Electrical_Safety[1].ppt

APcreation7 21 views 48 slides Oct 21, 2022
Slide 1
Slide 1 of 48
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48

About This Presentation

Naka


Slide Content

www.spin-safety.org
Electrical Safety
Subpart K

Disclaimer
The information presented in this presentation has been compiled from
sources believed to be reliable and is intended to be a tool to assist and
guide you in building your own presentation. This program may not
address all the hazardous conditions or unsafe acts that may exist. For
that reason, SPIN cautions users to confirm accuracy and compliance
with the latest standards and best practices. Local, State/Provincial
and Federal regulations take precedence over this material.
Implementation of any practices suggested by this program is at your
sole discretion, and SPIN will have no liability to any party for any
damages including, but not limited to, direct, indirect, special or
consequential damages, arising out of or in connection with the
information provided or its use.

Purpose of Training
To increase employee awareness of
electrical hazards on the jobsite
To control or eliminate employee
exposure to electrical hazards
To ensure that everyone understands
the AEGCP and the use of GFCI’s
To help meet OSHA compliance

Hazards of Electricity
Shock
Fibrillation
–50-100mA of current to cause fibrillation
Damage to tissue
–external burns & internal tissue & organ damage
–entry & exit wounds
Muscle Contractions
–unable to release
–causes longer period of contact

Electrocution
Current and Voltage
Path
Time

Electrocution?
Body temperature rises to 138°F
Tissues are baked like well done beef
Physical reactions include:
–heaving chest
–foaming mouth
–bloody sweat
–burning hair & skin
–release of feces
–eyeballs pop out

Fatal Assumptions:
120Volts can’t hurt me
DC can’t hurt me
Overhead power lines are insulated
I can’t get hurt if I don’t touch the wire
The more I get shocked the more immune I
become
Circuit breakers are designed for personnel
safety
Joe Bob knows I’m working on this so I’m O.K.

Fatalities:
Failure to lockout piece of equipment
Power tools shorting out
contacted overhead power lines

Three Levels of Protection:
Engineering danger out of the
job
Safe work practices
Personal protective
equipment (PPE)

Typical Construction Hazards
Overhead lines
Buried lines
Sharp edges on metal material (studs)
Cords that are damaged in anyway
Safe clearances around electrical
equipment
Damaged tools or receptacles
Wet weather conditions

Typical Construction Hazards
Temporary wiring
High voltage lines
–crane operations
–metal ladders
–tight workspace
Improper or nonexistent grounding
Non-existent or non-functional GFCI’s
Improper or non-existent security

Common Citations
No GCFI or AEGCP
Tools have no ground
Lack of training when near power lines
Equipment not approved for classified
locations
Guarding of live parts
Flexible cord strain relief

OSHA Gives Two Options:
Ground Fault Circuit Interrupters
–GFCI
Assured Equipment Grounding
Conductor Program
–AEGCP

Ground Fault Circuit
Interrupters
Intended to quickly interrupt the circuit in the event of a
ground fault, to prevent electrocution.
GFCI will break the circuit when a leakage of 5mA or
more is occurring
–usually within 1/40 of a second
GFCI requirements pertain only to temporary wiring on
construction sites
–exception: kitchens & other wet area’s
Must provide approved GFCI’s on all 120v, single
phase, 15 & 20A receptacle outlets
Note: GFCI does not prevent shock!

How the GFCI protects people
(By opening the circuit when current flows through a ground-fault path)

Assured Electrical Grounding
Conductor Program
All cord sets & receptacles which are not
part of the permanent wiring of the building
or structure shall be tested and marked.
Jan.-Mar. White
April-June Green
July-Sept. Red
Oct.-Dec. Orange
Repair Brown

When to test?
Before first use
After any repairs
–Before equipment is returned to service
Before equipment is used after any
incident, where damage may be
suspected.
Every quarter

How to test?
Plugs in to show if terminals
are correctly connected to
ground, and if wire is
continuous (without breaks)
Checks if ground is continuous
from metal frame (a) through
cord to 3rd prong (b).
Also touch tester contact to (c)
then (d) prongs to detect
possible ground fault

