 
21. Kalisindh Dam Project in 
Rajastan 
Irrigation 
Project 
4000  2010  M/s.Simplex 
Infrastructures Ltd. 
Mumbai 

  
Pre‐Tender Services 
61 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
23. Detail  Con struct ion 
Methodology for Vishnugad‐
Pipalkoti HEP in Uttranchal. 
—  —  2010 M/s. Rithwik Projects 
Pvt. Ltd. Hyderabad 
 
24. Meja SHEP, Mirzapur District, 
Uttar Pradesh. 
9.00  —  2010  M/s. Simplex 
Infrastructure Co Ltd., 
Mumbai. 
25. Pre‐Tender Services for 
Transportation of Water from 
Mahanadi River at Cuttack to 
Paradip for Paradip Refinery 
at Orissa. 
Water Supply  20000  2009 M/s. Gammon India Ltd., 
Mumbai 
26. Pashdan Irrigation Project in 
Afghanistan 
I
rrigation 
Project 
US $ 90 
Million 
2009 M/s.Hewadwal Group 
Kabul, Afghanistan 
27 Almar Irrigation Project in 
Afghanistan 
Irrigation 
Project 
US $ 190 
Million 
2009 M/s.Hewadwal Group 
Kabul, Afghanistan 
28. Shah‐wa‐Arus Irrigation and 
Hydro Power Project in 
Afghanistan 
Irrigation 
Project 
US $ 45 
Million 
2009 M/s.Hewadwal Group 
Kabul, Afghanistan 
29. Se
 Water Intake System for 
Ultra Mega Power Project at 
Krishnapatnam,  Andhra 
Pradesh.‐ 6 x 660 MW 
Water Supply  1200  2009 M/s. Gammon India Ltd. 
Mumbai 
30. Raw Water Supply System for 
Alumina Refinery Expansion 
Project of M/s.Vedanta 
Aluminium Limited at 
Linjigarh in Kalahandi District 
of Orissa. 
 
Water Supply   2008 M/
 Gammon India Ltd., 
Mumbai 
31. Upper Bhadra Irrigation Canal 
Network System Package II 
 
Irrigation 
Project 
  2007 M/s. Gammon India Ltd., 
Mumbai 
32. Upper Bhadra Irrigation 
Project‐Package Numbers 1 & 
3 Shimoga District, Karnataka. 
 
Irrigation 
Project 
  2007 M/s. Gammon India Ltd., 
Mumbai 

  
Pre‐Tender Services 
62 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
33. Plant Water Supply Scheme at 
JSW‐Vijaynagar Steel Plant at 
Thoranagal, Bellary District, 
Karnataka. 
Water Supply  —  2007 M/s. Gammon India Ltd., 
Mumbai. 
34. Review of draft EPC for Penan 
HEP, Sikkim India 
4 x 70  10000  2007 M/s. Hemagiri Hydro 
Energy Company Pvt 
Ltd., New Delhi. 
35. Left Bank of Indrasagar 
(Pollavaram)  HEP  in 
Anguluru  Devapatnam 
Mandal, East Godavari 
District, Andhra Pradesh 
Irrigation 
Project 
  
2006 
M/s. Maytas Infra Pvt 
Ltd., Hyderabad 
36. Galeru Na
 Sulaja Sravanti 
(GNSS) Flow Can al Project, 
Phase‐I, Andhra Pradesh. 
Irrigation 
Project 
—  2006 M/s. Maytas Infra Private 
limited, Hyderabad. 
37. Galeru Nagari Sulaja Sravanti 
(GNSS) Flow Can al Project, 
Phase‐II, Andhra Pradesh. 
 
Irrigation 
Project 
—  2006 M/s. Maytas NCC JV 
Private limited, 
Hyderabad. 
38. Galeru Nagari Sulaja S
 
Project Andhra Pradesh 
 
Irrigation 
Project 
—  2006 M/s. Maytas Infra Private 
limited, Hyderabad 
39. Pre‐tender Services for 
Velagonda Irrigation Project, 
Nelagunda Dristrict Andhra 
Pradesh. 
 
Irrigation 
Project 
—  2005 M/s. Gammon India Ltd., 
Mumbai. 
40. Assistance in REQ/RFQ/ Offer 
for allotement of Badrinath 
HEP  near  Badrinath, 
Uttranchal State. 
 
2 x 70  800
00  2004 M/s. GMR Energy Ltd., 
Bangalore. 
41. Pre‐Tender services for 
Ainapur Lift Irrigation 
Scheme. 
 
Irrigation 
Project 
—  2003  M/s. Simplex 
Infrastructures Ltd. 
Mumbai 

  
Pre‐Tender Services 
63 
 
Sl. 
No. 
 
Name of the Project 
 
Installed 
Capacity in 
MW 
 
Project Cost 
in Rs. Lakhs 
 
Year 
 
Clients 
42. Pre‐Tender service for 
Singatalur Lift Irrigation 
Scheme, Karnataka. 
Irrigation 
Project 
—  2003 M/s. Chinnanachinuthu 
and Company Bangalore. 
43. Water Processing Projects 
Balance of Electrical Works 
Water Supply  —  2003 M/s. Movers (India ) Pvt 
Ltd., Bangalore 
44. Implementation of 3 x 5 MW 
Canal head Power house on 
Left Bank Can al of Indira 
Sagar Project, Madhya 
Pradesh. 
3 x 5  9000  2003 M/s. SEW Const ructions 
Ltd., New Delhi. 
45. Pr
e‐Tender Services for 
Singatalur Lift Irrigation 
Scheme ‐ 4 Packages. 
Irrigation 
Project 
12000  2002 M/s. Engineers Projects 
India Ltd., Chenn ai. 
 
46. Pre‐Tender services 400/220 
kV for connected civil works 
of Switchyard at Nelamangala, 
Bangalore for KEB, Bangalore. 
Substation  1100  2002  M/s. ABB Ltd., 
Bangalore. 
 
47. Bajemane MHS in Ko
 
District, Karnataka. 
2 x 1.5  450  2002 M/s. Falcon Power Pvt 
Ltd., Bangalore. 
48. Pre‐Tender service for Greater 
Aizawl water Supply scheme 
Phase II 
Water Supply  10000  2002 M/s. Johnson  Eastern 
Power Aizawl Mizoram. 
49. Pre‐Tender service for 
Singatalur Lift Irrigation 
Scheme. 
Irrigation 
Project 
—  2002  M/s. G.
 Ferandez 
Secunderbad Andhar 
Pradesh. 
50. Dam remodeling studies at 
Lyka –Lake at Kudremekh 
Iron Ore Co Ltd., 
—  —  2002 M/s. Rochie Mining Mt 
India Pvt Ltd., Cochin 
Kerala State India 
51. Pre‐Tender service for 
Periyapatna Lift Irrigation 
Scheme. 
Irrigation 
Project 
1200 
 
2001  M/s. NGEF Ltd., 
Bangalore 
52 Pr
‐Tender service for Balance 
of Civil Works for Link Canal 
MHS, Mandya District, 
Karnataka. 
1.5  150  2001  M/s. Mysore 
Construction Co Pvt 
Ltd., Bangalore. 

  
Pre‐Tender Services 
64 
 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
53. Pre – Tender Services for DG 
Captive Plants at Yemen. 
a) Sana’s (Option 1) 
b) Sana’s (Option 2 ) 
c) Hodaidah 
d) Taiz 
e) Aden 
 
 
3 x 5 
4 x 5 
2 x 5 
2 x 5 
2 x 5 
$ 40 M
illion. 2001 M/s. National Trading 
Co Ltd., Yemen. 
54. Pre‐Tender service for Cooling 
Water  System  at 
Ramagundam TPP, Andhra 
Pradesh. 
Water Supply  —  2001 M/s. Mega Engineering 
Enterprises, Hyderabad 
55. Technical Apprisal report on 
DPR of Dummagudem MHS 
across river Godavari at 
Dummagudam,  Andhra 
Pradesh. 
10  2500  2001 M/s. PSM Spinng Ltd., 
Hyderabad 
56. Pre‐Tender service for 
Si
raguppa MHS near 
Kenchanagudam  Village, 
Siraguppa Taluk Bellary 
District, Karnataka. 
2 x 2.5  2000  2001 M/s. Krishi Power Tech 
Pvt Ltd., Bellary, 
Karnataka 
57. Upper Bhadra Lift Irrigation 
Scheme, Karnataka. 
Irrigation 
Project 
—  2001 M/s. SNC, Bangalore. 
58. Preparation of RFQ for 
Thermal Power Plant at 
Baroda for M/s. GPCL. Gujarat 
500  225
00  2000 M/s. Bay West Power & 
Energy Pvt Ltd., 
Bangalore. 
59. Pre‐Tender services for Co‐
generation Captive Power 
Plant for M/s. Duncan 
Industries Ltd., at Khanpur. 
Uttar Pradesh. 
75  30000  1999 M/s. Bay West Power & 
Energy Pvt Ltd., 
Bangalore. 
60. Chuzachen HEP in East 
Sikkim State, 
2 x 40  —  199
9  M/s. Nagarjuna 
Construction Co Ltd., 
Hyderabad. 

