MRP exercises

18,647 views 28 slides Apr 27, 2015
Slide 1
Slide 1 of 28
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28

About This Presentation

MRP Exercises 2nd part


Slide Content

MRP EXERCISE 2nd Part .

BRIEFLY REMAINDER OF WHAT MRP IS AND ITS CHARACTERISTICS MRP is a dependent demand technique that uses a bill of-material, inventory , expected receipts , and a master production Schedule to determine material requirement . In order to apply this method it will be needed to know : 1. What is to be made and when . 2. Materials and parts required to make the product . 3.What is in stock. 4. What is on order , also called expected receipts . 5. How long it takes to get various components . MRP Order Proposal Stock Sales Customerorder Production order Forecast Historical of sales

NET MATERIAL REQUIREMENT PLAN (ELEMENTS) Gross requirement : is the independent demand quantity for each ítem ( given ). Schedule requirement : orders that have been placed but not yet completed ( given ) . Availabilities : estimate amount of inventory available each week after gross requirement have been satisfied . Planned Order Receipts : quantity determined to be required for receipt at the beginning of a time period . Planned Order Releases : amount of order planned in each time period .

NET MATERIAL REQUIREMENT PLAN (FORMULAS) Net Requirement = Gross Requirement – ( availability + Schedule orders ). Optimal Quantity Order = Q* = 2DS H where D= Annual usage . S= Set-up cost . H= Holding cost .

LOT SIZING TECHNIQUES Lot for lot .- Produced exactly what is required . No: if set-up cost is significant high or unable to implement JIT ( Just In Time). Constant or Fixed Order Quantity . Specify a number of units arbitrarily to be ordered each time, an order is placed for a particular ítem. Economic Order Quantity . A specific number of units , that will minimise the combined cost of order ( acquiring and carrying inventory .

PROBLEM Nº 5 ( problem definition ) A company manufactures products A and H and the following information is available : Products A and H Period 8 9 10 11 12 Gross requirement of A 100   50   150 Gross requirements of H   100   50   Item On hand inventory Lead time Components A 1 B (1); C (1) B 100 2 D(1); E(1) C 25 1 F(1); G(1) D 50 1   E 75 2   F 75 2   G 75 1   H 1 J (1), K (1), C(1) J 100 2 E(1), F(1) C 25 1 F(1), G(1) K 100 2 E(1); G(1) 1. Elaborate the product tree structure and represent the level code. 2. Besides the units required of A and H, there exists a demand of 30 units for item E (sold as repair element) in week 10. Modify the Gross materials requirement plan to reflect this change and elaborate the Net Material Requirement Plan.  

PROBLEM Nº5 (SOLUTION) Product tree and representation of the level code . 1st level 2nd level Product A Product H B C C K J D E F G E F E G F G

PROBLEM Nº5 (SOLUTION) There exists a demand of 30 units for item E in week 10, construct the MRP Table. NOTE: It has to been started from the top to the bottom. - The Gross requirement (GRP) for these to table will be directly subtracted from the exercise . Always the GRP of the ítem from the top will be directly given . - The lead time in both ítem: 1 week .

PROBLEM Nº5 (SOLUTION) For Product A is required ítem B and C: - The Gross requirement in ítem B will be subtracted from the orders planned of product A. In the case of ítem C, the GRP will included the order planned for product H. - Availability is given by the exercise ( there no safety stock in this exercise ). - Lead time is two week for ítem B, and one week for ítem C.

PROBLEM Nº5 (SOLUTION) For product H is required ítem J, K and C. - The Gross requirement of both ítems will be taken from the planned order of product H. - Availability : given . - Net req : gross req . Availabilies . - Lead time : ítem J (2 weeks ); ítem K (2 weeks ).

PROBLEM Nº5 (SOLUTION) 2nd level : Item B is composed by ítem D and E. NOTE: Item E is also required for ítem J and K. Additionally in week 10, extra demand of 30. - Gross req . : For ítem D was subtracted from orders planned in ítem B, and for ítem E was subtracted form orders planned in ítem B, J, and K, and the extra demand in week 10 of 30 units . - Availabilities : given . - Net req : Gross req . Availabilities . -Lead time: 2 weeks for both ítems.

