ICF Bogie Details by Yadvendu

9,337 views 88 slides Oct 10, 2016
Slide 1
Slide 1 of 88
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85
Slide 86
86
Slide 87
87
Slide 88
88

About This Presentation

ICF Bogie of Indian Railways Passenger Coaches


Slide Content

ICF Coach ComponentsICF Coach Components
Jogendra Yadvendu
Dy.CMM-MTN, CR
yadvendu@gmail. com

Virtual WareHouse !
The dilemma

Materials Management or a stores Cader ?

Materials Management sounds
impressive !

Do we know the product we buy day in
and day out ?

Have we seen the product ?

Well, this is not really a part of my job

My job is to tender & place purchase order.


How many times we call for the
drawing, study it and only then float a
tender ?

How many times the T.C. has the
knowledge of the product it is
deliberating about ?

A stores guy has an idea about the
product. A materials manager knows
the product.

The Dust Bin !The Dust Bin !

We all have an idea about the dustbin used in
coaches

Do we know the dust Bin ?

Purchased as per ICF Drg No WGSCWAC-6-
4-005 ALT. l/4

There are total 49 sub components in it. Yes 49
!

Majority of the components are of IS: 2062
steel


Some components such as Pedal Lever &
pedal end piece is of IRS M41

Which fabricator will obtain IRS M41
steel for the few components ?

Result: Either a vigilance case or
harassment to the vendor

Why not change the material spec for
the Dust Bin.

Well, that’s not my Job !
The DustBin

Virtual WarehouseVirtual Warehouse

The writing is on the wall !

No awards for guessing !

There is limited or no attempt to know the
product before tendering or at the time of
placement of order !

Common refrain: Time nahi hai !

Locomotive sheds/ Workshops are not far away.

Will is lacking to know the product.

It is not considered important

Virtual WarehouseVirtual Warehouse

Busy officers not able to go to the
shed /Workshop to see the product.

An attempt has been made to bring the
product to the confines of Air
Conditioned environs .

Why know the components ?Why know the components ?
Most purchase officers are trained engineers.
However, most officers cannot identify the item
they are buying.
Totally dependent on decision of user
department for very basic issues.
No role in vendor development.
No role in inspection of stores at depot level
Hence , the non technical Tag.
No professional satisfaction.

Materials Management or Stores ?Materials Management or Stores ?
Stores ? Warehouse Manager ? Clerical ?
Materials Manager: Knows about Material
Types of steels , Rubber & Why to use a particular one.
What is the component ?
Where is it used ?
Why does it need replacement ?
How Can the frequency of replacement be reduced ?
Is there a better material available ?
Best time to learn is when there is a crisis.

How does one start ?How does one start ?
Go to the basics.
Macro to micro.
Assemblies to Sub Assemblies.
Sub Assemblies to components.
25 KV to movement of a wheel
Load transfer in rolling stock
Transfer of Buffing Gear forces in a rolling stock
No one is too old to learn.

What is the minimum web thickness of the ICF Wheel ?
A. 50 mm
B. 150 mm
C. 250 mm
D. 350mm
E. > 350 mm
What about LHB Wheel ?

Wheel ProfileWheel Profile

Minimum Web Thickness of Minimum Web Thickness of
WheelWheel
ICF : 19 mm
LHB: 13 mm

What is the difference ?What is the difference ?
Lower Spring Seat
Top Spring Seat

ICF BogieICF Bogie

Main Assemblies in ICF BogieMain Assemblies in ICF Bogie
Bogie Frame
Bogie Bolster
Primary Suspension
Secondary Suspension
Axle Box Housing
Lower Spring Beam
Center Pivot Arrangement
Anchor Link Assembly
Wheel Set arrangement
Brake Beam Assembly
Axle Pulley & Alternator arrangement

Bogie FrameBogie Frame

Bogie FrameBogie Frame
Fabricated structure made up Mild steel channels
and angles welded to form the main frame of the
bogie.
Divided into seven sections. The central section
has Bogie Bolster at the bottom & connects the
Body Bolster of the coach through the center Pivot
Various types of brackets are welded to the frame
for supporting bogie components.
Mechanical code silent about bogie
condemnation.
Bogie POH periodicity reduced to 9 months.

