SAP Production Planning
ECC Vs S/4HANA
Prepared by –Kanchan Chaudhari
Kanchan Chaudhari 1
ECC Vs S/4 HANA –MRP Run
ECC –MD01 GUI HANA –MD01N
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments This featurenot availableon ECC UsingMRPLive,youcanbenefitfromimproved
performanceandexecutetheplanningruninmuch
shortercycles.Inadditiontotheplanningscopes
coveredbytheclassicMRPtransactions,MRPLive
alsosupports,
•Theplanningofaselectedmaterialinaselected
locationanditssupplyinglocations.
Kanchan Chaudhari 2
ECC GUI HANA
Comments This featurenot availableon ECC •TheplanningofallthematerialsforwhichoneMRP
controllerisresponsible.
•Theplanningofthedistributionofaselectedmaterial
acrossseverallocations.
•Theplanningofaselectedmaterialinaselectedlocation
anditssupplyinglocationsandthecomponentsinthe
productionlocationorlocations,multilevelacrossthe
completesupplychain.
Improvedperformanceandexecutetheplanningrunin
muchshortercycles(10+times)–severalplanningruns
dailycanbeexecutedprovidingtheMRPcontrollerwiththe
followingbenefits,forexample:
•Moreup-to-datesupplyanddemandinformationon
whichtobasedecisions.
•Fasterreactiontodemandchangesreducestheriskof
stock-outsandmeansthatyoucanreducesafetystocks.
•Matchdemandandsupplymoreefficientlythanwas
previouslypossible.
•Identifyandreacttoissuesfasterthanwaspreviously
possible.
ECC Vs S/4 HANA –MRP Run
Kanchan Chaudhari 3
S/4HANA ECC ERP
MRP Activation All plants are MRP relevant by default Customizing required -Activate MRP and Set up Planning file(T001W-
BEDPL)
Processing Key NEUPL &NETCH NEUPL &NETCH &NETPL
Low Level Code Read from material master(MARC-DISST) Save in planning file entry(E.g. DBVM-DISST)
Record Type No Save in planning file entry(E.g. DBVM-MAFID)
Tables PPH_DBVM MDVM -Plant
DBVM -MRP area
MDVL -LTP, Plant
DBVL -LTP, MRP area
KBVM -Individual Customer Planning File Entry, MRP Area
Reports PPH_SETUP_MRPRECORDS
PPH_SETUP_MRPRECORDS_SIMU
RMMDVM20, RMMDVM10 (creation and consistency check for
MDVM/DBVM)
RMMDVL20, RMMDVL10 (creation and deletion for MDVL/DBVL).
T-codes MD20 -Create planning file entries for one material
MD21 -Display planning file entries
PPH_MDAB -Create planning file entries
PPH_MDRE -Consistency check
PPH_MSAB -Create planning file entries for LTP
PPH_MSAC -Delete planning file entries for LTP
MD20 -Create planning file entries for one material
MD21 -Display planning file entries
MDAB -Create planning file entries
MDRE -Consistency check
MSAB -Create planning file entries for LTP
MSAC -Delete planning file entries for LTP
Coding Class CL_PPH_MRPRECORD DISPSATZ_ERSTELLEN
MD_MDVM_TABLE
ECC Vs S/4 HANA –MRP Run
Kanchan Chaudhari 4
ECC Vs S/4 HANA –Selection Method for Production Version
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments Following selection methods availableon ECC,
•Selection by order quant.
•Selection by explosion date
•Selection by production version
•Selection only by production version
ThisfeaturenotavailableonS4HANA.
Productionversionwithlatest“validfromdate”
considered,irrespectiveofselectionmethodand
lotsize.
Kanchan Chaudhari 5
ECC Vs S/4 HANA –Production Version Status
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments Following production version status availableon
ECC,
•Not Locked.
•Locked for any usage.
InS/4HANAnewstatusaddedforproduction
version.
•Lockedforautomaticsourcing.
Thenewstatus"Lockedforautomaticsourcing"
correspondstothe"Relevantforautomatic
sourcing"indicatoronthepurchasinginforecord.
Kanchan Chaudhari 6
ECC Vs S/4 HANA –Production Version : Mass Processing
ECC –C223 GUI HANA –C223
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments In ECC above screen is available for C223
transaction.
