History of road

AbhishekDixit64 21,450 views 18 slides Sep 27, 2016
Slide 1
Slide 1 of 18
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18

About This Presentation

HISTORY OF ROAD DEVELOPMENT HISTORY


Slide Content

ABHISHEK DIXIT Highway Engineering History of Road Development

History of highway engineering Ancient Roads B y foot These human pathways would have been developed for specie purposes leading to camp sites, food, streams for drinking water etc. The next major mode of transport was the use of animals F or transporting both men and materials. Since these loaded animals required more horizontal and vertical clearances than the walking man, track ways emerged.

The invention of wheel Led to the development of animal drawn vehicles. Then it became necessary that the road surface should be capable of carrying greater loads. Thus roads with harder surfaces emerged. To provide adequate strength to carry the wheels, the new ways tended to follow the sunny drier side of a path. These have led to the development of foot-paths. After the invention of wheel, animal drawn vehicles were developed and the need for hard surface road emerged. Traces of such hard roads were obtained from various ancient civilization dated as old as 3500 BC. The earliest authentic record of road was found from Assyrian empire constructed about 1900 BC.

History of highway engineering Roman roads The earliest large scale road construction is attributed to Romans who constructed an extensive system of roads radiating in many directions from Rome. Appian way which was build by Romans in 312 B.C. extended over a length of about 580 KM.

History of highway engineering Features of Roman roads An earthed road with a graveled surface. They were build straight without any gradient. The soft soil from top was removed till the hard stratum was reached. The total thickness of road section worked out as high as 750 mm to 1200 mm.

French roads or Tresaguet road The next major development in the road construction occurred during the regime of Napoleon. The signicant contributions were given by Tresaguet in 1764 and a typical cross section of this road is given in Figure 2:2 . He developed a cheaper method of construction than the locally unsuccessful revival of Roman practice The pavement used 200 mm pieces of stone of a more compact form and shaped such that they had at least one at side which was placed on a compact formation . Smaller pieces of broken stones were then compacted into the spaces between larger stones to provide a level surface. Finally the running layer was made with a layer of 25 mm sized broken stone.

Telford Construction The next development was done by Scottish engineer Thoms T elford (1757-1834). The foundation was prepared for a road with width of 9 m and it was levelled. Large size stones of width equal to 40 mm and depth 170 to 220 mm were then laid. After filling the spaces between foundation stones, two layers of stones having compacted thickness of 100 and 50 mm respectively laid in the center of 5.4 m. of width. The top layer of road was made of 40 mm thick binding layer of gravel.

British roads or Macadam Road The British engineer John Macadam introduced what can be considered as the first scientific road construction method. Stone size was an important element of Macadam road. By empirical observation of many roads, he came to realize that 250 mm layers of well compacted broken angular stone would provide the same strength and stiffness and a better running surface than an expensive pavement founded on large stone blocks. Thus he introduced an economical method of road construction. A typical cross section of British roads is given in Figure 2:3.

Difference between Telford and Macadam road construction Parameter Telford Macadam Subgrade slope Horizontal 1 in 36 Foundation stone From 170 mm to 220 mm. From 50 mm to 100 mm. Base course Two layers of broken stones One layer of broken stone Surface course 40 mm thick with slope 1 in 45 50 mm thick with slope 1 in 36 Thickness of cross section 410 mm at center and 350 at edge Uniform 250 mm only.

History of highway engineering Modern roads The modern roads by and large follow Macadam's construction method. Use of bituminous concrete and cement Various advanced and cost- effective construction technologies are used. Development of new equipment's help in the faster construction of roads. Many easily and locally available materials are tested in the laboratories and then implemented on roads for making economical and durable pavements.

Modern roads British roads French roads Roman roads Flexible Pavement Concrete Pavement
Tags