01 Introduction Theme color makes PPT more convenient. 02 Project Overview Theme color makes PPT more convenient. 03 Architectural design Theme color makes PPT more convenient. 04 Structural design Theme color makes PPT more convenient. 05 Design summary Theme color makes PPT more convenient. CONTENTS
Plastering One is a process of applying one or more coats of mortar to a concrete surface, brickwork, stone masonry or lathing. It must be durable such that it resists the penetration of moisture and should be able to weather uniformly. It should also be pleasing in appearance. These properties depend upon materials used, composition of mix, and degree of mechanical bond between the plaster and the backing surface and workmanship.
STEPS FOR PLASTERING : STEP 1 : PREPARATION OF SURFACE:- Keep all the mortar joint of wall rough. Brush out all the dust and loose mortar Surface should be properly cured and dry surface. STEP 2: HACKING :- Hacking of concrete surface can start after curing for 1 day. It is easier to hack at this stage. The Hacking hammer is brought in contact with the concrete surface with an impact, such that only a small portion of well finished concrete surface is chipped off. Also we can use a mechanical device instead of hammer. The indent caused by such an action should be approximately 25 mm in length by visual observation and not more than 2 to 3 mm in depth. Very deep indents on concrete member can affects its strength. NOTE * : INDENT – mark caused during hacking on concrete surface due to impact.
STEP 4: MIXING OF INGREDIENTS :- Mixing of ingredients is done by a mixer. Dry mortar is mixed initially and thereafter water is added to the dry mix to get required consistency. The quantity of the mortar made at a time should be such that it can be consumed within 30 minutes. Generally, on this site , for plastering mix ratio is 1:4 . STEP 3: INSTALLATION OF BUTTON MARKS:- Button marks for Plastering should be fixed and checked. The button mark should be at not more than 2m from each other in both horizontal and vertical direction. Button marks are installed using right angle triangle 📐 and string . Button marks on opposite wall should be fixed exactly opposite of each other.
To measure the quantities of cement and sand during plastering , a Measuring Box is used . This box made of wood and its size in our site is 300*300*380 mm . STEP 4: APPLYING THE MIX :- In this site , a two – coat method is used for plastering. In this method , the first coat is known as Under Coat and second coat is known as Float or Finishing Coat. Undercoat plasters are usually applied at 10 mm and most finish coat plasters are applied at 2 mm. Internal Plaster : Thickness of the internal plaster is maintained Up to 10 to 15 mm. The mortar should be used within 30 to 45 minutes of its preparation. External Plaster : The no of coats for external plaster should not exceeds 2 coats. Thickness of the external plaster is maintained up to 20 to 25 mm.
TOOLS & EQUIPMENTS
TILING : Tiles in building construction are thin plates or elements used to cover surfaces like roofs , floors, and walls. Tiles in the present scenario are a primary element in bringing building interior as well exterior finishing and beauty. Also we define tiling as , The process of fixing tiles on the walls and floors to give them a desired finish and a durable surface. Tiles are available in different colors , types and textures. Tiles that are used in our site are : Vitrified tiles Kota Stone Ceramic tiles Pegasus Beige Terracotta tiles Terrazzo Eton Beige
STEPS FOR TILING :- STEP 1 : PREPARING THE SURFACE :- The surface on which the tiles will be laid should be cleared of all the debris and loose particles. It should be washed , if required. 5% of the total quantity of tiles that arrive in each batch is kept as wastage. For floor tiling, the concrete slab surface has to be thoroughly cleaned. For bathroom, under-tile waterproofing should be complete. The surface is free of cracks and holes. Also , surface is properly level by tube level and a 1m marking is marked on the walls from FFL ( floor finish level) by the surveyor.
STEP 2: INSTALLATION OF BUTTON MARKS :- With the help of One meter mark that previously made , we established our button marks and distance between each other is 1 meter. Firstly, we made button marks on the corners point , so with the help string we can mark our intermediate button marks. Secondly, during installation of button marks , we have to keep in mind about the slope that we provide in the floor and accordingly to the slope , thickness of the button marks decreases. Use of spirit level is must as with the help of this , we can check the level of the button marks in both direction ( latitude and longitudinal ).