InS/4HANAnewscreenlayoutadded.Thismight
beaffecttheexistingBDCforproductionversion
massprocessing.
Kanchan Chaudhari 7
ECC Vs S/4 HANA –Production Version Mass Creation
ECC –MM01, MM02, C223 GUI HANA –MM01, MM02, C223
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. InS/4HANAproductionversionismandatoryto
createorders.Forcreationofmassproduction
versionfollowingtwonewprogramsavailable,
CS_BOM_PRODVER_MIGRATION
CS_BOM_PRODVER_MIGRATION02
Kanchan Chaudhari 8
ECC Vs S/4 HANA –Repetitive Manufacturing/Assembly change
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments Following fields are availableon ECC,
•Fair share rule.
•Push distribution.
•Deployment horizon.
•Action control.
InS/4HANAthesefieldsnotavailable.
Kanchan Chaudhari 9
ECC Vs S/4 HANA –VC Maintain Dependency
ECC –CU01, CU02, CU03 GUI HANA –CU01, CU02, CU03
System VersionECC 6.0 1610 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments Following functions are availableon ECC,
•Action field.
•Classification as Selection Condition.
•Transactions CU51, CU55, CU80, CUMODEL.
InS/4HANAthesefunctionsnotavailable.
•Actionfieldsremovedfrom.
•It'snotpossibletomaintain"Classificationas
SelectionCondition"inMaterialBOMitems
anymore.
•TransactionsremovedfromS/4HANA.
Kanchan Chaudhari 10
ECC Vs S/4 HANA –VC Maintain Dependency
ECC –CU01, CU02, CU03 GUI HANA –CU01, CU02, CU03
System VersionECC 6.0 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments Following functions are not availableon ECC,
•Processing Mode
InS/4HANAthisfunctionaddedin1709.
•ProcessingMode(Classic/AdvanceVariant
Configuration).
Kanchan Chaudhari 11
ECC Vs S/4 HANA –BOM Item Explosion Type
ECC GUI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusCONFIGURATION CHANGE CONFIGURATION CHANGE
Screenshots
Comments Following functions are availableon ECC,
•All versions of an item
•Version created most recently
•Version with latest valid-from date
InS/4HANAthesefunctionsnotavailable.
TheBOMitemexplosiontypeisfixedwithlatest
valid-fromdateonly.
Kanchan Chaudhari 12
ECC Vs S/4 HANA –MRP Processing Keys
ECC GUI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments Following process keys are availableon ECC,
•Net Change Planning.
•Net Change Planning in Planning Horizon.
•Online Regenerative Planning.
InS/4HANAonlyfollowingavailable.
•Net Change Planning.
•Online Regenerative Planning.
MRPcannolongercoveronlythematerial
shortagesinsidealimitedplanninghorizon.
Kanchan Chaudhari 13
ECC Vs S/4 HANA –MRP at Storage Location Level
ECC -MMSC GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments In ECC T-code MMSC is available with storage MRP
location indicator.
InS/4HANAMMSCisnotavailable.
TheMRParealogicismoreadvancedthanthelogic
forplanningonstoragelocationlevel.AllMRP
typesandlot-sizingproceduresarepossibleon
MRParealevel.
The system creates planning file entries on plant
and MRP area level.
Kanchan Chaudhari 14
ECC Vs S/4 HANA –Batch Management
ECC –MSC1, MSC2, MSC3 GUI HANA –MSC1N, MSC2N, MSC3N
System VersionECC 1610 √ 1709 √
Embedded Analytics NO
Process StatusTRANSACTION CHANGE TRANSACTION CHANGE
Screenshots
Comments Following transactions available in ECC.
MSC1
MSC2
MSC3
MSC4
InS/4HANAfollowingT-codeschangesasfollows,
•MSC1N Create Batch
•MSC2N Change Batch
•MSC3N Display Batch
•MSC4N Display Change Documents for Batch
Kanchan Chaudhari 15
ECC Vs S/4 HANA –Consumption Mode
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments In ECC following consumption mode available,
•Backward consumption only
•Backward/forward consumption
•Forward consumption only
•Forward/backward consumption
InS/4HANAnewconsumptionmodeadded,
In“period-basedconsumption”,salesorders,
dependentrequirements,ormaterialreservations
consumeplannedindependentrequirementsthat
liewithintheconsumptionperiodoftheplanned
independentrequirement.