PROBLEM Nº5 (SOLUTION) The remainder ítems are F and G: - Gross req : ítem F will be subtracted from planned order of ítem C (x2), J and K. And for ítem G from planned orders of ítem C (x2), and J. - Availabilities : given . - Net req : Gross req . Availabilities . - Lead time : ítem F (2 weeks ); ítem G (1 week ).

PROBLEM Nº 7 (SOLUTION) A company that manufactures product X and Y has the following information : Products X and Y Period 4 5 6 7 Gross requirement of X   50   150 Gross requirement of Y 100   50   Item On hand inventory Lead Time Components X 1 A (1), B (1) Y 1 B(1), F (1) A 100 2 C(1), D(1) B 25 1 E(1), F (1) C 50 1   D 75 2   E 75 1   F 115 1   You are asked to : 1. Elaborate the product tree structure and represent the level code. 2. Besides the requirements for X and Y, there exits also a demand of 30 units for item D (sold externally) in week 5. Modify the Gross Requirement to reflect this change and elaborate the Net Requirement Plan

PROBLEM Nº 7 (SOLUTION) 1. Elaborate the product tree structure and represent the level code. X Y A B B F D C E F E F

PROBLEM Nº 7 (SOLUTION) There exists an extra demand of 30 units (ítem D). Additionally all ítem follows the lot-for-lot technique , excepts ítem F, which follows optimal order quantity technique . Order cost =140 m.u , holding cost : 1 m.u - The Gross requirement (GRP) for these to table will be directly subtracted from the exercise . Always the GRP of the ítem from the top will be directly given . - The lead time in both ítem: 1 week .

PROBLEM Nº 7 (SOLUTION) For product X is required ítem A and B. - The Gross requirement in ítem A will be subtracted from the orders planned of product X. In the case of ítem B, the GRP will include the order planned for product X and Y. - Availability is given by the exercise ( there no safety stock in this exercise ). - Lead time is two week for ítem A, and one week for ítem B.

PROBLEM Nº 7 (SOLUTION) Item F Special characteristic ( follows a fixed order quantity technique ). - The Gross requirement in ítem F will be subtracted from the orders planned of product H, from ítem B (x2). - Availability is given by the exercise ( there no safety stock in this exercise ). - Lead time is two week for ítem B, and one week for ítem C. The planned order will be the one that minimize the cost of holding inventories . Optimal quantity = Q = ROOT ((2 X Ce x D) / Cp x Ɵ ) Q=ROOT (( 2 x 140 x 120) / 1 x 7) = 120

PROBLEM Nº 7 (SOLUTION) 2nd level : For making ítem A is required ítem C and D. - Gross req : ítem C will be subtracted from planned order of ítem A. And for ítem D from planned orders of ítem A. - Availabilities : given . - Net req : Gross req . Availabilities . - Lead time : ítem C (1 weeks ); ítem D (2 week ).

PROBLEM Nº 7 (SOLUTION) For making ítem B is required ítem E. - Gross req : ítem E will be subtracted from planned order of ítem B (x2). - Availabilities : given . - Net req : Gross req . Availabilities . - Lead time : ítem E (1 week ).

SOLVED PROBLEM (problem definition) The demand for item A in weeks 8, 10, and 11 are 50, 75, and 100 units, respectively. Consider the following data.

Answer: (a) and (b) (a) Draw the product tree for item A (b) Indicate the low-level code for each item

Answer (c): MRP records for each item are as follows:

Answer (c): MRP records for each item are as follows:

Answer (c): MRP records for each item are as follows: 1 3 2

Answer (c): MRP records for each item are as follows: 1 1

Answer (c): MRP records for each item are as follows: 2

Answer (c): MRP records for each item are as follows: 3

THANKS FOR YOUR ATTENTION