  
Pre‐Tender Services 
65 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
61 Technical Evaluation Report 
on Hemavathy LBC MHS, 
Hemavathy river bed unit & 
Varahi Tail Race Scheme. 
—  —  1999  M/s. Bhrouka Power 
Corporation Ltd., 
Bangalore. 
62 Pre‐Tender services for 
Captive Power Plant at 
Kapasan, Rajasthan for M/s. 
HZL, Udaipur, Rajasthan. 
60  28000  1998 M/s. Bay West Power & 
Energy Pvt Ltd., 
Bangalore. 
63 Pre‐Tender services for DG 
Plant for Kerala State 
Electricity Board. Kerala 
40/60  24000  1998 M/s. Bay West Power & 
Energy Pvt Lt
 
Bangalore. 
64 Pulichintala Irrigation Project, 
Andhra Project. 
Irrigation 
Project 
1200  1998 M/s. Gammon India Ltd., 
Mumbai. 
65 Upper Tunga Canal Head 
Regulator, Shimoga District, 
Karnataka. 
Irrigation 
Project 
4000  1998  M/s. Karnataka 
Neeravari Nigam Ltd., 
Shimoga, Karnataka. 
66 Pre‐bid services for Koilsagar 
Lift Irrigation Scheme, Andhra 
Pradesh. 
Irrigation 
Project 
—  199
8  M/s. Nagarjuna 
Construction Co Ltd., 
Hyderabad. 
67 Pre‐Tender services for 132 kV 
Switchyard at Bidanasi, Orissa 
for M/s. OPGC. Ltd. 
Switchyard  670  1995 M/s. GEPC, Bangalore. 
68 Pre‐Tender services for 
connected Civil Works of Port 
Yard Lighting at Chen nai Port 
for Ennore Coal Port Project. 
 
Illumination  100  199
5 M/s. GEPC, Bangalore. 
69 Haliyal  Lift Irrigation Scheme, 
Karnataka. 
Irrigation 
Project 
160  1995 M/s.Mysore Const ruction 
Co., Bangalore. 
 
70 Pre‐Tender services for 
Substations for MSEB. 
Maharashtra. 
 
132 kV  900  1994 M/s. GEPC, Bangalore. 

  
Pre‐Tender Services 
66 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project Cost 
in Rs. Lakhs 
Year  Clients 
71 Pre‐Tender services for 
connected civil works of 
Substations at Meerut and 
Mandola for PGID. New 
Delhi. 
400 kV/220 
kV 
600  1994 M/s. GEPC, Bangalore. 
 
72 Bhima Lift Irrigation Project, 
Gulbarga District, Karnataka. 
Irrigation 
Project 
22000   M/s. Gammon India Ltd., 
Mumbai. 
  

  
Due Diligence Report 
67 
F. Due Diligence Report‐Completed   
 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
1 Technical Apprisal Report 
for Palloli MHS –River 
Gurpur. 
2 x 2.5  2000  2011  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 
2 Technical Apprisal Report 
for Alehalli MHS‐River 
Bhadra 
2 x 2.5  2000  2011  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 
3 Technical Apprisal Report 
for Shiragola MHS‐River 
Bhadra, Shimoga District, 
Karnataka. 
3  1500  2011  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 
 
4 Technical Apprisal Report 
for Kuskal MHS –River 
Bhadra, Shimoga Di
strict, 
Karnataka. 
2 x 2.5  2000  2011  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 
5 Technical Apprisal Report 
for Jaladurga MHS‐River 
Tunga, Hospet, Bellary 
District, Karnataka. 
3  1500  2011  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 
6 Technical Apprisal Report 
for Kantamangala  –River 
Payaswini,Puttur District, 
Karnataka. 
4.5  22500  2011  M/s. Greenko E
 
Pvt Ltd., Hyderabad. 
7 Updating of Financials DPR 
for Magundi MHS 
2 x 4.5  5200  2011 M/s. Continen tal Energy 
Services Pvt Ltd., 
Hyderabad. 
8 Concept report for Water 
Recovery from Slime Pond 
at JSW Hosepet, Bellary 
District, Karnataka. 
—  —  2010  M/s. Kelsatek Solutions 
Pvt Ltd., Bangalore. 
9 Chunchi Doddi MH
S, 
Bangalore Rural District, 
Karnataka. 
3 x 3.559  4800  2010  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 

  
Due Diligence Report 
68 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
10 Bhadra Left Bank Canal 
MHS, Shimoga District, 
Karnataka. 
1 x 1.5  1051  2010  M/s. Shree Matha 
Vaishnavi Infra‐Build Pvt 
Ltd., Mysore. 
11 Jalkoti SHEP in Himachal 
Pradesh. 
2 x 6.25  10400  2010 M/s. Prajwal Energy Pvt 
Ltd., Mumbai 
12 Hemavathy MHS, 
a) Left Bank Power 
House 
b) River Bed Power 
House 
Hassan District, Karnataka 
 
4 x 4 
 
2 x 4 
 
8000 
 
 
 
 
4000 
2010  M/s. Greenko Energies 
Pvt Ltd., Hyderabad. 
13 Hi
 Chamunda SHEP 
in Himachal Pradesh. 
2 x 4.75  8000  2010 M/s. Prajwal Energy Pvt 
Ltd., Mumbai 
14 Dadupur MHS, near 
Dadupur, Harayana. 
4 x 4  6400  2010  M/s.Bhoruka Power 
Corporation Pvt Ltd., 
Bangalore. 
15 Techno‐Economical 
Viability Study on DPR of 
Dikku HEP, Nagaland. 
165  110000  2010  M/s. Saraswathi Power 
Co Lt
d., Hyderabad. 
16 Somavathi  MHS, 
Chikkamagalur District, 
Karnataka. 
2 x 3  2963.65  2010  M/s. Velankani 
Renewable Energy Pvt 
Ltd.,Bangalore. 
17 Technical Review Report 
for Ch aya Bhagawati SHP, 
Karnataka. 
4 x 6  12000  2009  M/s.Bhoruka Power 
Corporation Pvt Ltd., 
Bangalore. 
18 Due Diligence report for 
Sarju I MHS, Bageshwar 
Uttarakhand. 
7.
5  5300  2009 M/s. Hemavathy Power 
& Light Pvt Ltd., 
Bangalore. 
19 Sarju II MHS, Bageshwar 
Uttarakhand 
15  10500  2009 M/s. Hemavathy Power 
& Light Pvt Ltd., 
Bangalore. 
 
20 Sarju III MHS, Bageshwar 
Uttarakhand 
10.5  7500  2009 M/s. Hemavathy Power 
& Light Pvt Ltd., 
Bangalore. 

  
Due Diligence Report 
69 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
21 Upper Sethi HEP, Nepal. 
 
127  100000  2009  M/s. Venika Hydro 
Projects Pvt. Ltd., 
Bangalore. 
22 Upper Modi HEP, Nepal.  30  30000  2009  M/s Maytas Infra Ltd., 
Hyderabad. 
23 Paudital Lassa SHP near 
Roharu Town in Himachal 
Pradesh. 
24  12600  2008  M/s. Tulajaa Bhavani 
Energy Projects Pvt Ltd., 
Mumbai. 
24 Palor‐I MHS near village 
Lana Palor Sangarh Taluk, 
Simor District, Himachal 
Pradesh 
2 x 1.5  130
0  2008  M/s. Tulajaa Bhavani 
Energy Projects Pvt Ltd., 
Mumbai. 
 
