REDEVELOPMENT WORKS OF
EAST KIDWAI NAGAR, NEW DELHI.
Kidwai Nagar (East) has been identified as one of the colonies for redevelopment as General Pool Residential Accommodation (GPRA) .
A redevelopment and densification project for a low density Government colony has been carried out in Kidwai Nag...
REDEVELOPMENT WORKS OF
EAST KIDWAI NAGAR, NEW DELHI.
Kidwai Nagar (East) has been identified as one of the colonies for redevelopment as General Pool Residential Accommodation (GPRA) .
A redevelopment and densification project for a low density Government colony has been carried out in Kidwai Nagar East by NBCC (India) Ltd. (National Buildings Construction Corporation Ltd.), on behalf of Ministry of Urban Development (MOUD_, in the heart of Delhi right opposite Delhi Haat & AIIMS.
Size: 9.08 MB
Language: en
Added: Jun 04, 2021
Slides: 36 pages
Slide Content
HUMAN SETTLEMENTS & PLANNING (ARCH 255) Amity School of Architecture & Planning REDEVELOPMENT WORKS OF EAST KIDWAI NAGAR, NEW DELHI Submitted to:- Prof. Vivek Walia GROUP MEMBERS AADYANT GUPTA NAMAN GARG DHEERAJ BUDHLAKOTI PRAKHAR MISHRA
Retrofitting Model (area >500 acres) Redevelopment Model(area>50 acres) Green-Field Model(area>250 acres) Pan-City Development Model(whole city ) STRATEGY & APPROACH FOR SMART CITIES
Redevelopment of old Government housing colonies has been identified as one of the strategies to overcome housing shortage. O p t im um u t i li z a t i on o f l and by appl y i ng a h i gh e r F l o o r A r e a R a t io (FAR) as permissible under the latest master plan 2021 norms. Ki dwai Nagar ( E a s t ) has been id e n t i f ied as one of t he c o l o n i es f o r rede v elop m ent as General P ool Re s iden t ial A cc o mm oda t i on (G P R A ) . B ack g r oun d
A redevelopment and densification project for a low density Government colony has been carried out in Kidwai Nagar East by NBCC (India) Ltd. (National Buildings Construction Corporation Ltd.), on behalf of Ministry of Urban Development ( MOUD _ , in the heart of Delhi right opposite Delhi Haat & AIIMS. Infor mat i on A b out P r oject
EXISTING STRUCTURES
EXISTING STRUCTURES
PLANNED DEVELOPMENT
PLANNED COMMERCIAL SPACE
PLANNED COMMERCIAL SPACE
Brief on Redevelopment of Kidwai Nagar (East)
The construction of the work was divided into 5 Nos. packages as given below:- I II Package I Commercial office space 4 block Package II Primary school-1 no., Sr. Secondary school-2 no’s, LSC-1, Lal Quarters, Banquet hall- 1 no., Type VII-61 qtrs., ( 09 Tower ), Type III IV V VI-192 qtrs., ( 10 Tower ) Package III Type-II (936qtrs.), (11 Tower), Type-III (1008 qtrs.), (12 Tower) Package IV Type V-680 qtrs. (12 Tower), Type-IV 606 qtrs., (7 Tower) Dispensary Package V Type-V-398 qtrs. (7 Towers), Type- IV 866 qtrs., (10 Towers) Methodology for Execution of Work:
Master Plan
Site Layout Plan
P l ot Area 86 Acres Area under Darya Khan Tomb 14 acres Area under Redevelopment 72 acres Car parking provided in basement 10639 nos Existing green area 13% Green area provided 47% Area Statement
Specification of Single Dwelling Unit Unit size 356.4 m 2 Circulation 42.8 m 2 T otal 487.5 m 2
S.No. Room Type Size (mm) 1 P A R oo m 5330 x 5190 2 Office 4545 x 6015 3 Living/Dining Room 9070 x 6415 4 Kichen 3570 x 4500 5 Worship Place 3385 x 1405 6 Family Lounge 4665 x 5240 7 Master Bedroom 3450 x 6700 8 Bed Room 3950 x 4560 9 Bed Room 3300 x 4615 Detail of Type-VII Dwelling Unit:
4% 21% 6% 31% 7% 3% 7% 21% C I V I L WORKS EARTH WORK R C C SHUTTERING REINFORCEMENT BRICK WORK FLO O R I N G FINISHING WORKS MISCELLANEOUS WORKS
Site View On 12 January 2015
Salient Features of the Project Self sustainable model with social infrastructure, Dedicated Cycle , Jogging Tracks & Parks. Open area over 76% including Lush Green cover in place of Existing 28% open area. “ WALK TO WORK ” concept, 10% of the residential units will be allotted to the office block users. Vehicle free Residential Zone Underground Parking for 10639 vehicles