Bogie Bolster

Bogie BolsterBogie Bolster
Bogie Bolster
Side Bearer Housing
Bronze wearing Piece
Wearing Plate
Brackets for Anchor Link-Design Issue.
Silent Block for center Pivot-History
Center Pivot Sleeve-

Primary Suspension

Primary SuspensionPrimary Suspension
Axle Box Housing-Design Changes
Washers- Hytrel or Rubber-Case Study-Delrin ?
Lower Spring Seat- Honning
Axle Box Spring- Three categories
Dashpot Cover- Shop Practice
Axle Box Guide- Two Holes,cap
Guide Bush- Development
Guide Ring
Circlip-
Rubber Packing Ring
Air Vent Screw

Axle Box Guide ArrangementAxle Box Guide Arrangement

Secondary SuspensionSecondary Suspension

Secondary SuspensionSecondary Suspension
Bogie Bolster
Lower Spring Beam-Plank-AC & NAC
Rubber Washers- Upper & Lower-
Hytrel
Secondary spring
Shock Absorber: 600 & 900 Kg. ?
Flange for Shock Absorber
Equalizing Stay Rod- 13 T & 16 T
Anchor Link- Shop Practice
Silent Block for Anchor Link- History

Axle Box Arrangement

Axle Box HousingAxle Box Housing
Collar for DM Roller Bearing
Rear cover for Axle Box- V Groove
Labyrinth Ring
Nitrile O Ring
Woolen felt- Density Issue
Bearing
End cap
Locking Plate
Locking Bolt
Front Cover- History & Practise
Front cover Bolts

Front & Rear Cover Assembly

Lower Spring Beam

Lower Spring Beam AssemblyLower Spring Beam Assembly
Trapezoidal Section
Fabricated Member
Connected to Bogie Frame with BSS Hanger
Connected to Bogie Bolster with Anchor Link
Receives vertical load of coach through bogie
Bolster & secondary springs
Transfers load to Bogie Frame through BSS
Hanger.

Center Pivot AssemblyCenter Pivot Assembly

Center Pivot AssemblyCenter Pivot Assembly
No vertical load transfer.
Acts as a center of rotation
Transmits tractive/Braking
forces only
Center Pivot
Silent Block for center Pivot
Center Pivot Sleeve

Anchor Link Arrangement

Anchor Link arrangementAnchor Link arrangement
Consists of Anchor Link & Silent Block
Seamless tube welded with Cylindrical
housing
Anchor link Bracket for Bogie Bolster &
Bogie Frame.
Holds the Bogie Bolster to the Bogie
Frame
Two anchor link per Bogie
Permits Bogie Bolster to rise , fall & sway.

Wheel Set assemblyWheel Set assembly
Wheel
Axle
Pulley Rubber Pad- Historical Data
V Grove Pulley: 4 & 6 Groove
Pulley Bolts- Karnavati Accident
V Belt

Brake Beam AssemblyBrake Beam Assembly

Brake Beam AssemblyBrake Beam Assembly
Brake Beam: 13 T & 16 T-- Myth
Brake Head- Types
Brake Block- Types
Bushes: Nylon & Phenolic ( Issues )
Brackets
Safety wire rope (Rajdhani ?)
Block Hanger

Draw Gear ArrangementDraw Gear Arrangement

Draw Gear ArrangementDraw Gear Arrangement
Draw Hook
Draw Bar with castle Nut
Draft Key
Screw Coupling
Draw Bar Springs
Yoke
Yoke Housing

Draw GearDraw Gear
Screw Coupling- Spares
Draw Hook – 60 to 75 Ton
Draft Yoke
Draft Key
Draw Bar & Castle Nut
Rubber Buffer Spring
Manufactured from IS:5517-93 Grade 35
Mn6Mo3.
Proof Load 75 Ton
Breaking Load 130 Ton

Contd.Contd.
Specially heat treated to obtain the desired
strength. Not to be heated above 550 deg.
No tempering allowed.
Only yoke can be reclaimed.
 No reclamation of any draw gear
components permitted.
Load application gradual, hold for 2
minutes. No permanent set .
No creep motion permitted. In pins and
oblongity in holes.