25 Palor‐II MHS near village 
Lana Palor Sangarh Taluk, 
Simor District, Himachal 
Pradesh. 
2 x 2.25  1306  2008  M/s. Tulajaa Bhavani 
Energy Projects Pvt Ltd., 
Mumbai. 
 
26 Gundiadka SHPP, Dakshin 
Kannada  District, 
Karnataka. 
2 x 3.5  1925  2007  M/s. Su
 Technics  Pvt 
Ltd., Bangalore. 
27 Burhi Gandaki HEP, Nepal  4 x 150  227618  2007  M/s. GMR Energy Ltd., 
New Delhi. 
28 Augmentation of water 
supply to Mangalore City. 
Dakshina Kannada District, 
Karnataka. 
Water 
Supply 
3940  2007  M/s. Mangalore City 
Corporation, Mangalore 
Karnataka. 
29 Kubjanadi MHS, near 
Coondapura, Karnataka. 
2 x 2  160
0  2007  M/s.PSR Hydro Energy 
Pvt. Ltd., Bangalore. 
30 Marigundihole MHS, near 
Kadaba, Chikkamagalur 
District, Karnataka. 
2 x 1.5  1250  2007  M/s.PSR Hydro Energy 
Pvt. Ltd., Bangalore. 
31 Venurhole MHS, near 
Moodabidri,  Dakshina 
Kannada District Karnataka 
2 x 2.5  2000  2007  M/s.PSR Hydro Energy 
Pvt. Ltd., Bangalore. 
32 Manchikere MH
S, near 
Yellapura,Uttara  Kannada 
District, Karnataka. 
2 x 8.25  8000  2007  M/s.PSR Hydro Energy 
Pvt. Ltd., Bangalore. 

  
Due Diligence Report 
70 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
33 Techno‐Economical 
viability Study for Hanol‐
Tiuni in Uttranchal. 
100  60000  2007  M/s. Sunflag Iron and 
Steel Co Ltd., New Delhi. 
34 Baliyantrahole  MHS, 
Kodagu District, Karnataka. 
2 x 1  800  2007 M/s.Kodagu Power Pvt. 
Ltd., Bangalore. 
35 Middle Kolab SHP, Orissa.  3 x 6  9000  2006  M/s.Meenahshi Power 
Ltd., Hyderabad. 
36 Review of Hydrology and 
Power Potential for Dik‐
Chu HEP in Sikkim 
2 x 48  80000  2006  M/s. Indu Projects Lt
 
Hyderabad. 
37 Samal HEP near Kule 
village Angul District, 
Orissa. 
5 x 4  10000  2006  M/s.. KSK Energy 
Ventures Ltd., 
Hyderabad. 
38 Techno‐Economical 
viability study for Bajoli 
Holi Project near Holi 
village, Himachal Pradesh. 
180  108000  2006  M/s. Simplex 
Infrastructures Ltd., 
Mumbai. 
 
39 Techno‐Economical 
viability study for D
 
HEP, Arunachal Pradesh. 
95  60000  2006 M/s..Sunflag Iron & Steel 
Co.Ltd.,  New Delhi 
 
40 Kuthupuzha MHS in 
Kodugu  District, 
Karnataka. 
2 x 2  200  2005  M/s. Raphidiam Power 
Supplies Pvt Ltd., 
Madikere 
41 Technical appraisal on 
Bharmour HEP in 
Himachal Pradesh. 
80  34700  2005  M/s. Nagarjuna Hydro 
Energy Pvt Lt
 
Hyderabad. 
42 Preliminary Assessment of 
Power Potential for 
Machgunda  MHS, 
Shalipura Branch Canal 1 & 
2, Karnataka. 
 
650 
 
600 
200 
 
200 
2005  M/s. Rahmhita Power 
Project Pvt Ltd., 
Hyderabad. 
43 Kelagur MHS Kodagu 
District, Karnataka. 
2 x 2  1600  2005 M/s Karnataka  Strips Pvt. 
Ltd., Bangalore. 
44 Study of Po
 Potential in 
Netravati Basin Western 
Ghats, Karnataka. 
—  —  2004 M/s. NTPC Hydro Ltd., 
Noida, NCR New Delhi. 

  
Due Diligence Report 
71 
Sl. 
No. 
Name of the Project  Installed 
Capacity in 
MW 
Project 
Cost in Rs. 
Lakhs 
Year  Clients 
45. Project Appraisal for 40MW 
Biomass based Thermal 
Power Plant in Andhra 
Pradesh. 
40  20000  2004  M/s. Alpha Energy 
System Ltd., Chennai 
Tamil Nadu. 
46. Techno‐Economical 
Viability Study on DPR 
Jorthrang Loop HEP 
Sikkim. 
2 x 48  65000  2004  M/s. Nagarjuna hydro 
Energy Pvt Ltd., 
Hyderabad. 
 

Certificate 
72 
 

Certificate 
73 
 

Certificate 
74 
 
 
 
 

Certificate 
75 
 
  
 
   
 

Certificate 
76 
 
 
 
 
 

Certificate 
77 
 
 
 
 
 

Certificate 
78 
 
 
 
 
 
  

Certificate 
79 
 
 
 
  
 

Certificate 
80 
 
 
 
  

Certificate 
81 
 
 
 
  

Certificate 
82 
 
 
 
  

Certificate 
83 
 
 
  
 
   
  

Certificate 
84 
 
 
 
   

Certificate 
85 
  
 
 
 
 
  

Certificate 
86 
 
 
 
  

Certificate 
87 
 
 
 
 
  

Certificate 
88 
 

Advisor 
89 

13. Brief Profile of Advisors / Consultants

(a) Advisors 
 
Mr. H.V. Eswaraiah, is retired from Karnataka  Power Corporation Limited, working as 
freelance Consultants for large Hydro Power Project.  Design Group is availing his 
technical expertise  on implementation of Hydro Power Project related to contracts, 
QAC, PMC etc. 
 
Mr. H.V. Eswaraiah, after his Masters degree from renowned Indian In
 of Science, 
had a brief stints  as lecturer, worked in State Public Works Department before joining 
Karnataka Power Corporation Limited, as Assistant Executive Engineer in the year 1971, 
and retired as Technical Director in the year 1997.  He has extensively dealt with all 
aspects of Hydro Power Projects, starting from fie
 investigation, preparation of PFR, 
DPRs, Bid preparation, technical evaluation, award of work, as Executive Engineer, he 
has worked on  a 100m high Supa Concrete gravity Dam, achieved production level of 
1000 cumecs per day of concreting production and laying in the design.  At corporate 
level, in charge of long te
 Power Project Planning, advising Managing Director, on 
settlements  of dispute and claims of contracts, direct monitoring of  all Projects under 
construction, procurement and movement of Coal, Cement and Steel.  In his tenure, he 
has handled 15 Hydro Power Projects including a Thermal and Wind Projects.  He had 
wide experience  in de
 with World Bank Funded Projects. 
 
After his retirements, he was appointed by NTPC for Koll dam (700 MW) as advisor.  He 
is also assisting Banks as Lender Engineers for various Mini Hydel Scheme  funded by 
Banks. 

Advisor 
90 
 
Mr. Shankar V. Nesargi, B.E. (Mech), ME (WR), Joined Karnataka  Power Corporation 
Limited, as an Engineer in the year 1970 and retired as Managing Director of VVNL, 
subsidiary Company of KPCL in the year 2005.  As an Assistant Engineer handled 
investigation works of Kali Hydro Electric Project ( 6 x 135 MW
 including drift works. 
Incharge Executive Engineer for construction, O & M of 4 x 210  MW  
Raichur Thermal Power Plant, he had extensive  explosure  to Coal Plant, Railways, WTP, 
Boiler,  Turbines etc.  During this period, he was elevated, as Superintending / Chief 
Engineer.  In the year 2003, he was a
 as Executive Director totally incharge of 
Planning Infrastructure works of 4 x 350 MW, Bidadi Gas Based Power Plant, near 
Bangalore.  Subsequently, he was appointed, as Managing Director, Vishveswaraiah 
Vidyuth Nigama Ltd., incharge of O & M, of 600 MW Hydro Power Project including R 
& M works.  During his te
 in KPCL, he has attended several National and 
International Seminar and travel world wide. 
 
After retirement he was a freelance  consultant to various foreign Companies in Uganda, 
Spain etc., traveled extensively in these countries as technical consultants. 
 