Recording Test Results:
The test preformed shall be recorded to
identify each receptacle, cord set and
plug-connected equipment that passed.
This record shall be kept by:
–logs
–color coding
–other effective means

Temporary Power Hook-Up
All temporary outlets rated at 120 volt, single
phase, 15 & 20 amps must have GFCI’s and
established AEGCP.
All extension cords will be of the three
conductor wire type
All temporary lights must be guarded to
protect against accidental contact or
breakage
All temporary lights must be on separate
circuits from tool circuits

Hand and Power Tools
Inspect tools for wear or defects
Never modify tools
Inspect for frayed insulation or loose connection
Make sure tools are clean and dry
Do not carry, store or hang up by power cord
Never remove grounding post
Do not overload wall plugs or extension cords
Stop using tools immediately if they begin to
smoke, spark or shock

Accident Review:
The drill was not
double insulated and
the ground prong was
missing
Three citations issued:
–GFCI’s or AEGCP
–Inspect electrical tools
–use equipment that
provides a permanent
and continuous path
from circuits or
equipment to ground

Portable Extension Cords
Inspect portable extension cords daily:
–Is the tool rated for the job your doing
–Are the cord’s plug & receptacle designed to be
used together
–Does the cord have loose parts, deformed &
missing pins or damage to outer insulation?
–Does the cord have a working GFCI?
–Ensure that cords are protected from pinch points
& sharp edges
Note: Never staple a cord, or raise and lower
equipment with the cord.

Overload
Beware of overload
More than two plugs per double outlet is
overloaded
Never overload any outlet for any
reason

Housekeeping
Keep cords out of walkways and
roadways
–If not possible, cords must be protected
from vehicle traffic
Keep cords clean & dry
Make sure hands are dry before
unplugging cords and equipment

Flammable Dust and Vapors
Combustible dust, flammable fumes or
excess oxygen can be ignited by a
spark
Use ventilation to lower the
concentration of atmospheric hazards in
your work area.
Note: 60% of all industrial fires are
caused by poor connections and faulty
outlets.

For Electrical Fires
911
Do not touch burning object
Do not use water
–use CO or ABC extinguisher
Unplug or turn off the current if it can be
done safely
Stay clear of the area and wait for the
professionals

Bonding
There is no
voltage between
two conductive
objects that are
bonded together

Approach distances for
Qualified employees:
Qualified person: specifically trained in the
hazards of working on energized parts and
equipment.
300V & less…………………………..….Avoid contact
Over 300V, not over 750V………………1 ft. 0 in.
Over 750V, not over 2kV………………..1 ft. 6 in.
Over 2kV, not over 15kV………………..2 ft. 0
in. Over 15kV, not over 37kV………………3 ft. 0
in. Over 37kV, not over 87.5kV…………….3 ft. 6
in. Over 87.5, not over 121kV………………4 ft. 0
in. Over 121kV, not over 140kV……………4 ft. 6
in.

Approach distances for
unqualified employees:
Neither you nor anything you touch can
get within 10 feet of an over head line
carrying up to 50kV.
Add 4 inches of clearance for every
10kV over 50kV.

Electrical Arc:
Temperature can reach 35,000º F
–4 times hotter than the sun
–similar to nuclear weapons
You can be killed at up to 20 feet from a high
energy arc
–and receive severe burns as far as 40 feet away
Over half of all electrical injuries involve burns
from arcs

Be Alert -Don’t Get Hurt

High Voltage Lines
1 out of 3 injuries cause by high voltage lines results
in death!
Reminders for operators:
–Make sure that no part of your equipment can come
within 10 feet of high voltage lines.
–Never attempt to raise or move high voltage lines
–If equipment touches a high voltage line back away or
lower boom to break contact
–Generally safe to stay in the cab
–Dismount by jumping clear, and shuffling
Note: Never touch any part of the equipment and ground
at the same time