Buffer HeightBuffer Height
Maximum height from rail level(Loaded)
MAX- 1105 mm
MIN - 1090 mm
Reason for different Buffer Heights ?
A. Wheel tread wear .
B. Different Types of Springs (Green, Blue,
Red)
Adjustment- How ?
Use compensating Ring & Packing Ring.

Buffer Height AdjustmentBuffer Height Adjustment
Use Packing Ring under the flange of Lower Spring
Seat.
Lowest wheel diameter permissible is 836 mm.
Compensating ring to be used based on the tare weight.
Check for height of bolster top level from the rail level.
Provide packing ring below the axle spring if Buffer
height requires further adjustment.
Total height of Axle spring and compensating ring <
295 mm.
Minimum clearance of 40 mm between the Axle box
wing lug & Safety strap

Rolling GearRolling Gear
Wheel. Drawing No. W/WL/1660. Spec.
IRS R-19/93 Part II
Axle
Roller Bearing 22326 / C3 130 mm bore

Rolling Gear ComponentsRolling Gear Components
End Locking Plate
End Locking Bolt
Felt Ring- Why Important ?
Retaining Ring
Collar
Rear & Front Cover- Historical Data
Axle Box Housing- Case of Hytrel Washer

Roller BearingRoller Bearing
Outer Race, Barrel Rollers, Inner Race
Self Aligning properties.
Can take care of radial, axle, complex loads.
Suitable for Vibrations & Shocks.
130 mm bore dia.
Dismount every POH or 2 Lakh Km.

Air Brake SystemAir Brake System
6
6
5
5

Air Brake Components Air Brake Components
Feed Pipe
Brake Pipe
Common Pipe Bracket
Intermediate Piece
Cut off Angle Cock
Three way dirt Collector
Brake Cylinder- BMBC & N-BMBC
Auxiliary Reservoir
Distributor Valve
Isolating Cock
PEASD
PEAV
Check Valve

Principle of Air BrakePrinciple of Air Brake
FP Pressure 6 Kg./Cm Sq.
Auxiliary Reservoir 6 Kg./Cm Sq.
BP Pressure 5 Kg./Cm Sq.
Control Reservoir 5 Kg./Cm Sq.
Braking by dropping air Pressure in B.P.

Brake ApplicationBrake Application
How.
Control Reservoir Disconnected from B.P.
D.V. connects the Auxiliary Reservoir to Brake
Cylinder & Brake cylinder piston moves out.
Auxiliary Reservoir is continuously charged with
6 Kg pressure from F.P.

Brake ReleaseBrake Release
Recharge B.P with 5 Kg pressure through
drivers brake Valve
D.V. isolates brake cylinder from Auxiliary
reservoir
Brake cylinder Piston moves inwards.

Common Pipe Bracket & Intermediate PieceCommon Pipe Bracket & Intermediate Piece
Common Pipe Bracket: Mounted on under
frame & suitable for all types of D.V.
Intermediate Piece: Mounted on CPB to fit
D.V on CPB.. Blanks all holes on CPB other
than required for a particular D.V. IP is
specific for each D.V.

Air Brake HosesAir Brake Hoses
F.P Hose: Maintains connectivity along the
train.
F.P. : White
B.P. Green.
Testing at 10 Kg./ Cm2

BMBCBMBC
8 “ instead of 14” Brake Cylinder
Four BC per coach instead of 2 earlier.
External Slack adjuster removed
K type Brake Blocks used.
Cylinder has built in slack adjuster.
M.A. of 7.644 & 8.40 for NAC & AC
Coach.
15 mm pneumatic pipe.