Presently, he works as a Managing Director of DB Global Energy Lim
 a Company 
dedicated to Wind Power Generation as IPPs, executing 100 MW of Windfarm near 
Belgaum, Karnataka. 
 
 

Advisor 
91

 
Mr. P.R. Balasubramanian, after obtaining Bachelor degree in Mechanical Engineer, had 
one year training in Nuclear and Allied subjects  in Bhabha Automic Research Centre, 
Bombay.  Thereafter, he was absorbed in the department worked for a decade in various 
departments of BARC, before joining Engineers India Limited, New Delhi in the year 
1978.  Th
ereafter joined Gas Authority of India Limited and worked till 1990.  He was 
selected, as Director in Neyveli Lignite Corporation Ltd, in 1997.  He was Chairman / 
Managing Director of Fertiliser and chemicals, Travancore up to his retirement in the 
year 2002. 
 
He is a freelance  consultant, presently  independent Di
rector of REC, India Rare Earth 
Ltd., (Department of Atomic Energy). 
 
His areas of expertise  is overall Corporate Management of Large Organisations, 
Development of Engineering Expertise in the Organisation, Conceptualising of Turn 
Around strategies, over view the implementation of the Projects from Concept to 
Commissioning, preparation of quality Project Reports, Pr
 appraising of the Project 
Reports, Resolving Arbitration Issues etc., by applying the expertise  and experience  in 
managing  various projects in Nuclear Chemicals, Fine Chemicals, Petrochemicals, 
Hydrocarbons, Gas Processing Plants, Cross Country Pipelines, Thermal power plants,
Fertilizer Complexes etc.

Advisor 
92

Mr. B.V. Ramakrishnaiah, hydraulic Gates Consultants, was ranked 4
th
 in Bachelor of 
Engineer, and passed M.E. in distinction from India’s premier Institution namely Indian 
Institute of Science, Bangalore, in the year 1964.  He joined CW& PC, New Delhi, soon 
after his Master degree in the year 1962, worked mainly in design and drawing of 
Hydraulic Gates for Irrigation and Hydro Po
 Projects.  In the year 1966 joined M/s. 
Triveni Structurals Ltd., Naini, Allahabad, served over 13 years in the organization, as 
Gates and Penstock design specialist.  During his tenure, he has designed  cylinder Gates 
for Ramanaganga Project, which is only one of its kind in the country, operated by a 70 
to
nnes capacity Hydraulic hoist. Another gate operated by 650 tonnes capacity 
Hydraulic hoist is designed, as High Pressure slide gates, for Baggi control works, 
Sundernagar, Himachan Pradesh, High Pressure fixed wheel Penstock emergency gate 
was designed  for Beas Project, Punjab for a clear vent size of 10 feet x 21 f
 for a 
design head of 110m.  This gate carries a total load of 2160 tonnes which is transferred to 
concrete through 12 wheels, 150 tonnes capacity hydraulic hoist  operates the gate.  Crest 
radial gates for Itezhitezhi Dam, Zambia, has been designed which was vetted by 
SWECC Swedan.  Similarly, Batten ou
 radial gates had been designed for Great 
Reeha Power Project Tanzania. 
 
He resigned M/s. Triveni Structurals Ltd., in the year 1979, to start his own consultancy 
firm, where he has designed over 100 gates of various shapes  and sizes.  To name a few, 
designed  18.288m x 17.145m spillway radial gates fo
 Srisailam Hydro Electric Project in 
Andhra Pradesh, first time spherical plain bearings were used for the Tirunion instead 
of normal bronze bushes.  Designed one of the tallest Penstock gate of size 6.75m x 
15.75m in the country, for Lower Metur Project in Mettur Tamilnadu. 
 
As regards Penstocks, Pipes, 2.743m dia fo
 a static head of 405m was designed  for 
Kaufe Gorge HEP in Tambia Africa, 4.88m dia to withstand static head of 51.2m was 
designed  for Bowatena Power Project in Sri Lanka.  He has distinction of designing 
record breaking gate size and penstocks of large diameter in India.  He is ra
 as a top 
class gate designer in India. 

Advisor 
93 
Mr. V. Balachandran, is a retired, Deputy Director General and HOD GSI, Southern 
Region. He is a freelance  senior Geologist advising Design Group on Engineering 
Geology for Large Hydro and Irrigation Projects in India and Abroad. Presently 
pursuing his doctoral thesis in Osmania University. 
 
Mr. V. Balachandran, after Masters’ degree in G
 joined Geology Survey of India in 
the year 1971, as Junior Geologist and retired, as Deputy Director General and HOD, 
GIS, Southern Region. Out of 36 years of experience in the fields of Geology, 30 years is 
spent in Engineering Geology, involved in conducting Preliminary Investigation to post 
construction st
 his services  spread all over India, including Supervision and 
guidance to Project Authorities. A few Projects where he was directly involved are : 
facilitated smooth negotiation, Chibro Khodri Hydro Power Project tunnel between two 
regional thrusts. Facilitated smooth negotiation of twin tunnels of Khan Hydel Scheme, 
upto upper Siwalik incoherent sa
nd rock with plethora of problems such as seepage, 
collapse and daylighting of the tunnel. Selection of Dam site for 230m high rockfill dam 
project which was under investigation for a protracted period (40 years). By identifying 
source of seepage  at Kadampari Pumped storage scheme, the energy generation was 
substantially e
 Adopted hydraulic jacking of upper Kodayan tunnel and 
suggested other remedial measure. Geological investigation was extensively carried at 
MAPS Kalpakkam and Kundankulam for Nuclear Power Corporation Ltd., Extensive 
field services were carried out with special reference to Seismological studies  led to 
clearance for Kundakulam Atomic Power Plant. Initiated studies  on Kor
 Atomic 
Power Plant and studies  on Plutonium Fast Breeder Reactor Project under Madras 
Nuclear Power Plant leading to clearance to the Project. Carried out Mega thrust 
Tsunami Hazard studies  in South India. Attended several National and International 
seminars, and presented several technical papers, Traveller World Wide, including 
undergoing training in Ha
 Engineering, USA and National Resources (Canada) and 
Geological Survey of Canada at Vancouver Calgary and Ottawan Canada. 

Advisor 
94 
C.R. Venkatesh B.E. (Civil), M.E. (Str), obtained first class with distinction in Masters’ 
degree, from the renowned Indian Institute of Science, Bangalore.  He worked, as 
lecturer in Engineering Colleges, Assistant Residential Officer, CWPRS (Poona, Scientist 
Cement Research Institute of India, New Delhi, before joining National Hydro Power 
Corporation Ltd., as Manager in th
 year 1981, worked till his retirement in the year 
2004.  During his tenure in NHPC Ltd., he has risen from the post of Manager upto 
Executive Director.  As a Chief Engineer, he was in charge of Dulhasti Hydro Power 
Project (3 x 130 MW).  As an Executive Director, Contract Di
vision, managed all 
procurement activities and Civil E & M Works Contracts.  Under R & D wing, he has 
evolved cost analysis of complicated works, suggested various means for cost cutting.  
He was trained in detailed structural analysis of Chamber Concrete Dam in Canada; in 
Sweden, under went Advanced International Hy
 Power Develop Project; in 
Germany / Netherland attended Advanced Management Development Training. 
 
In India, under went specialized technical training in Reflection Photo elasticity and 
strain gauge technique,  Dam Safety, Geotechnical instrumentation etc.  He has visited 
number of Foreign Countries. Deputed to Pakistan, participated in technical discussions, 
on Indus Watering Tr
 Had meeting with Arbitrators in connection with Internal 
Arbitration Tribunal on Chamera  HEP Contract disputes.  He has 44 technical papers to 
his credit.  His research paper on De‐silting basin, won a special Certificate of merit by 
Central Board of Irrigation and Power, New Delhi. 
 
Since, his retirement, his se
 as freelance consultant is being used by major Civil 
Contractors for dispute redressal and Arbitration. 

Advisor 
95

Mr. M.C. Rangarajan,  is a free lance Electrical Engineering Consultant for various 
organisation including M/s. Design Group Project Consultants Pvt Ltd. 
 