Kanchan Chaudhari 16
ECC Vs S/4 HANA –Advanced Planning for Material
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalityisnotavailable.APO/PPDS
planning/masterdataformaterialiscompletely
separateprocess.
InS/4HANAnewAdvancedPlanningviewaddedin
Materialmaster.Thiswouldtellwhetherthe
materialshouldbeconsideredforplanning
immediatelyinPPDSandsimplifiedCIFactivity.
Itincludesthedatalikeplanningprocedure,
horizon,planexplosionetc.
Kanchan Chaudhari 17
ECC Vs S/4 HANA –Advanced Planning for Work Center
ECC –CR01, CR02, CR03 GUI HANA –CR01, CR02, CR03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalityisnotavailable.APO/PPDS
planning/masterdataforworkcenteriscompletely
separateprocess.
InS/4HANAworkcentershavecheckboxfor
“AdvancedPlanning”.Thiswouldtellwhetherthe
workcentersshouldbeconsideredforplanning
immediatelyinPPDSandsimplifiedCIFactivity.
Kanchan Chaudhari 18
ECC Vs S/4 HANA –Quota Arrangement Usage
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments InECCusageofQuotaarrangementfunctionalityis
available.
InS/4HANAMRPalwaysconsiderquota
arrangement,soitisnotrequiredinmaterial
master.
Kanchan Chaudhari 19
ECC Vs S/4 HANA –Unit of Measure Group
ECC –MM01, MM02, MM03 GUI HANA –MM01, MM02, MM03
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments InECCunitofmeasuregroupfunctionalityis
available.
InS/4HANAthisfunctionalityisnotavailable.Thisis
onlyforRetailinmaterialmaster.
Kanchan Chaudhari 20
ECC Vs S/4 HANA –PI Sheet in Process Order
ECC –CO55/CO60/CO60XT/CO64/CO67 GUI HANA –CO55/CO60/CO60XT/CO64/CO67
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments InECCABAP-List-BasedPI-Sheetsisavailable.InS/4HANAcontrolrecipedestinationsoftype1
(ABAP-basedPIsheets)havetobereplacedwith
controlrecipedestinationsoftype4(browser-
basedPIsheets)infuturerelease.
StilltheT-codesavailablebutabsoluteinfuture
release.NeedtouseXStep-basedprocess
instructionsinsteadofcharacteristic-basedprocess
instructions.
Kanchan Chaudhari 21
ECC Vs S/4 HANA –Monitor Material Coverage
ECC –MD04 FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Onlyusercan
checkthematerialsituationinMD04andrunin
MRPinseparatetransaction.
WiththetransactionalappMonitorMaterial
Coverage,youcanmonitorallthematerialsina
selectedareaofresponsibility.Youcanspecifya
shortagedefinitiontodeterminewhichofthe
materialshaveshortages.Youcanusethedefault
filterTimeTillShortagetocheckthecoverageof
materialswithinaspecifictimeframe.
Kanchan Chaudhari 22
ECC Vs S/4 HANA –Monitor Material Coverage
FIORI on HANA
Screenshots
Comments •Selectashortagedefinitionandspecifyatimehorizontodeterminewhichmaterialsyouwantto
monitor.
•Viewamateriallistaccordingtotheselectedshortagedefinitionaswellasotherselectioncriteria
•Saveyourpersonalizedvariantsastilesonyourhomepagefromwhichyoucanaccessthisapp.
•Displayachartshowingthestockavailabilityofaselectedmaterialoverthenext21days.
•ViewdetailsoftheselectedmaterialsandcheckdifferentsolutionsintheManageMaterial
shortagesapp.
•Tailortheapptoyourneedsandsavethecombinationofshortagedefinition,timehorizon,and
filters as a variant
Kanchan Chaudhari 23
ECC Vs S/4 HANA –Manage Material Coverage
ECC –MD04 FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Onlyusercan
checkthematerialsituationinMD04andrunin
MRP,ConvertPRtoPOetcinseparatetransactions.