STEP 3 : PREPARAING THE MIX AND TILE FIXING :- ( FLOOR TILES ) Generally , the mix prepared for tiling can be 1:4 ,1:5 or 1:6 , as per the requirements. Mechanical mixing ( Mixer) is preferred for mixing instead of hand mixing as proper mixing of cement + sand + water takes place in the mixer. Also , cement slurry ( 0.6/0.8 – 1 ) is prepared and used during tile fixing by spreading between mix and tile. This cement slurry acts as a thin , smooth layer that fills gaps and enhances tile adhesion. These materials ensure proper alignment and provide a strong base for tiling application. For the floor tiles ( 600*600) , cover – up-to 40 mm and 3 mm spacer are used.
The tiles along the border will be fixed after the full tiles have been fixed. The level of tiles should be checked every time a tile is laid using spirit level. Any undulation can be leveled using a rubber hammer. A skirting of 10-12 cm height is provided with the tiles , on the walls as per the requirements. At the end , the floor tile grouting is done and different – different chemicals are used. Example : Tile joint filler and tile joint additive ( ROFF ). After the Grouting , sufficient curing should be done for a minimum of 3 days and then protection sheets are laid to prevent the tiles from damaging .
Title text After you hit your Title text After you hit your Title text After you hit your Title text After you hit your Introduction After you hit your content here, or by copying your text
Title text Title text 01 02 Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste Introduction After you hit your content here, or by copying your text
Please enter your Title text Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste your content in this box after hitting here, or by copying your text, choose to paste your content in this box after hitting here, or by copying your text, in this box Choose Paste in this box After you hit your content here, or by copying your text, choose Introduction After you hit your content here, or by copying your text
Please enter your Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to Please enter your 01. Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to Please enter your 02. Project Overview After you hit your content here, or by copying your text
Please enter your Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to Title text After you hit your content here, or by copying your text, choose paste in this box Title text After you hit your content here, or by copying your text, choose paste in this Title text After you hit your content here, or by copying your text, choose paste in this 01 02 03 Project Overview After you hit your content here, or by copying your text
Your content is hit here, or by copying your text, in this Title text Your content is hit here, or by copying your text, in this Title text Your content is hit here, or by copying your text, in this Title text Your content is hit here, or by copying your text, in this Title text Project Overview After you hit your content here, or by copying your text
Architectural design Please enter your 03
Please enter your After you hit your content here, or by copying your text, choose paste in this box 20XX - After you hit your content here, or by copying your text, choose 20XX - After you hit your content here, or by copying your text, choose 20XX - After you hit your content here, or by copying your text, choose 20XX - After you hit your content here, or by copying your text, choose Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box After copying your text, select Paste in this box Architectural design After you hit your content here, or by copying your text
Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box 01 02 Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box 03 04 Architectural design After you hit your content here, or by copying your text
Please enter your Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste your content in this box after hitting here, or by copying your text, choose to paste your content in this box after hitting here, or by copying your text, in this box Select Paste in this box Title text Title text Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, choose to paste your content in this box after hitting here, or by copying your text, choose to paste your content in this box after hitting here, or by copying your text, in this Architectural design After you hit your content here, or by copying your text
Structural design Please enter your 04
Please enter Your title text Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, select Paste in this box After hitting your content here, or by copying your text, Select Title text Title text Title text Title text After you hit your content here, or by copying your text After you hit your content here, or by copying your text After you hit your content here, or by copying your text After you hit your content here, or by copying your text Title text After you hit your content here, or by copying your text Structural design After you hit your content here, or by copying your text
03 Please enter your Your content is hit here, or by copying your text, in this box choose paste After you 01 Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box 02 Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box 04 Please enter your Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box Structural design After you hit your content here, or by copying your text
Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box By copying your text, select Paste in this box After hitting your content here, or by copying your text, Select Paste in this Please enter Your title text Title text After you hit your content here, or by copying your text, choose paste in this box Structural design After you hit your content here, or by copying your text
Design summary Please enter your title text When you copy & paste, choose "keep text only" option. 05
Please enter your title text Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this box After copying your text, select Paste in this box After you hit your content here, or by copying your text Your content is hit here, or by copying your text, in this box choose paste After you hit your content here, or by copying your text, choose paste in this box Design summary After you hit your content here, or by copying your text
Your content is hit here, or by copying your text, in this box Please enter your Word Title text After you hit your content here, or by copying your text Title text After you hit your content here, or by copying your text Design summary After you hit your content here, or by copying your text
THANKS Thank you for watching Reporter: XXX Date: 20XX.XX