Overview of large capacity LPG cylinders for energy use Introduction of LOT 35 KG LPG Cylinders

Project Overview

Market Introduction Strategy Introducing LOT 35 KG LPG cylinders aims to improve product range and meet increasing customer demand effectively. Filling Station Modifications Substantial modifications at existing 35 KG filling stations are required to handle the new cylinder specifications safely and efficiently. Operational Efficiency Improvements The LOT cylinders are designed for better handling and optimized filling processes to enhance operational workflows. Preparation and Planning Site visits, technical observations, and planned modifications ensure a smooth transition to the new LOT LPG cylinders. Introduction of LOT 35 KG LPG Cylinders

Site Visit Insights

Hands-on Site Visit The visit to Laufs plant provided practical knowledge about installing LOT 35 KG LPG cylinders and related procedures. Valve Installation and Dismantling Critical steps observed included installation and dismantling of LOT valves, essential for safe cylinder handling. Filling Heads and Procedures Different types of filling heads and proper orientation were noted to ensure efficient and safe filling processes. Operational Insights for Improvements Observations from the plant will guide modifications for smoother transitions to improved filling station systems. Visit to Laufs Plant in Mongla

Technical Observations

LOT Valve Installation Installation and dismantling of LOT valves are vital for safe and efficient gas transfer in LPG cylinders. Filling Head Orientation Proper orientation and type of filling heads ensure secure connections during the LPG filling process. Hose Line Fabrication New LPG hose lines must be fabricated to fit the modified filling station setup for compatibility and safety. Key Components and Procedures

Infrastructure Modifications

Fabrication of New LPG Hose Lines New LPG hose lines must be fabricated to meet the specific requirements of LOT 35 KG cylinders for compatibility. Valve Positioning on Cylinders Valves must be centered on the cut collar to ensure filling guns fit securely and reduce leak risk. Safety and Efficiency Enhancements Infrastructure changes improve safety and operational efficiency by ensuring proper alignment and secure fittings. Required Changes to Filling Stations

Implementation Plan

Modifying Filling Stations Existing filling stations will be modified to fit the new LOT 35 KG LPG cylinder specifications for seamless integration. Installing and Testing Hose Lines Newly fabricated LPG hose lines will be installed and tested to ensure proper functioning and safety. Staff Training Staff will undergo comprehensive training on updated filling procedures to ensure operational readiness and safety. Next Steps for Deployment