WiththetransactionalappManageMaterial
Coverage,youcancheckthecoverageofyour
materialsbasedonthesettingsyoumadeinthe
MonitorMaterialCoverageapp.Tohelpyousolve
yourshortages,thesystemproposesdifferent
solutions.Youcansimulatethesolutiontopreview
itseffectsandyoucanapplythesolutionthatbest
solvesyourissue.
Kanchan Chaudhari 24
ECC Vs S/4 HANA –Manage Material Coverage
FIORI on HANA
Screenshots
•Two Star –Vendor can meet
the qty. and date.
•One Star –Vendor can meet
the qty., late on date.
•Gray out –Vendor cannot
meet the requirement
•Simulate –Simulate the
solution to preview its
effects.
•Apply –apply the solution
that best solves your issue.
Kanchan Chaudhari 25
ECC Vs S/4 HANA –Monitor External Requirements
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. WiththetransactionalappMonitorExternal
Requirements,youcanmonitortheuncovered
requirementsoriginatingfromsalesordersand
stocktransportordersinaselectedareaof
responsibility.Youcanspecifyashortagedefinition
andatimehorizontodeterminewhichuncovered
externalrequirementsyouwanttocheck.
Kanchan Chaudhari 26
ECC Vs S/4 HANA –Monitor External Requirements
FIORI on HANA
Screenshots
Comments •Selectashortagedefinitionandspecifyatimehorizontodeterminethescopeoftheuncovered
externalrequirementsyouwanttocheck.
•Viewatableofsalesordersandstocktransportordersaccordingtotheselectedshortage
definitionaswellasotherselectioncriteria.
•Saveyourpersonalizedvariantsastilesonyourhomepagefromwhichyoucanaccessthismonitor
externalrequirementsappordirectlynavigatetotherespectiveManageexternalrequirements
app.
Additional button with this apps,
Start MRP –To solve shortage my executing
MRP.
Open –To open the Items
Kanchan Chaudhari 27
ECC Vs S/4 HANA –Manage External Requirements
ECC –MD04 FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Onlyusercan
checkthematerialsituationinMD04andrunin
MRP,ConvertPRtoPOetcinseparatetransactions.
WiththetransactionalappManageExternal
Requirements,youcancheckyouruncoveredand
delayeditemsrequiredforsalesordersandstock
transportordersbasedonthesettingsyoumadein
theMonitorExternalRequirementsapp.Tohelp,
thesystemproposesdifferentsolutions.Youcan
simulatethesolutiontopreviewitseffectsandyou
canapplythesolutionthatbestsolvesyourissue.
Kanchan Chaudhari 28
ECC Vs S/4 HANA –Manage External Requirements
FIORI on HANA
Screenshots
Comments •Viewalistofyouruncoveredandlateexternalrequirements.
•Viewdetailsofthestock/requirementssituationasatableorasachart.
•Viewadditionalmaterialinformation.
•ClickonanMRPelementlinktoopenaquickviewwithfurtherdetails.
•Selectanuncovereditemtocheckthedifferentsolutionsproposedbythesystem.
•Previewtheeffectsoftheproposedsolutionsasatableorasachart.
•Chooseasolutiontoapplythechanges.
Additional button with this apps,
Start MRP –To solve shortage my executing
MRP.
Open –To open the Items
Kanchan Chaudhari 29
ECC Vs S/4 HANA –Monitor Internal Requirements
ECC –MD04 FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Onlyusercan
checkthematerialsituationinMD04andrunin
MRP,ConvertPlannedordertoorderetcin
separatetransactions.
WiththetransactionalappMonitorInternal
Requirements,youcanensurethatcomponentsare
availableintherightquantityandintimesothat
internalrequirementsoriginatingfromproduction
orders,processorders,maintenanceorders,and
networkorderscanbefulfilled.Youcanspecifya
shortagedefinitiontodeterminewhichreceipts
andrequirements.
Kanchan Chaudhari 30
ECC Vs S/4 HANA –Monitor Internal Requirements
FIORI on HANA
Screenshots
•Two Star –Vendor can meet
the qty. and date.
•One Star –Vendor can meet
the qty., late on date.
•Gray out –Vendor cannot
meet the requirement
•Simulate –Simulate the
solution to preview its
effects.
•Apply –apply the solution
that best solves your issue.
