Ghorashal Power Plant Training: Understanding Power Generation, SCADA, and Smart Grids

ShourovPal 11 views 16 slides Feb 26, 2025
Slide 1
Slide 1 of 16
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16

About This Presentation

This workshop presentation provides an in-depth look into the Ghorashal Power Plant, its history, and its operational status. It covers essential topics related to power generation, energy metering, SCADA systems, and smart grids.

Key highlights include:

Ghorashal Power Plant Overview: Installed u...


Slide Content

Ghorashal Training Shourov paul

G horashal Power Plant Information 1-2 Unit 55*2=110 MW Steam Turbine Power Plant , Abolished in 2021 3 rd Unit 409 MW Combined Cycle Power Plant( Re-powered CCPP) Under maintenance. 4 th Unit 410 MW Combined Cycle Power Plant( Re-powered CCPP), Only GT Ready for Operation. 5 th Unit 210 MW Steam Turbine Power Plant , Ready for Operation. 6 th Unit 210 MW Steam Turbine Power Plant , Abolished in 2010. 7 th Unit 365 MW Combined Cycle Power Plant, Under maintenance.    Ghorashal   Power  Station consist of six (6) unit.(Old)             Unit No .          Installed Time        Installed Capacity .(MW) Types                1.                         1974                            55 Steam Turbine                2.                         1976                            55 Steam Turbine                3.                         1986                           210 ‘’                4.                         1989                           210 ‘’                 5.                         1994                           210 ’’                6.                         1999                           210 ‘’ 7. 2018 365 CCPP

LPH 1 EXT 7 Steam Flow Diagram of 210 MW TPP. Boiler ECONOMIZER Generator HPC IPC LPC Condensers Re -Heaters Condensate Pump Feed Pump ПH 100 To Condenser Super Heaters RSH Inj -III Inj -II Inj. -I Boiler Drum Water Wall Injection Ejector EXT 4 LPH 4 ПC 50 LPH 3 EXT 5 LPH 2 EXT 6 HPH 7 EXT 1 HPH 6 EXT 2 HPH 5 EXT 3 Deaerator PSH CSH- I CSH- II

Water tube wall boiler Fig. : Water tube wall From boiler down comer Steam(350 ° C ) Water tube wall Boiler drum

Double Break Type Isolator      

Transformer

Relay  

Buchholz Relay

Smart Meters E l ec t r onic Meters Indu c tion Meters Motor M e t er s P e ndulum Meters E l ec t r ol y tic Meters Evolution of Energy Meter

What is SCADA?

Smart Grid in Distribution

Worldwide Pioneer DCS Manufacturer 1. GE Mark Vie+ (GE) 2. SPPA T3000 (Siemens) 3. Symphony Plus(S+)(ABB) 4. Alspa Power Automation (GE Alsthom) 5. Mitsubishi Power

THANK YOU