650MW MUARA TAWAR Add-ON PROJECT (150MW x 1 Block, 250MW x 2 Block) Doosan Muara Tawar Mapping Fire Extinguisher STB and HRSG #4 DOOSAN ENERBILITY

Ground Floor © Doosan Enerbility 202 4 August 01 (Rev.0) = Fire Extinguisher Total = 7 Pcs

Mezzanine Floor = Fire Extinguisher Total = 5 Pcs © Doosan Enerbility 202 4 August 01 (Rev.0)

Operating Floor = Fire Extinguisher Total = 5 Pcs © Doosan Enerbility 202 4 August 01 (Rev.0)

HRSG #4 = Fire Extinguisher Total = 12 Pcs © Doosan Enerbility 202 4 August 01 (Rev.0)