Brake BlocksBrake Blocks
Low friction composite Brake Blocks.
Uniform coefficient of friction. 0.25 for k Type &
0.15 for L type.
Reduced wear. Max 12 mm
Less noise.
Less weight

Brake Head with Brake Block & Brake Shoe KeyBrake Head with Brake Block & Brake Shoe Key

Brake HeadBrake Head
•Brake Head holds the Brake Block
•Brake Shoe Key is used for
mechanical interlocking
•Two types of Break Head based on
the Brake Block.
•L type Brake Blocks use ICF Brake
Head
•K Type Brake Blocks use IGP Brake
Head

Brake Block ComparisonBrake Block Comparison
Parameters Type of Brake Blocks
L K CI
ApplicabilityUnder frame
B.C.
BMBC V.B. & Under
Frame B.C.
Speed 110 KMPH 110 KMPH 140 KMPH
Coefficient of
friction
0.13 0.25 0.13
Weight 3 Kg. 3 Kg. 9 Kg.
Braking
Distance(110
KMPH, 18 C)
905 800 905
Weight reduction 492 Kg.
No of Pins 102 843 Kg. 102

Inner & Outer Head Stock

Draw Gear ArrangementDraw Gear Arrangement

Head stockHead stock
Head stock : Two Types. Inner & Outer
connected by Center Buffer Stiffener- Hole ?
Under frame supports various equipments
End section has four vertical pillars of box
section
They are connected transversely by Z section
members

Draw Bar with Draft Key Draw Bar with Draft Key

Floor DetailsFloor Details

Shell Components-Under Shell Components-Under
FrameFrame
Sole Bar- Negative Camber
Outer & Inner Head Stock
Turn Under (Why Oblong Holes)
Body Pillar – RH & LH
Tubular Frame
Trough Floor – MS to SS

Body Pillar, Sole Bar & Turn UnderBody Pillar, Sole Bar & Turn Under

Buffing GearBuffing Gear

Buffing GearBuffing Gear
•Buffers of 1030 Kg-m Capacity used to IRS-M 10 Spec.
•Buffer Assembly
•Buffer Casing- Cracks on line
•Buffer Plunger: Repair Practice
•Rubber Buffer Pads- Single pad to G4
•Buffer Spindle
•Destruction Tube
•Recoil Spring
•Recoil Spring Parting Plate
•Recoil Spring Washer
•Buffing Spring Parting Plate
•Face Plate- Hardfacing & Hytrel
•M24 Hex Head Bolt.

ShellShell
Made of a framework of hoops, x beams, BSP,
roof Car lines, .
Longitudinally by sole Bar, Waist Rail, CAR Rail.
2mm CR sheet makes the skin.
1.6 mm CR sheets makes the roof.
2mm CR corrugated trough floor is used.
Tubular structure provided in place of trough floor
at the lavatory area.

Shell Components- Super Shell Components- Super
StructureStructure
TRA Ventilator ?
Door Handles
Door Pivot- 100 day sick marking
Body Bolster- Repair
Center Pivot
Water Tank- 2 piece
Floor Channel- MS to SS

PaintingPainting
Paint Schedule “A”
Paint remover-Strip to bare metal every 5
th
POH
Use petroleum solvent to remove paint remover IS: 1745
Sand paper
Red oxide zinc chromate IS: 2074-92 DFT 25 micron.
1
st
coat of brushing filler IS:110-83 , DFT 30 micron
Apply knifing stopper putty IS 5083: 88, sport application & wet
rubbing
Second filler coat IS:110-83 DFT 30 micron
Wet rub with Bone Cuttle & emery paper SiC 120 & 220 No.
Under coat IS: 8662-93 DFT 25 micron
Rub with 320 paper & enamel IS: 8662-93
Rub 400 No paper , Second coat IS:8662:93 DFT 20 micron

Train LighteningTrain Lightening
BG Coach
EOG SG MOG
SU
Under slung
RMPU
AC NAC
SU
Under slung
RMPU with
25 KV Alternator

Battery
Box
Fabricated from MS Sheets & Angles with
FRP Trays
BCT Battery Charging Terminal provided on Both
end of the Coach for external Charging
RJB Rotary Junction Box in the coach for control &
power supply to various equipments
EFT Emergency Feed Terminal at both end of the
coach to feed additional supply to adjacent
coach in case of emergency
TL Lamp25 W& 40 W lamps.
20 W , 110 V DC Tubelight