Salient Features of Office Complex Towers - G+10 & G+4 Separate Entry & Exit from Ring Road Large Plazas within Blocks Access Control System High Speed Lifts Higher Floor Heights Direct Vehicular entry to Basements 100% Power Backup for Offices 100% Air-conditioned Office Spaces BTU Metering System Fire Fighting & Detection System
Salient Features of Residential Complex 78 Towers Walk able distance from nearest Metro Station Milk booths & ATM’s at every 200m Local Shopping Centre Primary & 2 Senior Secondary Schools Banquet Hall Dispensary Sprawling Landscapes with Gardens and Pathways Ki ds P lay A reas
SMART FEATURES Waste Water Management Plant Solar Heating System Solar Lighting System Solid & Green Waste Management Plant Preservation of existing trees & Development of more green areas. Rain Water Harvesting System Plastic waste to fuel converter plant Bio-digester Toilet Zero landfill Area
G R I H A Ra t e d Pr o j e c t . Solar Water Heaters and fitted Solar Street Lighting. LED fixtures. CNG Based Gensets. Use of DGU ( Double Glazed Units) Glazed panels which cuts Heat Transmission by 35%. 1500 mm wide balconies to act as shade. Dual Plumbing System. IBMS for Office Blocks. 12 Mtrs High Barricading all around Project site during Construction. Retention of Existing 33% Trees out of existing 2600. Proposed to plant 18000 Trees 12 Mtrs Green belt is being Provided all-around Complex . Environmental Features
Zero Waste - Working on Zero Waste policy right from Construction phase. Construction & Demolition Waste Recycling Plant In Situ with Zero Waste is operational. Zero Sewage - Bio-digester toilet installed for disposing human waste in eco friendly manners. Zero Discharge into Sewerage System. 2 Nos 1500 KLD Sewage Treatment Plant for Sewage treatment. Treated water will be reused for horticulture, flushing and cooling towers. Zero Litter - Solid Waste Management . No litter will go out of the colony including Plastic . PLASTIC WASTE will be converted into FUEL Zero Project
O r ganic W a s te Con v e r t e r e q uipments of 1. 5 tonne c apa ci t y f o r c o n v e r t i ng household organic waste to compost. Pallet Making Machine for converting horticultural waste into fuel pellets has also been installed. The pellets are used as fuel and compost is used for horticulture purpose. Approx. 2500 sq. ft. covered finished shed for plant & 1500 sq. ft. covered finished shed for segregation have been provided. 14 SOLID WASTE MANAGEMENT SYSTEM
W AS T E W A T ER T RE A T M ENT P L ANT 15 Use : Treated water is used for irrigation purpose through pipe network laid in the whole campus. Sludge cakes are used as manure with in the complex. Monitoring : Laboratory has been set up in the complex and on daily basis monitoring of BOD, COD, TSS and pH of treated water is being done.
T o w e r I Commercial Towers Tower I 30.09.2015 30.09.2015
Local Shopping Centre 30.09.2015 30.09.2015
Banquet Hall 30.09.2015 30.09.2015 Senior Secondary School
Construction & Demolition Waste Recycling Plant Objectives of C&D Waste’s Management Maximize recovery of recyclable C&D material(s). Maximize reuse of recovered material in construction activity. Minimize waste quantity that requires landfill disposal. Ensure the proper disposal of C&D materials that cannot be recovered. Increase life of sanitary landfill site(s) and Reduce in total costs of C&D waste management.
Construction & Demolition Waste Recycling Plant Recycle Products By Processing C&D Waste we can produce Bricks/Concrete blocks, pavement blocks and Kerb-stones. Aggregate which can be used as sub-base in road construction. Dirt / loose soil to be used for land filling. NBCC Obligations Area required for setting up plant is provided by NBCC. (1.00 Acre) Supply of C & D Waste at Plant Site. 100% assured buy back of finished products i.e. Bricks from the said plant @ Rs 5.00 each