Mr. M.C. Rangarajan, after obtaining Bachelor of Engineer degree from Indian 
Institute of Science, in the year 1969,  joined Karnataka  Power Corporation as 
Electrical Engineer, and retired in the ye
 2005,  after 36 years of rich in 
experience  Hydro Power generation. Important assignment to name as Design 
and Layout of Hydro and Thermal Projects sizing of units, firming up of 
technical specification, bid documents, bid processing, contract management, 
project monitoring, inspection of components, Vendors Plant. He was involved 
in construction of fo
llowing Hydro Projects to name a few, Nagjhani (6 x 135 
MW) Supa Dam Power House (2 x 50 MW), Gerusoppa Dam Power House (4 x 
60 MW), Kadra Dam Power House (3 x 50 MW), and Kodasalli Dam Power 
House (3 x 40 MW). In addition looked after O & M of S
haravathy HEP (1035 
MW), Varahi underground Power House (230 MW),  R & M works etc. 
 
As a senior executive  Chairman of Core group for Q & AC of EPC Contract for 
500 MW Bellary Thermal Power Plant, Power Purchase  agreement with State 
level  distribution Companies.  He has p
 several technical papers in 
National and International Conference; visited difference type of Power Houses 
and manufacturer units in India and Abroad. 

Advisor 
96

 
S. Ramanan, B.E. (Civil), worked in Karnataka Power Corporation Limited between 1975 
to 1984, after a brief stinct, as lecture in NIE Mysore.  Joined NHPC, in the year 1985, and 
retired in the year 2009, as General Manager. 
 
He had an exposure  in all branches of Hydro Power Project, from Su
 Investigation, 
Preparation of PFRs and DPRs, bid documents, to Civil designs, construction of HEPs.  
He was past as GM Consulting and Bussiness Development Division, dealt with Tidal 
Power Project, Infrastructure  development in Andaman and Nicobar Island, Varzab 
Power Plant in Tajikistan and raising of Dhankari dam in Port Blair, Andaman an

Nicobar Island.  Till his retirement, he had handled over 5000 MW of Hydro Power 
development in various capacities sparing across the length and breadth of India for 10 
HEPs in total.  He had a short stint in design and engineering of Power transmission line 
in North East State.  He is a f
  consultant advising various IPPs in 
implementation of small Hydro Projects. 

Advisor 
97 
 
Mr. Umashankar, is an advisor on design and drawing of large span roof trusses used in 
Power Plants, and complicated heavily loaded structural steel works. Presently advisor 
to Design Group. 
 
Mr. Umashankar joined MECON Ltd., in the year 1973, as steel structural engineer and 
retired in the year 2009, as De
 General Manager. As a steel structural designer, he 
was actively involved in design of Steel Plants of large capacity in India, such as Bokaro 
Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant 
in Kerala, Defence Project – NSTL at Vizag A.P., Kudremukh Iron Ore Project, Essar 
St
eel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external 
Coal handling system for TNEB at Chennai, Birla Copper expansion phase II. HGPL – 
Expansion at Vizag A.P. Defence Project – Sea bird at Karwar, West Coasts of Karnataka, 
Essar Integrated Steel Plant at Hazira. More than half m
 tones of Steel design and 
fabrication of steel structure has been done under his guidance. He has been deputed  to 
foreign countries by MECON for inspection and fabrication in Countries like China, 
Germany, Korea, he has also attended several work shops  conducted in India and 
Abroad. 

Advisor 
98

 
Mr. V. Narayanan, is a transmission line design and construction expert.  Advisor to 
Design Group on assignments pertaining to transmission lines, as and when required. 
 
After his Bachelor degree in Civil Engineering, obtained Masters degree in Civil and 
Hydraulic Engineering from India foremost Indian Institute of Science, Bangalore, in the 
ye
ar 1963.  soon after joined M/s. SAE (India) Ltd., as Design Engineer for transmission 
Tower, Civil Foundation and other allied works.  He has involved designs and drawings 
for various voltages from 66 kV to 220 kV to many Electricity Boards in India. 
 
Subsequently 1973 onwards assumed the change of Production Ma
 in M/s. SAE 
Factory  at Jabalpur.  He was deputed  to M/s. SAE, Milano, for being trained in their 
works at Lecco, on production engineering, design and drawings, Testing Stations.  In 
the year 1978 was sent to Australia to acquaint with the working of Testing Station.  At 
Jabalpur Plant, made a co
 viable Testing Station in par with International 
Testing Station.  He was responsible for increasing the production capacity to 30,000  MT 
per annum from 8000 MT.  As a General Manager responsible for design and testing of 
many 400 kV and 500 kV DC lines.  After his retirement worked in several In
 
Companies, such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc.  He has wide 
technical knowledge in Transmission lines from concept to commissioning. 

Advisor 
99 

 
Mr. C. Channakeshava, Ph.D, is an freelance  advisor to Design Group on Computer aided 
Mathematical modeling for 3D complicated structures  for carrying out precision analysis 
and design of Dams etc. 
 
Mr. C. Channakeshava, after his post graduation in M.E., from renowned Indian Institute of 
Science, Bangalore, obtain his Ph.D in th
 same Institution in the year 1988.  He was Post 
Doctral Research Associates in University of Cincinnati Ohio, USA, Louisiana  State 
University, USA, extensively worked on Finite Element Method applied to Civil 
Engineering works.  He has illustrious academic background, topper in Universities in India 
and Abroad. 
 
In Bangalore, joined a re
 EMRC Software  Company (USA)  team to develop world 
class NISA Software  tool used extensively for Non‐linear analysis.  His field of interests are 
computational mechanics, Finite Element Analysis, Boundary Element Analysis, Analysis 
and Design of RCC & Steel Structurals, Roads and Bridges, Computer Aided Design. 
 

Advisor
100
 
Mr. Shridhar Prabhu, freelance Solicitor specialize in Energy Law Audit and Regulatory 
Affairs and Compliance. Design Group is availing in services  in PPA related matter. 
 
Mr. Shridhar Prabhu, after obtaining degree in law, started practicing in High Court of 
Karnataka, enrolled in Delhi Bar Council. As a specialist in Regulatory Appraise re
lated 
to energy, he was nominated, as Vice Chairman, Energy Committee of the Federation of 
Karnataka Chamber of Commerce  and Industries, Advisor to India Wind Turbine 
Manufacturers Association. Advisor Renewable Energy Developer Association, 
Karnataka (REDAK). Former State Council Member – IWPA, in addition during his 
practice, he has represented India’s Wi
 Energy Sector, before the Supreme  Court; first 
and only representative  of the Wind Energy Sector to represent before the Central 
Electricity Regulatory Commission (CERC), New Delhi. Represented, on several 
occasions, on behalf of IPP’s, he has argued before REC’S on fixation of Tariff, 
standardization of PPA’s renewable Power Purchase obligations fo
r Wind Project. 
 
Envisaged  a theme paper and chalked out action plans for NASDAQ listed IT Services 
Company with a market capitalization of over US$ 30 Billion for Green Power 
procurements in Southern States. Engaged for advisory and tariff filing by first ever 
electric cooperative society and distribution license in Kar
 

Advisor 
101 
Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers 
on environmental and sustainable Development Areas including climate change and 
CDM aspects etc., Design Group seek his advice on specific field like Environmental 
impact assessment, CDM due diligence and Environmental Protection project. 
 
Mr. Srinath N. Anekal after o
 Bachelor / Master degrees in Civil Engineer from 
Bangalore University pursued higher studies in University of Florida, Gainsville, USA, 
was awarded Master degrees in Environmental Engineering Science  in the year 1993.  
Under gone, short term course in Finance for Non‐finance Managers IIM Bangalore, ISO 
14000  Environmental Management System CI
 India, hazardous waste management 
operational practice, USA.  He has traveled widely in USA, Inida, Banglaesh, Maruitius 
and Mozambique.  Where he worked extensively in the field of Environment, Energy 
and Water.  He demonstrated experience  in conceptualizing, design, promoting and 
implementing innovative projects in the area of waste minimization, clean Technologies, 
Environmental p
rotection, Urban Water Supply  and sanitation, Renewable Energy and 
clean Development Mechanism.  He was with executing Agencies for implementing 
reform oriented projects funded by world Bank, DflD, KfW, European Commission and 
Danida.  He has contributed to the development of country level strategies; especially on 
mainstream new development concepts, through conduct an
 participation in seminars 
and workshops and effective interaction with all stake holders in Government, Non‐
Governmental Organization and Private Sectors. 