Kanchan Chaudhari 31
ECC Vs S/4 HANA –Manage Internal Requirements
ECC –MD04 FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Onlyusercan
checkthematerialsituationinMD04andrunin
MRP,ConvertPlannedOrdertoOrderetcin
separatetransactions.
WiththetransactionalappManageInternal
Requirements,youcancheckthecoverageof
componentsrequiredforin-houseproduction
orders,processorders,maintenanceorders,and
networkordersbasedonthesettingsyoumadein
theMonitorInternalRequirementsapp.Youcan
simulatethesolutiontopreviewitseffectsandyou
canapplythesolutionthatbestsolvesyourissue.
Kanchan Chaudhari 32
ECC Vs S/4 HANA –Manage Internal Requirements
FIORI on HANA
Screenshots
Comments •View a list of your missing components for internal requirements.
•View details of the stock/requirements situation as a table or as a chart.
•View additional material information.
•Select an uncovered item to check the different solutions proposed by the system.
•Preview the effects of the proposed solutions as a table or as a chart.
•Choose a solution to apply the changes.
•Navigate to the Monitor Internal Requirements app to get an overview of the missing components.
•Navigate to fact sheets and back-end transactions to access further information or change
material data
Kanchan Chaudhari 33
ECC Vs S/4 HANA –Monitor Production/Process Orders
ECC –COOIS FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCtherearemultipletransactionsavailable.
UsercancheckthematerialsituationinMD04and
convertPlannedOrdertoOrders,Material
availabilitycheck,Confirmationetcinseparate
transactions.
WiththetransactionalappMonitorProduction
OrdersorProcessOrders,youcanmonitorthe
statusoftheordersinyourareaofresponsibility.In
thelistyoucanviewifmaterialswillbefinishedtoo
lateforthepeggedrequirements,ifthe
componentsrequiredforthesematerialswillnot
beavailableintime,andifmilestonesand
operationsaredelayed.
Kanchan Chaudhari 34
ECC Vs S/4 HANA –Monitor Production/Process Orders
FIORI on HANA
Screenshots
Comments •Narrowdownthescopeoftherequirementslistbyusingfilters.Youcanusethedefaultfilters
OrderStatus,MaterialDelay,ComponentDelay,DelayinProcessorchooseadditionalfilters.
•Viewatableofproductionordersorprocessordersaccordingtotheselectedshortagedefinition
aswellasotherselectioncriteria.
•Getaquickoverviewofthecurrentstatusofyourmaterials,components,andmilestones
representedbysymbolsinonetablecolumn.
•Saveyourpersonalizedvariantsastilesonyourhomepagefromwhichyoucanaccessthis
Monitor...appordirectlynavigatetotherespectiveManage...app.Formoreinformationabout
variants,seeWorkingwithVariants.
Additional icons with this apps,
Material Late –Materials will be finished too late
Component Missing –components not be available
Milestone Delay -Milestones and operations are
delayed
Kanchan Chaudhari 35
ECC Vs S/4 HANA –Manage Change Requests
ECC –MD04 FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. Withthistransactionalapp,youcanfollowupon
changesyouhaverequestedfromyourvendoras
wellasplacerequestsforchangesyouhave
collected.Youcreatechangerequestswhenusing
theappsformanagingmaterialshortagesor
uncoveredrequirements.Youcanrequestthatthe
vendorchangethequantityordeliverydateina
purchaseorderorstocktransportorder.
Kanchan Chaudhari 36
ECC Vs S/4 HANA –Manage Change Requests
FIORI on HANA
Screenshots
Comments •View a list of vendors and contacts from whom you have requested or want to request changes.
•View details of the change requests in a table.
•View additional information about the MRP elements in a quickview.
•Add notes to the change request.
•Send an email to the vendor to request changes.
•Enter the response from your vendor.
•View additional information about the item in a stock/requirements list.
•Apply the changes to the purchase order or stock transport order.
•Discard the change request if it is outdated or no longer needed.
Kanchan Chaudhari 37
ECC Vs S/4 HANA –Advanced Planning
ECC GUI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments YoucanusePPDS/APOinaseparatesystem.Also
needstoCIFthedatafromECCtoAPO/PPDSand
viceversa.
InS/4HANAAdvancedPlanningisthepartof
systemandthereisnoneedofmaintaining
separatesystemandCIFofdata.
