GCC Railway

hussainalawi1 1,445 views 41 slides Jun 15, 2016
Slide 1
Slide 1 of 41
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41

About This Presentation

The phases of GCC Railway Project


Slide Content

GCC Railway Graduate Challenge Presentation Prepared by (Team A): Khalifah AlDoseri Moath Magableh Husain Baqer Maryam AlMarkhi ElMuthana Mohamed August 2015 Module III

Linking Six Nations...

Presentation Outline Introduction Planning Development Construction Future Development Conclusion

Work Flow

Introduction

Project brief

Project Cost

Origin-to-destination system Extend from Kuwait's border with Iraq to Salalah in southern Oman. 2,177km-long regional network Location

Planning

Project Time-Line Idea 2003 2008 Feasibility Study 2009 Approval Pre Design 2013 Full Design 2015 Railway Authority Execution submission 2018

The Plan

Challenges

Development

Linking the Six Nations There are currently around 24 projects, with some of the most expensive including: 1 2 3 4

Typical Passenger Railway Features

Typical Port & Freight Railway Features

Project Team / Management

Length of Railway States The total length of railway line in KM Kuwait 145 Bahrain 36 Qatar 283 Oman 306 United Arab Emirates (UAE) 684 Saudi Arabia 663 Total 2177

Project Map Muscat Abu Dhabi Doha Dubai Manama Dammam Kuwait

Transfer Rate States Transfer rate for the period (2004-2006) by means of current transportation Expected by train only in 2016 Kuwait 16.3 7.5 Bahrain 5.1 6.7 Qatar 6.6 4.3 Oman 1.8 2.8 United Arab Emirates (UAE) 3.7 7.1 Saudi Arabia 3.9 1.6 Other Arab states 2.6 1 Total 40 31.1

Comparison between the forecast transported between passengers before and after the railway Train Car Bus Airplane Total Before the operation of Gulf Railway network 28.820 1.106 13.034 42.960 In the beginning of the operation of Gulf rail way network 3.308 27.425 989 11.670 43.392

Railway Characteristics Passenger and Freight Single Line Track (Double tracks in certain areas) Diesel Traction Tunnels in the mountainous regions Double stack containers

Air conditioned trains at speeds of up to 200km/h Run in each direction every two hours mainly during the day Freight trains operating at 80-120km/h, and will operate mainly at night Diesel engine will cut the greenhouse gas emissions compared with road transportation Statistically, rail transportation is significantly safer Railway Characteristics

Project Map (Stations and Facilities)

Services

Construction

Project Phases KSA + UAE U nder construction

QATAR + OMAN W ill start execution Project Phases

BAHRAIN + KUWAIT P lanning Project Phases

Progress to Date

Technical Challenges 1 2 3 4 5 6

Future Development

Future Connections Connect Main project to Internal projects

GCC rail Project Future Connections Connect Main project to Internal projects

GCC rail Project + Internal Projects Future Connections Connect Main project to Internal projects

IRAQ YEMEN JORDAN SYRIA TURKEY Connect to other near countries Future Connections

Long Term Future

GCC railway & Bahrain AMP

Conclusion

Thank You Any Questions?