Consultant 
102

(b) Consultants 
 
 Mr. C.S. Hebli, B.E. (Hons), after obtaining Bachelor degree in Civil Engineer with 
distinction, joined Bombay public works Department, in the year 1954, worked as Junior 
Engineer Planning Minor Irrigation Project, after reorganization of Karnataka  state, his 
services  were lent to Hydro Electrical  Civil Projects in the year 1959
 as Assistant 
Executive Engineer, involved in investigation and preparation of Bedthi, Aghanashini, 
Mahadayi, Kalinadi  (910 MW) Projects.  HECP was converted into a dedicated power 
generation company called Karnataka Power Corporation Limited, fully owned by 
Government of Karnataka  to execute.  He raised from ranks upto first Technical Director 
of the Company, re
tired in the year 1988 with 37 years of rich power project experience.  
During his service, activity involved in Kalinadi  HEP (910 mw), Sharavathi HEP (835 
MW), Varahi HEP (239 MW).  Raichur TPS (5 X 210 MW) from concept to completion, 
involved in long term planning of Projects, Hydro policy in th
 state etc.  After 
retirement worked with Thapar Hydro Council, as consultant dealt with several Hydro 
and Gas based Power Plant aggregating to 2000  MW,  joined as Chairman, Design 
Group Project Consultants Pvt Ltd., Company established in 1979, technically guiding 
staff  strength of 52 technocrates effectively involved in technical advise.  P
 
decisions, Company affairs etc. 

Consultant 
103

Mr. B.L. Lakshminarasimha,  B.Sc.,  B.E.,  M.E., M.I.E., F.I.V., M.A.S.C.E.,  after 
obtaining Master degree  in Civil Engineer from Birla Institute of 
Technology,  Pilani, premier educational Institution of India 
(collaboration with M.I.T., USA,) after a short stint in Messers. Gerame 
and Binny Limited, joined Karnataka Power Corporation Limited,  as a Civil Engineer in 
1975, resigned after 20 years of  service,  acquired technical knowledge in drafting of bid 
documents fo
r large Hydro Power Projects,  interpretation of Contract Clauses, resolved 
disputes,  formulated schedule of rates, design of Surface Power House, framed structure 
through 3 D modeling  etc. Designed and constructed KPCL  Corporate office building.  
Assisted Company’s legal advisors in Arbitration proceeding/Contract disputes,  in the 
Court of Law etc Founder member Design Group, established in 1
979.  What turned out 
to be one man show in 1979 has grown to a large consultancy  firm of repute  in India and 
Abroad.  Over 3 decades of existence, developed  an exclusive team of dedicated 
consultants having 40 years and above experience in Powe
r and Irrigation Projects  from 
concept to completion. 
 
Recently developed  a dedicated team of engineers to extend design engineering  services 
in Water and Waste Water Treatment  Plants. Successfully steered the company in 
obtaining KEMA ISO Certification, maintained consistent profitability over the decades.  
Executed number of Joint Venture Partnership in India and Abroad
, such as CPRI, 
WAPCOS, ILF, for implementation of Large Projects successfully, signed a few design 
engineering  assignment  contract in neighbouring countries  such as, Saudi Arabia, 
Dubai, Muscat,  Ghana, Nepal, Sri Lanka. 
 
 
 
 

Consultant 
104 
 
Mr. P.R. Mallikarjuna, after obtaining M.E., from prestigious Indian 
Institute of Science  in the year 1969, worked in various capacities in a 
Public Sector / Private Companies, before joining Karnataka Power 
Corporation in the year 1971, as Group Engineer (AEE), and retired in 
the year 2000  as Technical Director, with an illu
 career spanning 34 years in 
various cadres. He was one of the Board of Directors of KPC Limited, for over 7 years, 
after his retirement. During his tenure in the KPCL, he was the head of Design wing and 
handled all major Hydro Projects, Thermal Power Plants from concept to 
c
ommissioning. Over 1200  MW of Power Projects has been investigated under his 
guidance and about 2000 MW of Power Projects has been designed. Further, 900 MW of 
Power Projects have been implemented under his guidance. He has attended several 
National and International seminars, and contributed dozens of technical papers. After 
hi
s retirement, he was involved in the preparation of revised DPR for 12 X 80 MW Indira 
Sagar Polavaram Hydro Electric Project in Andhra Pradesh, on behalf of Andhra 
Pradesh Irrigation Department, including obtaining clearances from Central Electricity 
Authorities, New Delhi. He was involved in detailed engineering of Nagarjuna Sagar 
Ta
il Pond dam Power House (2 x 25 MW) and Varahi underground Power house – Stage 
II (2 x 115 MW). 
 
 From 2008 onwards, he heads the Civil Design wing of DGPCPL and is responsible for 
planning and design of Hydro Electric Projects and Large Irrigation Projects, etc. 

 
Consultant 
105 
 
Mr. P.K. Rupangudi, after obtaining M.E., from prestigious University 
College of Engineering, Bangalore in the year 1971 worked in State 
Government Organisation, before joining Karnataka Power 
Corporation in the year 1972 as Engineer and retired in the year 2004 
as Chief Engineer with an illustrateous carrier spanning 32 years in 
various ca
 During his tenure in the KPCL, he was head of Design wing consisting 
of engineers of all discipline, handled all major Hydro, Thermal Power Plants from 
concept to completion. Attended several National and International  seminars, and 
contributed several technical papers. He is member of Gate Committee since 1996, 
formed by th
 Govt. of Karnataka  for design, fabrication erection & commissioning of 
prestigious Alamatti Dam Gates and hoists. Even to date, he is in the panel for 
inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty 
member on the continuing education to the Engineers of the State, or
 by The 
Director, KERS – Mysore. He is the main author of History of Lingamakki & Talalakalale 
dams, of Sharavati Hydel Scheme assigned to him by the Karnataka  Power Corporation. 
After his retirement, he was also involved in detailed engineering of Nagarjuna Sagar 
tail pond Dam and Varahi underground Po
 House – Stage II (2 x 115 MW) and a 
major weir for Lower Jurala H.E.P of Andhra Pradesh Power Generation  Company.  
 
From 2010 onwards he is associated with DG responsible for implementation of Hydro 
Electric and Irrigation Projects.  

Consultant 
106

Mr. Chikkaguddappa (C.G. Appa), joined Design Group Project 
Consultants Pvt Ltd., in 2005, as a Director Hydro Power Project 
Planning and river  basin study.  He has travelled neighbouring 
countries, to advice IPP’s on Planning of Hydro Power Project. 
 
Mr. Chikkaguddappa (C.G. Appa), joined Karnataka  Power Corporation Limited in the 
year 1973, as an E
ngineer, raised to the level and retired in the year 2005, from 
Corporation after 38 years of long services.  From the day one, he was involved in river 
basin development in the Corporation, identifying and Planning Hydro Power Projects 
in entire  length and breadth of Karnataka  state.  Mostly d
 with Investigation of 
HEP’s  like Shivana  Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti 
Stage I HEP, from 1984, as a Assistant Executive Engineer, he was involved in field data 
collection for Hydrology, surface and sub‐surface details for preparation of DPR for 
major HEP’s  lik
 MahadayI (318 MW),  Cauvery Scheme  (270 MW), Tamankal (800 
MW), Almati Dam Power House (280 MW),  (Mekedath 1400 MW), Kali stage – III (1200 
MW) Bedsti stage II (400 MW), Aghanashini (600 MW), Gundiya High heads scheme 
(400) conceived if, as a run of the river  scheme, study proposed fo
 Pumped storage 
scheme at the existing Sharavathy complex (1000  MW) AND Kali Complex (1200  MW). 
He was one of the Authorities in river basin studies in Karnataka.  In addition, identified 
and prepared DPR’s for Mini Hydel Scheme  of less than 25 MW. 
 
He joined Design Group Project Consultants Pvt Lt
 in the year 2005, responsible for 
identifying and preparation of Desk Study Report for over 12,000  MW of Hydro Power 
Projects in neighbouring Country Nepal. 
 

