Kaizen Examples

39,091 views 20 slides Jan 29, 2013
Slide 1
Slide 1 of 20
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20

About This Presentation

No description available for this slideshow.


Slide Content

All the employees are involved in taking Kaizen Shapath

Yogesh Vaghani, Director, Milton Plastics in an animated discussion with Frontline Em ployees

Director to Doorman - all are equally involved in doing Kaizen at GEMBA

Preventive Maintenance through Visual Management

Visual Management – Pigments stored in all the containers are visible and known Transparent containers

Through color coding, it is easy to know which tools and components belong to which dept.

PEEP (Place For Everything and Everything in its Place) When the person has taken a tool , he will place a token at the place that will let others know where the tool is now and with whom Token

Standard WIP Output Input Frontline workers are cleaning their workstations to keep their workplace dust-free Standard WIP has been kept near every workstation All the components have been color coded according to their functionality and stored at the point of use (POU) Color coding

This is an example of One Piece Flow Assembly Each and every component needed is available at a hands distance of the worker Plan vs. Actual production display board Light indicator to give signal Packaging Material at hands distance

Learning C enter - where all kinds of tools are kept to train the employees Worn out/Waste tools are kept in one line

SMED trolley All the tools required (related to the machine) to perform the changeover are available in SMED trolley. Big stand is available in the left corner where all the tools are kept that will be needed during changeover, it helps to avoid Muda of Motion & Transportation

SMED trolley contains all the tools required to perform quick changeover. SMED trolley has been parked only in the right area Responsibility has been assigned to Shift Fitter

Place for everything and every useful thing in its place (PEEP) Kanban system No stock out or over-stocking of material

Kanban Collection tray Once any material has been picked up for use, the Kanban card of the particular material will go into the Kanban collection tray. It will then be sent to purchase department at every 11 am & 4 pm daily for placing the replenishment orders

Whenever the operators need some material, they trigger the light that gives signal to Mizusumashi (Water Spider) who replenishes the required material in the workstation Mizusumashi (Water Spider) Light signal

Point of Use Storage (POUS ) with Kanban Responsibility assigned Kanban Card Kanban Board

Visual Management Count Free No Oil Drops on the Floor Name of the Oil stored Same color marking is done on M/C

Place For Everything and Every Useful thing in its Place (PEEP) in Table Drawer

Kaizen For kids (KFK)

Yogesh Vaghani discussing the importance of Kaizen with S chool Faculty
Tags