Kanchan Chaudhari 38
ECC Vs S/4 HANA –Production Scheduling Board
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Youneedto
activatePPDS/APOtoviewtheplanningboards.
AlsoneedstoCIFthedatafromECCtoAPO/PPDS.
Withthistransactionalapp,youcanoptimizeand
plantheresourcescheduleandtheorderdatesand
timesindetailbytakingresourceandcomponent
availabilityintoaccount.
Kanchan Chaudhari 39
ECC Vs S/4 HANA –Production Scheduling Board
FIORI on HANA
Screenshots
Comments •Select a period of time for scheduling production.
•Choose how and where you want to place your production order.
•View the utilization of the resource and sort the results based on the given filters options.
•Set or modify scheduling options manually or through Heuristics.
•Create an order or delete/modify an existing order.
•Publish changes to the liveCache.
•Save a draft version or save as a new production order.
•Apply predefined application settings by choosing relevant application profile.
Kanchan Chaudhari 40
ECC Vs S/4 HANA –Monitor Capacity Utilization
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable.Youneedto
activatePPDS/APOtoviewtheresourcecapacity
utilization.AlsoneedstoCIFthedatafromECCto
APO/PPDSandviceversa.
Withthistransactionalapp,youcanmonitorthe
utilizationofresourcesinaselectedareaof
responsibility.Thelistprovidesyouwithaquick
overviewofwhichresourcesarealreadybeingfully
utilizedorhaveacapacityoverloadsoyoucanreact
quicklytocriticalsituations.
Theevaluationprofileyouchoosedefineswhich
ordersoroperationsthesystemtakesintoaccount.
Kanchan Chaudhari 41
ECC Vs S/4 HANA –Monitor Capacity Utilization
FIORI on HANA
Screenshots
Comments •Select an evaluation profile to determine which resources you want to monitor.
•Display a color-coded chart showing the capacity utilization of the resources.
•Configure the utilization chart to show a certain number of days or weeks.
•Save your personalized variants as tiles on your home page from which you can access this app.
•Navigate to the back-end transaction to maintain the resource planning table of a selected
resource.
•Navigate to theProduction Scheduling Boardapp for a selected resource to schedule and
reschedule orders using dates or time as scheduling attributes.
•Modify or delete shifts and add shifts, intervals, and downtimes using theEditfeature.
Kanchan Chaudhari 42
ECC Vs S/4 HANA –Analyze PIR Quality
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics YES
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. Withthisanalyticalappyoucananalyzehow
accuratelyyouforecastedyourplanned
independentrequirementsformaterials.Youcan
determinehowwellyourforecasteddemandsfor
salesordersmatchedthequantitiesthatwere
actuallydeliveredtocustomers.Youcananalyze
thisdataformonthlyperiodsinthepast.
Kanchan Chaudhari 43
ECC Vs S/4 HANA –Analyze PIR Quality
FIORI on HANA
Screenshots
Comments •Monitor the maximum positive forecast deviation per month.
•Monitor the maximum negative forecast deviation per month.
•Monitor the deviation between actual sales quantity and forecasted quantity per month in the past.
•Monitor the maximum and minimum forecast quantities and the number of forecasts per period.
Kanchan Chaudhari 44
ECC Vs S/4 HANA –Excess Component Consumption
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics YES
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. Withthisanalyticalappyoucancomparethe
expectedcomponentscrappercentagedefinedin
theBOMitemwiththeactualexcessconsumption
recordedintheproductionconfirmation.youcan
performastep-by-stepanalysisforaspecifictime
periodanduncovernumerousinsightstoimprove
yourplanningandtakeotherappropriateactionto
achieveamorereliablecomponentsupplyfor
production.
Kanchan Chaudhari 45
ECC Vs S/4 HANA –Excess Component Consumption
FIORI on HANA
Screenshots
Comments •Create your own visual alerts on KPI tiles for a specific time period and other related features.
•See real-time data from different perspectives or dimensions.
•Display financial cost deviation automatically in a bubble chart.
•Make selections in charts and other representations.