Consultant 
107 
 
Mr. Raghavendra  Rao H after obtaining BE degree in Electrical 
Engineering from National Institute of Engineering, Mysore in the 
yarer 1972  worked in Medium Voltage Switch Gear industry as 
development and production Engineer till 1977  before joining 
Karnataka Power Corporation Ltd, the premier organization carrying out design, 
construction, operation and maintenance of po
wer plants in the state of Karnataka,. He 
retired as Superintendent Engineer (Electrical) from KPCL in the year 2006. During his 
tenure in KPCL he worked in the areas of design, construction, testing and commissioning 
and maintenance of Hydro and Thermal power plants mainly in the areas of Electrical 
eq
uipments and systems  of power plants and the tenure included working at both power 
plants and the corporate design office.     
 
The specialized areas are control and protection and he was a member of Protection 
committee of Southern Regional Electricity Board.  
 
After joining DG in 2008 he is in charge of E
 of Electro Mechanical systems of 
Hydro and thermal power plants. He is an accredited energy auditor certified by Bureau of 
Energy Efficiency, India.   
 
 
 

Consultant 
108 
Mr. M.M. Reddy  is expert in substation Layout  and Electricals designs 
from 33 kV upto 400 kV. His services are being used by Design Group in 
substation segment  of Electrical Engineering. 
 
Mr. M.M. Reddy  after obtaining Bachelors’ degree  in Electrical Engineering  from 
Bangalore University, in the year 1968, worked in various capa
cities in various 
organizations.  He has worked in NGEF  from 1968  to 1997 for 29 years and taken 
voluntary  retirement  in the year 1997, as Divisional Manager. During his tenure in 
NGEF,  he was head of Sub‐station group and handled switchyards from 33 kV to 220 kV 
from designing to commissioning of sub‐stations  on EPC basis. Under his guidance

about 600 MW outdoor Switchyard from 33 kV to 220 kV have been designed and 
commissioned.  He has undergone  training in high voltage outdoor yard sub‐stations in 
AEG – Telefunken,  Germany for 6 months. 
 
In May  1997, he joined M/s. De
sign Group Project consultant Pvt Ltd.,  and he is 
responsible for designing  of out door yard substation and transmission lines. He has 
designed and commissioned various switchyards and transmission line for Hydro 
Power Project, to name a few major Projects: 
 
i) Varahi Tail Race (37 MW – 110 kV ODY) 
ii) Narayanpur Project Pha
se – I and II (18 MW ‐ 66  kV ODY) 
iii) Singatallur – Hulligudda (18 MW – 110 kV ODY) 
 
He has designed and commissioned balance of equipment for 15 MW Windmill 
Project. 
 

Consultant 
109 

Mr R. Vasudevan is a water utility management specialist with over 40 
years of experience  in Design Construction & Operation of Water 
utility services from the source to the consumer, presently  full time 
consultant of Design Group. 
 
He is a 1971Batch Graduate in Electrical  Engineering from Bangalore University. Joining 
Bangalore Water S
  and Sewerage  Board in the same year, he worked in various 
capacities and retired as the Chief Engineer during 2010. He was involved in all the 
major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million residents of 
Bangalore in 1971, and had become a giant u
 by 2010 supplying over 900 MLD 
water to over 7 Million residents. 
He was associated in Cauvery water supply  Scheme  stage I to supply  135 MLD water 
from River  Cauvery, in establishing pipe fabrication and laying activities; Later in the 
stage II of another 135 MLD Project he was in cha
 of Electrical system Design and 
Construction; In the III stage which was a larger 270 MLD Project he was in charge of 
complete Electrical  and Hydro‐Mechanical components of the project from tendering to 
completion. In the subsequent Stage IV‐Phase I Project which was with external funding, 
He wa
 responsible for total cross‐country steel pipeline of 1950mm Diameter and 90 
Kilometers long, and later in the installation of Sewerage  pumping stations  and the 
electrical Design and Construction of Seven Sewage treatment plants. In the last 5 years 
of his service he was responsible for Securing ODA loan of IN
 34000  Million from JICA 
for Stage IV Phase II projects of 500 MLD, selection of project consultants, tendering 
selection and award of contracts for all water supply  components.  
 
In the course of his service he has participated in various workshops and seminars on 
pumps , cavitation, cross‐country pipeline des
ign, water‐hammer studies and control, 
water treatment, wastewater treatment and sludge disposal, project management, 

Consultant 
110 
international  contracts,  leakage reduction and distribution improvement, flow 
measurement, tariff structuring, urban planning , reuse and conservation, etc.  
 
He led the Technical team which presented ‘Innovative Practices in Revenue 
Management’ initiative by BWSSB to the Department of Urban Development and 
Secured the First Prize in National Urban Water Awards, 2009, from th
 Hon’ble 
President of India, in August 2009. 
 
Vasudevan has designed pumping systems  for several lift irrigation pumping systems, 
electrical substations and surge protection to pipeline for the Consultancy Centre of 
BWSSB from 1995 to 2007. Many such projects have been commissioned in the last 10 
years and are in op
 
 
He also handled an assignment on ‘alternative methods of infrastructure finance by 
Private Sector, Infrastructure Bonds, and developing Public‐Private Partnerships’ in 
2009.  
 
He also secured an MBA from ICFAI  Dehradun with Finance as optional subject. On 
retirement from Service he joined Design Group as Water Supply  Consultant in 
Sep
tember 2010. 

Consultant 
111

 
 Mr. U.R. Raghotham after obtaining M.Tech from Mysore University    in 
the year 1974 worked as design engineer with the architects M/s Karekar 
and Sundaram for one year and joined Karnataka Power Corporation 
Ltd., in 1975.   
 
During the service in KPC Ltd., he has worked in the design team for Supa Da
 for 5 
years and then worked as AEE (Construction)  in Supa Dam for 7 years starting from 
foundation level of the spillway and power blocks to the completion of the Dam.   
 
Further he was in charge of construction of Ghataprabha Power House.  From 1989 
onwards he worked in the design o
 as AEE and EE for the planning and design of 
various Hydro Electric projects including Kadra dam and Sharavathi Tailrace Project.  
Since 2003, he is workin g as a consultant and was involved in the design of Nagarjuna 
Sagar Tail Pond Dam Project, Gandikota dam project, Lower Jurala project of And
 
Pradesh, Varahi Underground Power House (2x115MW) and many other projects.   He 
was involved in the preparation of DPR for Indira Sagar Polavaram   Hydro Electric 
Project (960MW) and in obtaining clearance from CWC  and CEA. 
 

Advisor 
112 
Mr. G. Penchalaiah, after retirement works as free lance Consultants, for various 
investigation agencies in flow monitoring in river regime pre‐construction Investigation 
works in large Irrigation Projects.  Design Group is utilizing his services for overseeing, 
Fielding investigation works in large Irrigation Projects in India and Abroad. 
  
Mr. G. Penchalaiah after hi
 graduation in Civil Engineering from Sri. Venkateshwara 
University in 1970, joined Central Water Commission, as Civil Engineer and retired in 
the year 2007, as Director.  He has vast experience  in Water Resources Project Planning, 
specially large Irrigation Project investigation, Hydrology, Computation of yield, 
Development of Irrigation dam and associated Ir
 Networks, preparation of 
Detailed Project Report. He was posted to various States in India, was familiar with 
available yield in various river  for Irrigation utilization to improve the Agricultural 
Sector and Water Management.  He was deputed  to CEA, New Delhi, responsible for 
design of structures  and cost estimates for Thermal Po
wer Project.  He had made topo 
map studies, interlinking river, water balance study, etc.  As a Senior Engineer worked 
on Indo‐Nepal Joint Projects, namely Pancheshwar Multipurpose Project, head quarter 
at Kathmandu, Nepal.  Involved in preparation of DPR, cost estimates, preparation of 
Infrastructure Planning for major Power / Multipurpose Projects, su
 as Poornagiri, 
Rupaligad etc. 

Consulta nt 
113


Mr. Suryanarayana, after his retirement on Deputy General Manager ‐ Geology from 
Karnataka Power Corporation Limited, works as freelance Consultant.  He is a part of 
Design Group being extensively used his expertise in Engineering Geology in various 
assignments undertaken,  on job to job basis. 
 
