IP Procurement Conference and Development.pdf

Marshallja 17 views 21 slides Jun 27, 2024
Slide 1
Slide 1 of 21
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21

About This Presentation

The document is about the development and procurement of BAKO Lam, a new type of glass for architectural purposes, and the process of testing and certification for its use in building construction. https://www.slideshare.net/slideshow/comments-on-glass-conference-ip-procurement-development-pdf/26992...


Slide Content

Glass Conference
IP Procurement &
Development
BAKO Lam CERTIFICATION
MDIA
BAKO Lam
Certification Results
Contents
V1 Fenestration, Façade, Auto/Home/Interiors
V2 Intellectual Property
V3 Construction Means and Methods
“A new legacy in Building has begun,”
Alex Marcus
2035

Topics for Delivery of the BAKO Lam Agreement
Product
DefinitionsV1
Intellectual
PropertyV2
Construction
MechanicsV3
Contents
V1 Fenestration, Façade, Auto/Home/Interiors
V2 Intellectual Property
V3 Construction Means and Methods
New Methods Defined

Building Today for
Tomorrow’s
Outcomes
•Glass Systems
•Glass Infrastructures
•Building with Fabrication
Theory
•Long-Range Planning
•PortalSystems
Granular Glass is the underlying
component of everything that can be
emulated with properties and attributes
to imitate any material. Laminate is a
great example of this entire prophetic
story of the New Creation from the Sea of
Glass.(Rev15)

What will Laminate
Design Accomplish?
Fenestrations: Curtain Wall
Fenestrations: Doors, Windows
Façade*
Buildings now in Pittsburgh, PA
* Façade: color change to match Tenant/Host
Granular Glass for Laminate Design will
enhance the architectural product
services market by offering a plethora of
feature intensive building compositions
that supply numerous warranted
protections for enhanced building life and
lift security. This supplies certification.
NEW
The invested package for BAKO Lam will
be certified when both prototype and production book delivery is certified, and this will guarantee an equity treatment for
their product entry into the advancing
market for glass in ark mode of design.
Homeowners will have enhanced confidence in the remainder of this
century, once these features are put into place. Warranted properties are excellent.
Timeline
Due 2035
Preliminary Research
c. 1970
c. 1984
Note: properties include self-cleaning mechanics

Ark Science
Defining Bands and Properties
NEW
Note: properties include self-cleaning mechanics in the advanced compositional stage
Packaging Instances is yet another art to the portal science
And there is no limit to the materials that it can emulate
Granular Glass for Laminate Design will
use portal instances to achieve the
superior quality of design and build that
engages matchless quality for the pursuit
of excellence in the school of building.
But notice that we are using these
descriptions now at the beginning or
primary level of this school.

Theoretical Prototype
y = 75,147,612.70044x
2
- 361,290,323.75558x + 518,440,740.28943
R² = 0.77972
-
500,000,000.00
1,000,000,000.00
1,500,000,000.00
2,000,000,000.00
2,500,000,000.00
Standard &
Tempered
Low-E &
Colored/Texture
Change
High Impact &
Hurricane
Acoustic &
Switchable
Fire Resistant &
Insular Value
Compositional Sum of Features
Band Flay Kilt Candlestone Theoretical Sum Poly. ( Theoretical Sum )
x 22.11= 44.6B
Unmotivated (unitary volume)

Starting
with a plait
delivery
(Oats are next)
•Determine prototype properties that can be associated
•Determine product delivery
•Determine the product warranty and pricing
MAGI & MARCUS Eng suggest
Bako satisfy their own customers
first with the new prototype
matrix in plait. Also test with hyD
Auto and Installers.(Test Plan)

Test Plan- 1
Assist: Magi & Marcus decide to create a reviewer
team to perform preliminary review of BAKO
Laminate to see if they can improve the initial
results before paying for expensive prototype
testing. They tied the original test to the IM
requirement via reviewer ratings
Decision: They selected 5 of the reviewer
members to assist BAKO with expert advice in
increasing the rating on the plait laminate to
start. And then submit to more critical lab
testing.
The importance
of a warranted
storm safety
material can not
be overrated
Focus on Key Design
Features First.
Each reviewer is paid $500 for
initial review and second pass
IM
4-6 Weeks50k
M&M’s TEST TEAM
runs tests, and
shows film and
reports, product
samples for a rating
Test
2nd

