PROGRESS REPORT SARANA PRASARANA SPK / ADD PEKERJAAN 1 Jaenuri Sasmito 020/JO.DKN-GDN/SPK/I/2024 168,40 M¹ Saluran Batako Uk. 40 X 40 cm Area Blok De 75,00% 75,00% 0,00% On Progres 2 Hasan Basri 025/JO.DKN-GDN/SPK/II/2024 168,40 M¹ Sal. Batako Uk. 40 X 40 cm Area Depan Blok R4 dan Dk 0,00% 0,00% 0,00% On Progres 3 Enan 035/JO.DKN-GDN/SPK/VI/2024 168,35 M¹ Saluran Batako Uk. 40 X 40 cm Area Blok Dh 95,00% 95,00% 0,00% On Progres 4 Madrais 048/JO.DKN-GDN/SPK/X/2024 18,46 M³ Turap Batukali Area Sarana, Blok Dj,Dk & Ea 100,00% 100,00% Selesai 82,06 M¹ Sal. Batako Uk. 40 X 40 cm ( Satu Sisi ) Area Sarana, Blok Dj,Dk & Ea 100,00% 100,00% 5 Madrais 049/JO.DKN-GDN/SPK/X/2024 81,72 M¹ Sal. Beton Bertulang Uk. 100x100 cm Blok Ac 1-10 & Cd 1-4 65,00% 65,00% 0,00% On Progres 2,00 Ttk Bak Kontrol Uk. 100 cm ( Beton Bertulang ) Blok Ab - Ac 0,00% 0,00% 0,00% 8,00 M¹ Dueker Uk. 100 cm Blok Ab - Ac 100,00% 100,00% 0,00% 6 Madrais 056/JO.DKN-GDN/SPK/XI/2024 567,32 M² Cor Jalan Akses Material K 300 NFA T 15 cm Blok Db - Dd 50,00% 50,00% 0,00% On Progres 7 Madrais 057/JO.DKN-GDN/SPK/XI/2024 98,79 M³ Turap Batukali Area Sarana - Blok Da 100,00% 100,00% Selesai 8 Madrais 058/JO.DKN-GDN/SPK/XII/2024 413,12 M² Cor Jalan Row 7 & 8 K 250 NFA T 7 cm Sisi Blok Cd, Dj, Ea & Sarana 100,00% 100,00% Selesai