My. Suryanarayana, after obtaining Masters’ de gree in Geological Sc
ience, joined 
Karnataka Power Corporation Limited, as Junior Geologist and re tire d in the year 2007, 
as Deputy General Manager – Geology.  During his tenure , he was involved in most of 
the Hydro Power Project implemented by Karnataka Power Corporation Limited  in 
Karnataka, to name a few Rammam HEP (120 MW), Ro
 HEP (60 MW) and Chakung 
Cha HEP (60 MW) all in Sikkim; 80 meter high Chakra Rock‐fill Dam: Varahi HEP (460 
MW).  Involved in preparation of DPR for Gundiya Hydel Scheme (400 MW), 
Shivasamundram Seasonal Scheme (270 MW), Mekedatu Mu ltipurpose Project (360 
MW).  He is also involved in ongoing Hi
magiri HEP (280 MW), Uppe r Tun ga Irrigation 
Project in vo lve d 4 km of tunneling etc.  Apart from this , he has wide experience in 
advising develope rs / IPPs in im p le m entation of Mini Hydel Scheme of 25 MW and 
below all over India. 

Consultant 
114

Mr. K.T.Sreedhara, after obtaining B.E (Civil), degree from Vikram 
University, Ujjain, in the year 1970. worked as design Engineer in 
M/s.P.V.Raj & Co. Consulting Engineers Hyderabad from January 1971 
to November 1973. The works dealt in this period are Designs of Bridges 
and Industrial Structures and Buildings. Then joined M/s. Karnataka 
Po
wer Corporation Ltd., a  public sector undertaking of government of Karnataka  on  
28.11.1973  and worked Up to 31.01.2006  i.e. 32 years and 2 months in various capacities as 
AE, AEE, EE, SE &finally  retired as  I/C Chief Engineer on superannuation from the 
Karnataka Power Corporation service. During this tenure in KPCL wo
 in the civil 
designs wing on the design of Gravity dam (concrete), Earthen dams, water conducting 
System and in construction wing worked in Precision survey works at Varahi under ground 
Power & Varahi Schemes and Sharavathi Schemes as AEE. As Executive Engineer worked 
in the investigation of Power Project e
 High Head Scheme  and Mini Hydel 
Schemes. Further worked in designs wing in the designs of Sarpady Barrage Hydro Electric 
Project and consultancy work of Markandeya Dam Project,  Kalasa & Bandurnala 
Consultancy work. for KNNL. 
 
 Further in construction wing as Executive Engineer (Safety) at Raichur Thermal Power 
Station Shakthinagar In a
ddition to the Safety Engineering of  Raichur Thermal Power 
Station worked on deputation to KPCL civil designs wing  involved in the investigation 
work of Bridge cum Barrage Project across River  Krishna near Gugal. for KBJNL As Super 
Intending   Engineer and further I/C chief Engineer (civil) of Raichur Thermal Power St
 
(7X210  MW Installed Capacity as on 2006) involved in the civil maintenance works  of the 
Thermal  Power Generation Station. After retirement on 31/1/2006 after serving 32 for years 
with KPCL joined on 7/4/2006  as Consultant in  M/s Subhadra Consulting Engineers who 
are also Associate  Consultants to M/s STUP consultants Pvt Lt
 Bangalore and worked up 
to 31/3/2010. During this tenure as Associate  Consultants to M/s STUP consultants  Pvt Ltd., 
Bangalore  involved in the  Detailed Engineering of Nagarjunasagar Tail Pond dam , 

Consultant 
115

Gandikota  Dam and Lower Jurala Hydro Electric Project  which are under construction, 
Further involved in Preparation of revised DPR for Polavaram Hydro Electric Project with 
12X80MW(960MW) Installed Capacity . 
  
Currently from 1.4.2010  to till date working with Design Group Project Consultant Pvt Ltd., 
as Deputy Director (designs) in the planning, design of Hy
dro Power Projects and Irrigation 
Project and other Structure   
 
Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer (India) 2) 
Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics 

Consultant 
116

 
Mr. Achutha Narayana, after obtaining M.Tech from Prestigious Indian 
Institute of Technology in the year 1996  and has since 15 years of 
exclusive  experience in design of various components of hydroelectric 
Projects. He started his career in Design Group Project Consultants Pvt. 
Ltd., Bangalore as Design Engineer (Civil) and was involved in Ha
rangi 
HEP (2x4.5MW)  in Karnataka. He joined NHPC ltd., A Govt. of India Enterprise in year 
1998 and was involved in Planning and Construction stage Design of Dhauliganga HEP 
(4x70MW), Uttaranchal and Chamera‐III HEP (3x77MW), Himachal Pradesh. He was 
associated with the preparation of DPR of Siyom HEP (
 Arunachal Pradesh, 
Dhauliganga Intermediate HEP, Uttaranchal, Tender stage Design Activities for Chamera‐III 
HEP, Kishanganga  HEP (3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was 
also involved in Pre‐feasibility reports of 7 projects in Arunachal Pradesh under “Prime 
Minister 50000MW Initiative” totaling to 2581  MW. He was also as
 with the 
consultancy project of Katra – Laole KRCL Stretch of Prestigious Jammu‐Kashmir Rail Link 
Project. He has also few technical papers presented in various National Seminars. He is a 
member of Indian Society of Rock Mechanics and Tunneling Technology (ISMRTT) and 
International Society for Rock Mechanics (ISRM) an
 Indian Hydropower Association 
(INHA). 
 
He joined TCE, Bangalore in 2007‐2008 and was associated with 100MW  Augmentation of 
Bhira Power station and Gokak SHEP. 
 
Since  later half of 2008, he is working as Deputy Director (Designs) in Design Group Project 
Consultants Pvt. Ltd. and has been responsible for various co
 stage Hydel 
Projects, DPR’s and Pre‐tendering Services for various projects.   
 
 

 
Consultant 
117 
Mr. T.S. Srinivasa, after obtaining M.E., from one of the noted Institution 
PSG College of Technology, Coimbatore, Tamilnadu in the year 1987 and 
B.E. from National Institute of Engineering College, Mysore, Karnataka 
in the year 1984, worked in various capacities in a Public Sector/Private 
companies. He has worked In Public sector Ka
  Urban Water 
Supply  & Drainage Board (KUWS&DB) from 1986 to 2006 for 21 years. He took voluntary 
retirement from KUWS&DB and worked in private organizations such as M/s Secon as 
Manager and Ms/ Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).  
 
He was head of Design Wing while working with KU
 was involved in preparation 
of many DPRs comprising of Planning, Design, Estimating, implementation of number of 
water supply  and sewerage schemes  including Water treatment plants(WTPs) and Sewage 
Treatment Plants(STPs)in urban areas of Karnataka  State. He was involved with water 
supply  & sewerage schemes’ proposals to second major city in the st
 viz., Hubli‐Dharwar 
city under World Bank Project. He was also involved with National River Conservation 
Projects for prevention of river pollution in the state. 
 
While working with M/s. Secon, he was involved with water supply  and sewerage projects 
in different towns of Libya country. While working with M/s. Ju
 Infrastructure Ltd., he 
was involved with Design and implementation of Infrastructure facilities such as roads, 
water supply, sewerage, storm water drainage, Electrical  & Communication facilities to a 
number of town ship development projects including some of the SEZs. 
 
From 2009 onwards he heads the Water Division of DGPCL responsible fo
r implementing 
water supply  and sewerage projects. Presently he is involved with detail Civil Engineering 
Design  of Rafha gas based Power Plant Project in Saudi Arabia. 

Consultant 
118 
 
Mr. P Sudarshan Rao, after obtaining B.E. (E&E) from Malnad College of 
Engineering, Hassan (Mysore University) in 1987 worked in the same college 
and Regional College of Education, Mysore as a Lecturer for a brief period 
before joining KPCL in 1989. 
 
He has more than 22 years of experience, as A
 Executive Engineer in Karnataka Power 
Corporation Limited, a State owned Public Sector Undertaking with dedication for Power 
Generation to the State with ISO 9001 and ISO 14001 certification. He has experience in 
Operation, Maintenance and Design wings of 210/250  MW coal based Thermal Power Plant. 
He also has experience ac
 domains like Inventory Management, Tendering, Tender 
Evaluation, Study of various Control System drawings, Planning of Preventive  and 
Breakdown Maintenance of 210 MW Generator & Auxiliaries, Erection & Commissioning of 
Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear, 
220kV & 400kV Outdoor Switchyard, and St
 Battery System. He was also involved in 
preparation of cable schedules, interconnection schedules and commissioning of 210 MW & 
250MW  coal fired thermal Units. 
 
After joining DG in February 2011, he is the group lead of Electrical Design team carrying out 
detail Engineering for gas based generating plants and hy
 electric plants.