Test Plan - 2
Industrial
Physics
Lab
•Assist: Once Test Plan-1 is satisfied, Magi & Marcus
submit to the critical Lab physics tests which will also
come with a report for recommended enhancements.
None of their products is considered a T&M product. So,
the more consequential LIFT test is not required. Candle
Stone is not being tested at this time but will proceed
later with the Installer Team.
10-12 Weeks1.5m
Decision: The Lab is aware that the more
extensive oat testing is coming up and wants to
put more definition on the oat attribution than in
the plait association. So, they advise David to
withhold some of the consequential texture and
contour of design recommendations.
Bako is
permitted
to sell this
product
Test

Test Plan-3
Oats Requirement 1
•This long-term commitment is an agreement to ostensibly
represent themselves within the Portal Plan as a Preferred
Vendor and member of the Magi & Marcus Executive Team as
hyD and the Installers Group support the Installation; At this
point, the agreement will become enforceable except as if the
terms fail through no fault of their own. However, their
investment is secured through the Morning Star
•They need to develop an Oat Brand in the hybrid sense of
coatings and resin applications first and test it for each
associated building requirement
Oats Requirement 2
•Develop the wave and light version of oats that is fully
developed within the instance of portal arrangements and can
carry all warranty product requirements within the full scope
of the assignment. After this Candle Stone is produced with
all features proofed and passable conduit achieved.
•Assure that there is an appropriate delivery mechanic that is
fully tested and can mitigate all risk associated warnings
including unproven method.
Because of the cost of the
Brand, Oats is a subscription
product that is married to the
suite of Magi & Marcus ASP*
*Architectural Service Products
BAKO must assign a full-time team
BL-GO
18-24 Months1.5m x 8= 12 million
They will produce this from a star-based foundry method
unique to the Morning Star
The lab cost of
this is covered
under the portal
arrangement
Test
Test
Team

Final Steps
•Remaining Steps
include certifications,
delivery and site
acceptance, also
remote brick assembly
The remaining steps to the process work into the ongoing project
review formulation that will upgrade the product according to
customer recommendations and new design features.
This is the ongoing nature of the work that Magi & Marcus Eng have
accepted as a business requirement and so they should be able to
have a smooth-running operation. Going fully remote is a future
task.
Timeline
Due 2035
Timeline
Start 2032
Belinda
Blevich has
transferred to
the BLGO
Team with her
husband
From Test Plan 1 to Final Steps
Filling in the rest of the team
are 3 BAKO Reviewers
With highly specialized skills.
They have a unique blend of
knowledge and where it is
lacking, they can acquire it.
The Variegated Lens Treatment is highly required at this stage.
Team

Contents
V1 Fenestration, Façade, Auto/Home/Interiors
V2 Intellectual Property
V3 Construction Means and Methods
School of Science and Administration: Metric Assessments and Property Arrangements
Tasks: Update Financial Forward for M&M
Develop BAKO Forward & Portal Area
Valuation, New equipment Associate Storyboard to Team Writer Partner Review
SOLVED
Tech Writer comes from BAKO staff

Contents
V1 Fenestration, Façade, Auto/Home/Interiors
V2 Intellectual Property
V3 Construction Means and Methods
School of Building
and Remote Delivery
Sciences
Meet: David Aaron Magi, son of the Partner
Tasks:
Changes in the
Infrastructure
Impact on Building
Repair/Maintenance
/Construction
New Sciences of
Delivery
Tools and Materials
match to record all
activities; all glass is
confected with
emulation properties
Conveyance Methods

Forward Looking
Event Planning Discussions
1.Beyond the Tried and True to the next Platform of
Development– good mentorship.
2.Glass Systems: What to Expect
3.On Site Conveyances producing Glass Assembly
through mobile portals
4.Morning Star Certifications
Bidding, Contracts, Delivery
How the Supply Chain Operates
New Technology
Portal Arrangements
Timelines
Glass Conference
IP Procurement & Development
2024 Fabrications
2035 Fabrications
Build pipes
How to
Convene in a
BIG WAY
BIG SIMULATION
EVENTS LEAD TO
WIDE PARTICIPATION
AND LOWER COSTS
New
Methods

