FE270 Section 10 (NXPowerLite).ppt cathodic protection

engashraf144 0 views 22 slides Oct 14, 2025
Slide 1
Slide 1 of 22
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22

About This Presentation

cathodic protection


Slide Content

Haward Technology Middle East 1Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Section 10
Protection of Production and
Injection Well Casing

Haward Technology Middle East 2Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well
Completion
SCVF:
Surface Casing Vent
Flow
Shallow area high risk
of SCVF
Deep area less risk of
SCVF

Haward Technology Middle East 3Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well Construction
Cap rock
Reservoir
Corrosive stratum
Casing
Flowline

Haward Technology Middle East 4Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
CP Current to Casing
NACE RP-0285-2002, Corrosion Control of Underground
Storage Tank Systems by Cathodic Protection
NACE RP-0186-2007, Application of Cathodic Protection
for External Surfaces of Steel Well Casings

Haward Technology Middle East 5Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Factors Relevant to CP Design
Subsurface geology
Well completion details
Current requirements
Density and proximity of wells
Interference from foreign CP systems
Optimise anode bed location
Electrical isolation of flow lines
AC power availability
Alternative power supply – wind, thermal, solar

Haward Technology Middle East 6Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Quality
of Grouting

Haward Technology Middle East 7Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well Logging Tool

Haward Technology Middle East 8Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Acoustic and
Gamma Log

Haward Technology Middle East 9Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Failure Mechanisms
Canadian data from
130,000 m in 142 wells
External corrosion and cement
quality from 10,500 m in 142 wells

Haward Technology Middle East 10Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well Construction
Cap rock
Reservoir
Corrosive strata
Casing
Isolation flange
T/R
Groundbed

Haward Technology Middle East 11Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Limitations of CP
High resistance strata
Low resistance strata
Poor quality cement job
Salinity changing OH
-
/Cl
-
ratio in cement
Carbon dioxide reducing cement pH

Haward Technology Middle East 12Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Typical Casing CP System
ANODE
CHAINS
PVC-CASING PERFORATED
ANODE GROUNDBED
HEAD STRUCTURE
ANODE
JUNCTION BOX
T/R-UNIT
PVC-CASING
FLOWLINE
I-FLANGE
WELL HEAD
CATHODE
JUNCTION BOX

Haward Technology Middle East 13Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Deep Ground Bed
Use redundant well
Drill new hole
Location of hole fixed by
potential profile testing
Anodes located 75 - 100 m
below the surface

Haward Technology Middle East 14Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Power Sources
Wind Thermal Solar

Haward Technology Middle East 15Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Total Current Density
The current density required depends on the
environment and cement quality
A range of current densities are used to determine the
total current requirement and can range from 1 –
30mA/m².
As a rule of thumb:
Depth (m) Current (A)
900 2
1500 5
3000 30

Haward Technology Middle East 16Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Casing Potential Profiles
Surface equipment must be electrically isolated from
the well head.
Well head equipment ID must equal casing ID.
Rods and tubing must be removed from well.
Casing must be in contact with formation -not inside a
liner.
Area to be profiled must not contain conductive fluids.
Complete casing history with well completion data
should be available
Well must be cleaned of rust and wax

Haward Technology Middle East 17Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair

Haward Technology Middle East 18Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Cathodic
Protection
Profile

Haward Technology Middle East 19Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
CP Profile Outputs

Haward Technology Middle East 20Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
CP Profiles
Different
Currents
Zero
current
1 Amp
DEPTH
POTENTIAL

Haward Technology Middle East 21Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Internal Corrosion
Caliper Tools

Haward Technology Middle East 22Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
End of This
Section
Tags