Axle & Alternator Pulley with V Belt & Alternator

Air-conditioning EquipmentAir-conditioning Equipment
Axle Pulley- Two Halfs
V Belt
Alternators 4.5 & 25 kw
Battery & Battery Box 120, 800, 1100 AH,
Compressor & Condenser Motor
Evaporator Motor
Compressor – Maneurope & Scroll
Condenser
Dehydrator & Liquid Receiver
Filters-
Thermostats- RMPU
Panel Board
Pre Cooling Unit

AlternatorsAlternators
Type of CoachAlternator Type
Non AC Coach4.5 KW, 37.5 A, 120 V DC
SG AC Coach
18 KW, 138.5 A, 130 V DC X
SG AC Coach 22.75/ 25 KW, 175/195 A, 130
V DC

TL Components
RRU Rectify 3 P AC output of Alternator through
DC Full Wave Bride Rectifier & regulate
output current
Battery6V, 120AH-Non AC BG SG Coach
2V, 120 AH, VRLA on NAC BG SG
2V, 1100 AH, 56 Cell, VRLA , 110 V on
coaches with RMPU
2V, 800 AH, Flooded Type on Under Slung
Split AC
120 AH, 24 V on EOG AC

Shop Manufactured ItemsShop Manufactured Items
•32 mm Plate
•Anchor Link Bracket for Bogie Frame
•Anchor Link Bracket for Bogie Bolster
•Pull Rod
•Thickener for Alternator Bracket

25 mm Plate
Bottom Pivot for BEML Coach
Yoke Bracket for trimmer Bar
•20 mm Plate
•Lever Hanger Short
•Lever Hanger Long
•Vertical Lever
•Hinge for Flap Door
•Milk Tanker Center Pivot Base Plate
•Face Plate for Buffer Plunger
•Center Pivot Cotter

16 mm Plate16 mm Plate
Bogie Alternator Bracket Support Plate
Holding Device for Vestibule Foot Plate
Packing Plate for Draft Link
Horizontal Levr for Power Car
12 mm Plate
Plate for Destruction Piece
Hinge for NMG
Closing Palte for AB Guide
Lever for Hand Brake Pull Rod
Support plate for Vestibule Foot Plate

Compensating Ring
Brake Cylinder Bracket
Buffer Head Stock patch
IGP Brake Head Stopper Piece
Packing Plate for AB Housing
Inner Head Stock
Base Plate
Trimmer Bar
Modified Brake Head Piece
Fulcrum Bracket
10 mm Plate

Equaling Stay Rod Bracket Side Plate
Head Stock
Buffer Head Stock Patch
Eye Piece for UIC Vestibule
Compensating Ring
Buffer Bolt Stiffner
Battery Box Knee
Side Berth Pivot
Plian washer for rubber Bump Stopper
Bend Plate for side bearer
Packing Plate for AB Housing
8 mm Plate

Water Tank Support Bracket
Lug for Brake Beam Safety Strap
Comensating Ring
Wire Rope Bracket
Common Pipe Bracket
Stiffner Angle for Sole Bar
Formed Channel
C Channel
6 mm Plate

5 mm Plate
Sole Bar
Equalizing Stay Rod Bracket
Head Stock Inner
 C & U Channel
Rib of Brake Cylinder Bracket
Common Pipe Bracket Plate
Hinges for Seat Berth
Angle for Vestibule Foot Plate
Brake Beam Plate
Collar of Protective Tube
Clip for Anchor Link Bracket

Water Tank for BEML
Vacuum Reservoir for Double Decker
Center Pivot Top Plate
Foot Step for ICF
 C & U Tube
Center Pivot Cap
3.15 mm Sheet

2 mm Sheet
Trough Floor
Body Side Lower Panel
 U Tube
Z Type Car Line Moulding
UIC Vestibule Bracket
 Z Pillar
 Body Pillar , Right & Left
Turn Under

1.6 mm Sheet
Z Molding
Half Round Roof Carline Patch
Waist Rail
Side & Stiffener Angle for Battery Box
Battery Box
Moldings of various sizes.
Wall Protector
Wheel Tag
Locking Plate for Anchor Link

?