Milestone Dates of
Origination
These are Supply Chain shifts for
the Milestone Dates that built the
product cartography. The product
dates are likely to shift with re-
specification, so we are initiating
the project with tentative finish
dates for the lens and lead times.
Brij Consulting, LLC Jean Marshall6/27/2024 15
mMLens Positions
Milestone Related
m
m M
M
M
10 yrs. ending 8/22/2035
8 yrs. ending 11/26/2051
8 yrs. ending 2/1/2062
4 yrs. ending 6/3/2027m
M
M
M
- 4 Agile years
Lens Commitment Dates
Appendix I
Table <or> SA Associations

6/27/2024 Brij Consulting, LLC Jean Marshall 16
APPENDIX II

Brij Consulting, LLC Jean Marshall
6/27/2024 17
The document provides information about Bako Lam (Laminate)
and its potential entry into the supply chain of ark glass products.
It discusses the four enterprise areas for various applications of
laminated glass, such as Automotive, Fenestrations, Candle stone,
and Facades. The document also mentions the primary goals of
Bako Lam, which include developing the instance attribution for
laminates, task branding for easy identification, and finding
partners for simulations. It further highlights the areas of growth
for Bako Lam, the plan for product launch, the areas of focus
(production instance, multi-agency simulations and supply chain),
and the timeline for the company's activities. The document
concludes with a summary and mentions the upcoming
simulations report in Part II, which will provide more details about
the impact of Bako Lam on the glass industry.
Papers on the full glass
treatment of architectural
services in Ark Science
methods
Fig. 6
Fig. 3a
x,y
The Gate Fee also includes pipe
use and conveyance. This is
what permits the product to be
translated and then available
for replication from the
warehouse.
The Brick Process carries all
the same security measures
and eventually is the
condensed companion to the
M&M Eng Warehouse
A Review of the Matrix arrangement with the T&M calculator shows that M&M operate in the portal with a different wave frequency than BAKO. This makes the timing of recovery different for each
This Paper is dedicated to the transitional requirements of
BAKO Lam [in Union with Magi & Marcus Eng pursuit of
Glass Building in Ark Science,] in our continuing story
about their requirements. We are moving across the 50-
year timeline of the second part of the project where Portal
Building becomes inherent to glass projects and the teams
are determining the methods of transitioning to bigger
product instances from smaller forms of building with
fabrications. Preliminary Agreements and Justifications are
presented.
Allusion

Glass Outcomes from Double-Down
Digital Growth
Rules for Synergism
Portal Design Theory
Metric Map
Plan Disposal and Fair- Trade
Arrangement
Recent Papers on Project
Valuation and Scorecard
Arrangements
Brij Consulting, LLC | SlideShare
The document contains a series of papers
and presentations related to glass
concepts and algorithms. The contents
include discussions on topics such as
momentum in glass building, impact
engineering, continuous modeling,
synergies, instancing, remote cloud
assembly, simulations, portal design
theory, metric maps, and the future
projections of the glass plan.
Christmas, 2023
The document is divided into three parts:
Bookmarks, Golden Bricks, and Casting Crowns.
It discusses various aspects of glass projects,
including remote cloud assembly, metric maps,
scrum performance, golden bricks, hyD Auto,
casting crowns, and portal arrangements. ​ It
also mentions the importance of branding,
marketing, and simulations in these projects. ​
Additionally, the document contains a series of
papers and presentations related to glass
concepts and algorithms, covering topics such
as benchmarking, glass impact, green energy,
solid-state engineering, cloud-star evolution,
simulations, and more. ​
May 2024
18

196/27/2024 Brij Consulting, LLC Jean Marshall
19

Thank you
Mirjam Nilsson
[email protected]
www.contoso.com
20

Add a Slide Title - 3
6/27/2024 Brij Consulting, LLC Jean Marshall 21