KEC JAIPUR SUMMER INTERNSHIP TRAINING PPT

VikashKumarMauray 15 views 28 slides Oct 06, 2024
Slide 1
Slide 1 of 28
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28

About This Presentation

KEC JAIPUR TRAINING PPT


Slide Content

Technology A presentation on SUMMER TRAINING At KEC International Ltd. SUBMITTED TO: Mr. DINESH BHATIA Mr. RAHUL GUPTA ASST PROF, ECE DEPT SUBMITTED BY:- HARSH SAINI (PIET/EC/13/517) EC- A, 28 DEPARTMENT OF ELECTRONICS & COMMUNICATION ENGINEERING POORNIMA INSTITUTE OF ENGINEERING & TECHNOLOGY ISI-6, RIICO INSTITUTIONAL AREA, SITAPURA, JAIPUR

CONTENTS Introduction Introduction of Industry Power Transmission Departments Production Process TPM References

INTRODUCTION A transmission tower is usually a steel lattice tower, used to support an overhead power line. Used in high voltage AC and DC systems. Manufactured in wide variety of shapes and sizes, typical height ranges from 15 to 55 meters. All the electricity stations, mobile networking, radio broadcasting and television antennas are connected via these towers. Power transmission tower takes up to two weeks to be completed.

Introduction of Industry KEC International ltd. which was known as Kamani Engineering corporation Ltd., was Founded by Ramjibhai Kamani in 1945. Established in 1967 at Jhotwara, Jaipur In 1982 this company was taken over by RPG enterprises. In 1984 this company was renamed as KEC International Ltd On e o f t he worl d ’ s l a r ge s t P o w e r T r a ns m iss i on E n g i neer i ng Procurement and Construction companies. Became first electric power transmission company in Asia.

Introduction of Industry Supplying 3/5 of India’s demand for transmission towers. Sup p l i e s T owers t o m o r e t han 4 5 c oun t rie s . M a j o r C l i en t s Of Company are USA, BRAZIL, ARGENTINA,AUSTRALIA etc. KEC today is a 4000 crore turnover flagship company of RPG group KEC has the largest tower testing station in the world. It is a matter of pride for KEC that it has been awarded ISO 9001 on April 26, 1995. and ISO 14000 on March 11, 2000.

Jaipur, Rajasthan Capacity 36,000 MTs per annum of lattice towers BRANCHES IN INDIA Nagpur, Maharashtra Capacity 55,000 MTs per annum of lattice towers Jabalpur, Madhya Pradesh Capacity 60,000 MTs per annum of lattice towers

KEC PRODUCTES:- TRANSMISSION CAB L ES RAILWAYS DISTRIB U TION TE L ECOM WATER T R EATMENT

Power Transmission Transmission towers are used to transmit power from one place to another . Major application areas: Mobile Networking Radio Broadcasting Television antennas Electricity transmission

SIMPLE STRCTURE OF TRANSMISSION TOWER Peak of transmission tower The portion above the top cross arm is called peak of transmission tower. Generally earth shield wire connected to the tip of this peak . Cross Arm of transmission A rm F o u n dati o n D a m per tower Cross arms of transmission tower hold the transmission conductor. Cage of transmission tower The portion between tower body and peak is known as cage of transmission tower. This portion of the tower holds the cross arms Fig 1: A transmission tower

Departmen t s Yard Quality Assurance Pre Production Fabrication Galvanizing Maintenance TPM

PRODUCTION PROCESSES Straightening Bending Punching Cutting Stamping Notching Drilling Galvanizing

TPM TPM is a productive maintenance implemented by all employees in an organization. TPM involves everyone in the organization from operators to senior management in equipment improvement.