Kanchan Chaudhari 46
ECC Vs S/4 HANA –Material Scrap
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics YES
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. Withthisanalyticalappyoucancompareactual
scrapfiguresrecordedintheproduction
confirmationswiththeexpectedscrapthatwas
definedinthematerial.Itallowsyoutoimplement
afeedbackloopforupdatingtheexpectedscrap
percentageinthematerial.Theappshowsthe
materialswheretheexpectedscrappercentage
mostdiffersfromtheactualscrappercentage
Kanchan Chaudhari 47
ECC Vs S/4 HANA –Material Scrap
FIORI on HANA
Screenshots
Comments •Create your own visual alerts on KPI tiles for a specific time period and other related features.
•See real-time data from different perspectives or dimensions.
•Automatically calculated fields: Material's expected scrap percentage, material's actual scrap
percentage, material's actual yield percentage, material's actual rework percentage.
Kanchan Chaudhari 48
ECC Vs S/4 HANA –Operation Scrap
ECC FIORI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics YES
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. Withthisappyoucancompareactualscrapfigures
recordedintheproductionconfirmationswiththe
expectedscrapthatwasdefinedintherouting
operation.Itallowsyoutoimplementafeedback
loopforupdatingtheexpectedscrappercentagein
theroutingoperation.Theappshowsthework
centerswheretheexpectedscrappercentagemost
differsfromtheactualscrappercentage.
Kanchan Chaudhari 49
ECC Vs S/4 HANA –Operation Scrap
FIORI on HANA
Screenshots
Comments •Create your own visual alerts on KPI tiles for a specific time period and other related features.
•See real-time data from different perspectives or dimensions.
•Analyze categories and KPIs for scrap reason analysis.
•Automatically calculated fields: Operation's expected scrap percentage, operation's actual scrap
percentage, operations'sactual yield percentage, operation's actual rework percentage.
Kanchan Chaudhari 50
ECC Vs S/4 HANA –Planning File Table
ECC GUI HANA
System VersionECC 6.0 1610 √ 1709 √
Embedded Analytics NA
Process StatusPROCESS CHANGE PROCESS CHANGE
Screenshots
Comments InECCtheoriginalplanningfilestables
MDVM/MDVLandDBVM/DBVLareavailable.
TheoriginalplanningfilesMDVM/MDVLand
DBVM/DBVLnolongerexist.Theywerereplacedby
thenewplanningfilePPH_DBVM.
Afterthesystemconversion,youshouldrunreport
PPH_SETUP_MRPRECORDStopopulatethenew
planningfiletablewithoperativeMRPrecords.
Kanchan Chaudhari 51
ECC Vs S/4 HANA –Transaction MM-IM
ECC –MB31, MB1C, MB1A, MB1B GUI HANA –MIGO
System VersionECC 1610 √ 1709 √
Embedded Analytics NO
Process StatusTRANSACTION CHANGE TRANSACTION CHANGE
Screenshots
Comments Following transactions available in ECC.
MB01, MB02, MB03, MB04, MB05, MB0A, MB11,
MB1A, MB1B, MB1C, MB31, MBNL, MBRL, MBSF,
MBSL, MBST and MBSU
InS/4HANAfollowingT-codeshavebeenreplaced
bythesingle-screengeneralizedtransactionMIGO.
Kanchan Chaudhari 52
ECC Vs S/4 HANA –FIORI Application Type
ECC FIORI HANA
System VersionECC 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. InS/4HANAFIORIfollowingnewapplications
added,
•Transactional–Accesscreate/change/display
task.
•Analytical–VisualoverviewoftopicforKPI
analysis.
•Factsheet–Viewessentialinformationabout
objectanditsnavigation.
Kanchan Chaudhari 53
ECC Vs S/4 HANA –MM Accounting 1 View
ECC FIORI HANA
System VersionECC 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECCthisfunctionalitynotavailable. InS/4HANAfollowingnewviewsadded,
•CurrentPeriod
•PreviousPeriod
•LastYearPeriod
•FutureCostingRun
•CurrentCostingRun
•PreviousCostingRun
Kanchan Chaudhari 54
ECC Vs S/4 HANA –BOM Header Field Change
ECC FIORI HANA
System VersionECC 1610 √ 1709 √
Embedded Analytics NO
Process StatusNEW PROCESS NEW PROCESS
Screenshots
Comments InECC,field FromLotSizefunctionalityisavailable.InS/4HANA,fieldFromLotSizefunctionalityisnot
available.
Kanchan Chaudhari 55