Haward Technology Middle East 1Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Section 10
Protection of Production and
Injection Well Casing
Haward Technology Middle East 2Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well
Completion
SCVF:
Surface Casing Vent
Flow
Shallow area high risk
of SCVF
Deep area less risk of
SCVF
Haward Technology Middle East 3Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well Construction
Cap rock
Reservoir
Corrosive stratum
Casing
Flowline
Haward Technology Middle East 4Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
CP Current to Casing
NACE RP-0285-2002, Corrosion Control of Underground
Storage Tank Systems by Cathodic Protection
NACE RP-0186-2007, Application of Cathodic Protection
for External Surfaces of Steel Well Casings
Haward Technology Middle East 5Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Factors Relevant to CP Design
Subsurface geology
Well completion details
Current requirements
Density and proximity of wells
Interference from foreign CP systems
Optimise anode bed location
Electrical isolation of flow lines
AC power availability
Alternative power supply – wind, thermal, solar
Haward Technology Middle East 6Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Quality
of Grouting
Haward Technology Middle East 7Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well Logging Tool
Haward Technology Middle East 8Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Acoustic and
Gamma Log
Haward Technology Middle East 9Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Failure Mechanisms
Canadian data from
130,000 m in 142 wells
External corrosion and cement
quality from 10,500 m in 142 wells
Haward Technology Middle East 10Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Well Construction
Cap rock
Reservoir
Corrosive strata
Casing
Isolation flange
T/R
Groundbed
Haward Technology Middle East 11Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Limitations of CP
High resistance strata
Low resistance strata
Poor quality cement job
Salinity changing OH
-
/Cl
-
ratio in cement
Carbon dioxide reducing cement pH
Haward Technology Middle East 12Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Typical Casing CP System
ANODE
CHAINS
PVC-CASING PERFORATED
ANODE GROUNDBED
HEAD STRUCTURE
ANODE
JUNCTION BOX
T/R-UNIT
PVC-CASING
FLOWLINE
I-FLANGE
WELL HEAD
CATHODE
JUNCTION BOX
Haward Technology Middle East 13Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Deep Ground Bed
Use redundant well
Drill new hole
Location of hole fixed by
potential profile testing
Anodes located 75 - 100 m
below the surface
Haward Technology Middle East 14Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Power Sources
Wind Thermal Solar
Haward Technology Middle East 15Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Total Current Density
The current density required depends on the
environment and cement quality
A range of current densities are used to determine the
total current requirement and can range from 1 –
30mA/m².
As a rule of thumb:
Depth (m) Current (A)
900 2
1500 5
3000 30
Haward Technology Middle East 16Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Casing Potential Profiles
Surface equipment must be electrically isolated from
the well head.
Well head equipment ID must equal casing ID.
Rods and tubing must be removed from well.
Casing must be in contact with formation -not inside a
liner.
Area to be profiled must not contain conductive fluids.
Complete casing history with well completion data
should be available
Well must be cleaned of rust and wax
Haward Technology Middle East 17Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Haward Technology Middle East 18Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Cathodic
Protection
Profile
Haward Technology Middle East 19Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
CP Profile Outputs
Haward Technology Middle East 20Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
CP Profiles
Different
Currents
Zero
current
1 Amp
DEPTH
POTENTIAL
Haward Technology Middle East 21Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
Internal Corrosion
Caliper Tools
Haward Technology Middle East 22Section 10
Cathodic Protection Systems: Design,
Fabrication, Installation, Operation and Repair
End of This
Section