Total = All individuals in the organization working together. Productive = production of goods that meet or exceed customer’s expectations. Maintenance = keeping equipment and plant in good condition at all times. TPM in three words:

 Breakdown maintenance  Preventive maintenance .periodic maintenance( time based maintenance) .Predictive maintenance  Corrective maintenance  Maintenance prevention Types of maintenance

 Repairs or replacements performed after a machine has failed to return to its functional state following a malfunction or shutdown.  e.g., an electric motor of a machine tool will not start, a belt is broken, etc.  Under such conditions, production department calls on the maintenance department to rectify the defect.  After removing the fault, maintenance engineers do not attend the equipment again until another failure or breakdown occurs. Breakdown maintenance

The primary goal of preventive maintenance is to prevent the failure of equipment before it actually occurs. It is designed to preserve and enhance equipment reliability by replacing worn components before they actually fail. It is a daily maintenance which includes cleaning, inspection, oiling and re-tightening of equipments. Preventive maintenance(1951)

 Time based maintenance consists of periodically inspecting, servicing and cleaning equipment and replacing parts to prevent sudden failure and process problems. Benefits:  Extended life and use of the equipment.  Reliable production at the times when machine is needed most. Periodic maintenance (TBM)

This is a method in which the service life of important part is expected based on inspection or diagnosis, in order to use the parts to the limit of their service life. Compared to periodic maintenance, predictive maintenance is condition based maintenance. Predictive maintenance

 Based on five Japanese words that begin with ‘S’, the 5S Philosophy focuses on effective work place organization and standardized work procedures. 5 S’s Sort :(Seiri) Set In Order:(Seiton) Shine: (Seiso) Standardize: (Seiketsu) Sustain: (Shitsuke) 5S Philosophy

The first S focuses on eliminating unnecessary items from the workplace . An effective visual method to identify these unneeded items is called red tagging. A red tag is placed on all items not required to complete your job. These items are then moved to a central holding area. This process is for evaluation of the red tag items. Sort :(Seiri)

second S focuses on efficient and effective storage methods and how to organize the work area. Strategies for effective Set In Order are painting floors, outlining work areas and locations, shadow boards, and modular shelving and cabinets for needed items such as trash cans, brooms, mop and buckets Set In Order:(Seiton)

Once you have eliminated the clutter and junk that has been clogging your work areas and identified the necessary items, the next step is to thoroughly clean the work area . Workers will also begin to notice changes in equipment and facility location such as air, oil, coolant leaks, fatigue, breakage, and misalignment. These changes, if left unattended, could lead to equipment failure and loss of production. Shine: (Seiso)

Now the first three S’s are implemented. Use standard methods to keep Sort, Set In Order, and Shine to a condition . Allow your employees to participate in the development of such standards. Standardize: (Seiketsu)

This is the most difficult S to implement and achieve. Maintain through empowerment, commitment, and discipline . Sustain focuses on defining a new status quo and standard of work place organization. Sustain: (Shitsuke)

Simplifies work environment reduces waste Improves quality Improves safety Provide self esteem for everyone in the organization. Benifits of 5 S’s

References [1] J.A. Martinez and F. Castro-Aranda, “Lightning performance analysis of overhead transmission lines using the EMTP,” approved for publication in IEEE Trans. on Power Delivery. [2] IEEE TF on Fast Front Transients (A. Imece, Chairman), “Modeling guidelines for fast transients,” IEEE Trans. on Power Delivery, vol. 11, no. 1, pp. 493-506, January 1996. [3] “Modeling and Analysis of System Transients Using Digital Programs,” A.M. Gole, J.A. Martinez-Velasco and A.J.F. Keri (Eds.), IEEE PES Special Publication, TP-133-0, 1999. [4] C.F. Wagner and A.R. Hileman, “A new approach to the calculation of the lightning performance of transmission lines – Part III,” AIEEE Trans. Part III, vol. 79, no. 3, pp. 589-603, October 1960. [5] M.A. Sargent and M. Darveniza, “Tower surge impedance,” IEEE Trans. on Power Apparatus and Systems, vol. 88, no. 3, pp. 680-687, May 1969.