Accident Review:
Employee received no
training on the hazard
nor any specific
instruction
Two serious citations
were issued:
–Lack of training
–Not permit employees to
work near any electrical
power circuit without de-
energizing

Accident Review
Unloading a 40 foot
telephone pole from
pipe rack
Four serious citations
issued
–Training on the hazards
–Do not operate
equipment within
approach distances
–Did not maintain proper
clearances
–Determine existing
conditions

First Aid
Do not touch the victim
911
Turn off power
Use non-conductive object to push person away from
the electrical source
Administer rescue breathing, if breathing has stopped
Administer CPR if heart has stopped
Cover electrical burns
Reassure & calm victim until help arrives

Report All Near Misses
Often symptoms are delayed and the
person may need medical attention.
The Safety Department must be notified
any time an employee has an accident
involving an electrical shock.
Note: the purpose of the investigation, is
to prevent the reoccurrence

Lock Out-Tag-out
The
Control of
Hazardous
Energy

Authorized & Affected:
Authorized: employees will
actually be performing the
lock-out tag-out procedures,
and must be trained to
understand the program
Affected: employees working
in the area, must
understand what lock-out
tag-out is and how it effects
them.

When Should You Lock-Out
Clearing blocked or jammed
mechanisms
Maintenance or repair work on
equipment with moving parts
Certain confined space entries
Repairs or installation on electrical
circuits

Sequence of Lock-out or Tag-out
Procedure
Notify all affected employees
Shut down machine or equipment
Isolate energy source
springs air/ gas radioactive
hydraulic water pressure electrical
steam chemical mechanical
centrifugal
Lock-out & tag-out energy isolating device
After ensuring that no one is exposed, check to be sure
energy source is disconnected
Caution: Return operating controls back to neutral or off
position

Accident Review
Employee was
attempting to correct
an electrical problem
with two non-
operational lights
Two citations issued:
–No Lock-out / Tag-out
program
–Circuit not de-energized
or locked / tagged -out

Procedure Involving More Than
One Person
Each person shall have his
own lock
Each lock shall be secured,
so that all locks must be
removed before equipment
can be re-energized
The lock may only be
removed by the person who
placed it there

Maintenance and Repair of
Equipment in the Field
Any vehicle determined to be unsafe shall be tagged
out of service and may not be operated
Mechanic will notify supervisor & the operator and
obtain approval to service equipment
If equipment is in operation perform normal shut down
procedures
Person performing work will then place lock-out or
tag-out device in position
Key shall be removed from equipment & placed in
pocket of person performing work

Removal of the Tags and Locks:
Under normal conditions each person will remove
their own tags & locks
If the signer of the tag is not available or has left
the site, a supervisor meeting the following may
remove the tag or lock:
–Supervisor from same dept.
–Supervisor must talk to signer on condition of
equipment
–Supervisor must have sufficient knowledge of work
being performed
–Supervisor must be able to exercise proper
judgement

Re-energizing Electrical Systems
Inspect the entire work area
–tools have been removed
–guards are in place
Insure equipment is safe to operate
Warn co-workers
–no one is exposed
–Notify everyone affected
Remove locks & re-energize

Remember:
Notify all affected employees
Shut down machine or equipment
Isolate energy source
Lock out & tag-out energy isolating device
Check to be sure that energy source is
disconnected
Return operating controls back to neutral or
off position

As a Safety Professional, SPIN encourages you to submit safety
resources that are particularly beneficial to fellow Safety Professionals.
We welcome your suggestions and thank you for your input. Please use
the following instructions when submitting resources.
1.Please include your full name (first & last) in the subject section of the your email
2.Please include a brief description, name of program and version of any and all files submitted
3.Please use a compression program, like WinZip, when submitting multiple or large files
4 Please include appropriate contact information (name, phone number, etc.) when referring
potential new members
5.Include links to safety related URL's in the description section
6.Please send photos and graphic files as 72 dpi jpg, tif or gif files
submit all items to:[email protected]
For more information about SPIN visit the web-site at www.spin-safety.orgor call 1-800-673-0439