BLT 122 BUILDING TECHNOLOGY II AR. RONNEL CARLOS T. RAMOS Course Facilitator UNIVERSITY OF NORTHERN PHILIPPINES College of Architecture
COURSE OUTLINE BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS MODULE 01 – BASIC WORKING DRAWINGS AND GRAPHICAL PRESENTATION TECHNIQUES MODULE 02 – REFLECTED CEILING PLANS AND DETAILS MODULE 03 – SCHEDULE OF DOORS AND WINDOWS MODULE 04 – SCHEDULE OF FINISHES MODULE 05 – KITCHEN AND T&B DETAILS MODULE 06 – STAIR DETAILS MODULE 07 – STRUCTURAL AND CIVIL WORK DRAWINGS MODULE 08 – PLUMBING AND SANITARY DRAWINGS MODULE 09 – ELECTRICAL AND AUXILIARY DRAWINGS
MODULE 08 PLUMBING AND SANITARY DRAWINGS 7.A. PLUMBING NOTES, MATERIAL SPECIFICATIONS, LEGENDS & SYMBOLS 7.B. WATER, SEWER AND DRAINAGE LINE LAYOUTS 7.C. SEPTIC TANK AND OTHER DETAILS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
PLUMBING VS SANITARY PLUMBING The art and technique of installing pipes, fixtures and other apparatuses in buildings. Bringing in the supply, liquids, substances and/or ingredients and removing them. BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS SANITARY Relating to the conditions that affect hygiene and health , especially the supply of sewage facilities and clean drinking water.
BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
PLUMBING NOTES Provide information about the structure which can not be shown in the drawing and additional supplemental data required by the specifications. REFERENCES: PD 1096 – National Building Code of the Philippines RA 1378 – Revised Plumbing Code of the Philippines BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
TYPICAL PIPES USED: STORM DRAINAGE PIPE A pipe which conveys storm / rain water (8”) 200mmØ PVC 2. SOIL PIPE / STACK A pipe which conveys discharge with fecal matter such as water closets or urinals or similar fixture (4”) 100mmØ PVC 3. WASTE PIPE / STACK A pipe which conveys only liquid waste free of fecal matter such as lavatories , kitchen sink , or floor drains. (2”) 50mmØ PVC 4. VENT PIPE / STACK A pipe or opening used for ensuring the circulation of air in a plumbing system (2”) 50mmØ PVC 5. COLD WATER LINE (CWL) / HOT WATER LINE (HWL) A pipe which conveys potable water from the building supply pipe to the plumbing fixtures and other water outlets. 20mmØ PVC / PPR BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS STORM DRAINAGE PIPE (WHITE / ORANGE) SOIL PIPE / WASTE PIPE / VENT PIPE (ORANGE) WATER SUPPLY PIPE - CWL (PVC - BLUE) WATER SUPPLY PIPE – CWL / HWL (PPR - WHITE)
CATCH BASIN - a receptacle in which liquids are retained for sufficient period of time to allow settleable material to deposit. CLEAN OUT - provides access to the sewer line so that blockages can be removed. SHOWER VALVE - fittings designed to control water flow and temperature in the shower. GREASE TRAP - a device designed to retain grease from one to a maximum of four fixtures . GATE VALVE - a valve in which the flow of water is cut off by means of a circular disc fitted against machine-smoothed faces, at right angles to the direction of flow CHECK VALVE - a valve that automatically closes to prevent the flow of liquid or gas in a reverse direction WATER METER - is measures the quantity (volume) of water that passes through a pipe or other outlet. BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS GATE VALVE CHECK VALVE SHOWER VALVE
WATER, SEWER & DRAINAGE PIPE FITTINGS & CONNECTIONS (SEE ATTACHED PDF) BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
WATER LINE LAYOUT SCALE 1:100M GRIDLINES DIMENSIONS (General & Grid to Grid) FIXTURES ONLY; NO FURNITURES COLD WATER LINES HOT WATER LINES (if any) WATER METER, GATE VALVE & CHECK VALVE FITTINGS AND CONNECTIONS LABELS AND SYMBOLS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
WATER LINE LAYOUT BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS GROUND FLOOR SECOND FLOOR
SEWER & DRAINAGE LINE LAYOUT SCALE 1:100M GRIDLINES DIMENSIONS (General & Grid to Grid) FIXTURES ONLY; NO FURNITURES SOIL PIPE LINES VENT PIPE LINES STORM DRAINAGE PIPE LINES DOWNSPOUTS FITTINGS AND CONNECTIONS GREASE TRAP SEPTIC TANK CATCH BASIN LABELS AND SYMBOLS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
SEWER & DRAINAGE LINE LAYOUT BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS GROUND FLOOR SECOND FLOOR ROOF
ISOMETRIC LAYOUT (WATER, SEWER & VENT) BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
ACTUAL PHOTO BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
SEPTIC TANK / SEPTIC VAULT It is a water-tight receptacle which receives the discharge of a sanitary plumbing system or part thereof, designed and constructed to retain solids, digest organic matter through a period of detention and to allow the liquids to discharge into the soil outside of the tank through a system of open-jointed sub-surface pipings or a seepage pit. RA 1378 – NATIONAL PLUMBING CODE OF THE PHILIPPINES: Minimum of two(2) compartments - Digestive & Leaching chambers DIGESTIVE CHAMBER – 2/3 (minimum) of the total capacity - 2.00 cu.m (minimum volume) - 0.90m X 1.50m (minimum) LEACHING CHAMBER- 1/3 (minimum) of the total capacity - 1.00 cu.m (minimum volume) SCALE 1:25M DIMENSIONS LABELS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS SEPTIC TANK SIZING GUIDE
BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS SEPTIC TANK DETAILS
BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS SEPTIC TANK DETAILS
ACTUAL PHOTOS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
CATCH BASIN DETAILS SCALE 1:10M DIMENSIONS LABELS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
ACTUAL PHOTOS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS
CLEANOUT DETAILS OTHER DETAILS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS FLOOR DRAIN DETAILS ROOF DRAIN DETAILS
WATER METER CONNECTION DETAILS OTHER DETAILS BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS GREASE TRAP DETAILS VENT STACK DETAILS
END OF MODULE 08 BLT - BUILDING TECHNOLOGY II MODULE 08 PLUMBING AND SANITARY DRAWINGS