Mithi river pollution pptx.complete ppt on this river.
Size: 769.36 KB
Language: en
Added: Nov 27, 2017
Slides: 13 pages
Slide Content
Mithi River Pollution
Introduction The Mithi river is a sewer on Salsette Island, the Island of city of Mumbai, India. It is a confluence of tail water discharges of the Powai and the Vihar lakes. The sewer is seasonal and rises during the monsoons. The over-flowing lakes also contribute to the sewer flow which is stopped by dam in other times. The sewer originates from the overflow of vihar lake and also receives the overflow from the powai lake about 2km later. It flows for a total of 17.83 km before it meets the Arabian sea at Mahim creek and has a catchment area of 7295 hectares. It flows through the residential and industrial complexes of powai , Sakinaka , Kurla , Kalina , BKC, Dharavi and Mahim . After the incident of the 26 th July 2005 deluge, it has become very important to look after the Mithi River.
Reclamation on Mithi River. Land reclamation, usually known reclamation and also known land fill is the process of creating new land from ocean, river beds or lake beds. The land reclaimed is known as Reclamation Ground or Land Fill. Large part of Mumbai was built on reclaimed land, making it the Mumbai today. The 7 islands namely Kolaba , Bombay, Old women’s Island, Mazagaon, Worlee , Mahim and parel were brought together by doing reclamation and present financial capital of our country Mumbai was formed. The highest number of land reclamations took place in the past 40 years in the city’s more than 300 years of history of reclamations. The study shows that while the total built-up area of the city in 1970’s was 195.01 sq.km against the total area of 632.6 sq.km, It shot up to 338.38 sq.km in the 1990’s and 385.67 sq.km in 2011. This caused the unprecedented loss of natural landscape due to land use change in favour of built-up area for urban use, created after eating-up more than 50% of Mumbai’s beaches lakes, vegetated islets hillocks, inter-tidal zones and mangrooves .
Problems Occurred due Reclamation. Reclaimed land is highly susceptible to soil liquefication during earthquakes which can amplify the amount of damage that occurs to the buildings and infrastructures. Unscientific and haphazard measures adopted for reclaiming land and the changing nature of land because of the increase in built-up area have adversely affected the city’s ecology. The water which was pushed into the sea/ocean is coming back with double intensity on the coast. The major problem occurred due to reclamation was the formation of mithi river which later caused the 2005 flood in Mumbai.
Water Quality Parameters
Water Quality Parameters
Measures taken by government Rs6.97 crore plan undertaken by MMRDA which involves removal of foul smell and preventing breeding of mosquitoes on the polluted river and Vakola naka . This project was been advised by the National Environmental Engineering Research Institute. The project intends to improve qualitative parameters of mithi waters ( eg :- DO, BOD & COD) which are generally responsible for degradation of any waterbody. The technology is based on the bioremediation measures to remove the pollutants which are basically organic in nature from the polluted water. In this Project odour control is being carried out through bioremediation by adding a live Bacteria namely Persnickety-713 proportionately to the sewage discharged in to the river on a daily basis.
After 26 th July 2005, Rs1057crores have been spent on mithi river Cleaning & Development by MMRDA and MCGM. The New Dead line of Mithi River Project to be completed was 1st April 2017. Earlier deadline was December 2010 which extended 3 times. The Central Government has not spent a single penny till date. This was revealed in a RTI query filed by Athak Seva Sangh Chairman & RTI Activists Anil Galgali from MMRDA & MCGM. Now Galgali moves to Prime Minister Narendra Modi and urges him to clear Rs1657.11 crores fund to MMRDA for the Rejuvenation of Mithi River.
Damage caused by the flooding of mithi river The 26 th July 2005 flood was a major disaster that occurred because of Mithi River. A survey says that:- 52 local trains were damaged. 37,000 autorickshaws were spoiled. 4000 Taxi’s were damaged. 900 BEST busses were Damaged. 10,000 Trucks and Tempos were grounded Around 1000 people died in the incident.
DAMAGE SURVEY:- For the first time ever, Mumbai’s domestic and international airports were shut for more than 30 hours due to heavy flooding on runways, submerged instrument landing system equipment and extremely poor visibility. Over 700 flights were cancelled or delayed. Rail links were disrupted and reports on late evening of 30 th July indicated cancellation of several long distance trains till 6 th August 2005. According to Hindustan Times, an unprecedented 5 million mobile and 2.3 million MTNL landline users were hit for four hours. After all the expenses, a horrifying disaster took place in Mumbai because of the Mithi River. Hence, the day”26 th July 2005” is thereafter marked as a “ BLACK DAY ” in the history of Mumbai City.