New Microsoft Office PowerPoint Presentation.pptx

MithileshKumar279 11 views 34 slides Jul 24, 2024
Slide 1
Slide 1 of 34
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34

About This Presentation

WEIGHBRIDGE


Slide Content

UPKEEP OF ROAD WEIGHBRIDGE -1SN Actionable points Responsibility 1 The WB platform should be free from jamming . Project Officer/Sub-Area Manager/ Nodal Officer Weighbridge 2 The cleaning of the platform should be done regularly alongwith loadcell portions. 3 The WB cabin should also be maintained well with proper functioning of AC, lighting, Power backup, etc. 4 The protection devices like lightening arrestor should be earthed properly and alsoto be checked on regular basis.

SN Actionable Points Responsibility 5 The earth-pit of WBs shall be maintained properly and checked on regular basis. Project Officer/Sub-Area Manager/ Nodal Officer Weighbridge 6 All the load cell cable should be encased with the conduit pipe. 7 No coal should be unloaded around WB premises. 8 Proper lighting should be provided in and around the WB platform & Cabin.

CCTV SURVEILLANCE -1S.No. Actionable points Responsibility 1 The vulnerable locations like Mine entry, Mine exit, Weigh Bridge, Store Premises, Coal heaps and diesel dispensing units should be covered by CCTV. Project officer, Mine Manager, Security Personnel, 2 The record of video footage of CCTV should be maintained for minimum period of 30 days at local NVR or any other location of storage . Project officer, Mine Manager, Security Personnel 3 Effective use and proper functioningof the cameras to be ensured Project officer, Mine Manager 4 Any violation monitored through camera should be enquired and action to be taken accordingly Project officer, Mine Manager, GM (Operation)

Monitoring of IT Activities through Control RoomS.No . Actionable points Responsibility 1 Area has to maintain a 24x7 common control room for monitoring all the IT activities. GM (Operation)

ZERO-TOLERANCE 1. NO GPS – NO ENTRY 2. NO WCS – NO WEIGHMENT 3. NO WEIGHMENT – NO EXIT 4. NO RF-ID – NO EXIT. No vehicle is permitted to enter or exit the mine without the automatic operation of the RF ID-based Boom Barrier. DURING EMERGENCIES In case if the RF ID-based Boom Barrier is not rectified within the specified timeframe, the Area GM may grant approval based on the recommendation agreed by Sub-Area Manager, committee consisting of the Colliery Manager, Nodal Officer of the weighbridge, and ASM/Dispatch In-charge for allowing the vehicle to exit with proper reason/justification. The footage of CCTV at boom barrier during the exit of mine must be stored.

IT IMPLEMENTATION Dos &DON’Ts

A register should be maintained at all weighbridges .r The entries in the registers should be authenticated by Weighbridge Personnel on duty by signing the prescribed format given below. No weighbridge is to be operated without valid Stamping Certificate under any circumstances. Integrity of Seal provided by Legal Metrology Department on the Digitizer of all weighbridges should be ensured without fail. At the start of Each shift the Zero setting of the weighbridge shall be verified by Staff on duty alongwith correctness of Date & Time displayed on weighbridge computer WEIGHBRIDGES

All Load cell / weigh sensor cables should have minimum joints and the cables should be laid through wire braided /metallic conduits to avoid damages/ tampering. Ends of conduits should be suitably sealed . Allloadcell /weighsensorcablejunctionboxesshouldbesealedwithoutfailure.Incaseofrequirementtoopensuchsealsformaintenance/repairpurposesimmediateresealinginpresenceoftheNodalOfficerDespatchistobecarriedoutbyservicepersonnel. All breakdowns of weighbridges are to be entered a service/fault register including the date and time of breakdown and the date & time of resumption of weighment . Service Engineers of AMC holders should be instructed to enter all Service visits in this register and sign the register after each service visit. Area has to ensure the weighment of Coal at both ends ( Sending end i.e., Mine and Receiving end i.e., coal stock/Railway siding/CHP) The tare weight of each truck has to be recorded on daily basis for internal mode (inside the mine and to siding) as well as local washery mode. WEIGHBRIDGES

Mandatory record on day-to-day basis in the following registers kept in weighbridge cabin ❖ Zero Setting Register, ❖ Break-down/Repair/Stamping Register, ❖ Corner error register ❖ Inspection register  During weighment , working of centering system in each Road Weighbridge is to be ensured.  No weighment is to be done in case of failure of weighbridge centering system(WCS) weighment not.  Weighbridge must be operated by designated / authorized persons only  No unauthorized person should be allowed to WEIGHBRIDGES

VOILATION IN WCS BY VIGILANCE DEPARTMENT

Continuous and vigorous monitoring of WCS by Weigbridge clerk,nodal officer and Colliery Engineer.In case of detection of malfunctioning of hardware/software in WCS the matter is to be immediately brought to notice of Colliery Manager and Area E&T Engineer for rectification action through CAMC holder . REMEDIAL ACTION

The Boom Barriers should be operated in automatic mode ONLY.  There should be no provision at any boom barrier for any kind of switching/operation of Boom barrier using manual switches/remote control devices/software.  All entry/ exit of vehicle at Boom barrier should against validation through RFID card Only.  If Boom barrier is not working no entry/exit of vehicles through the same .  Separate roads for LMVs with goalpost type barriers to be provided  Boom Barriers/Weighbridges should not be on Public Road BOOM BARRIER

AllvulnerablelocationslikeMineentry,Mineexit,WeighBridge,StorePremises,CoalheapsanddieseldispensingunitsshouldbecoveredbyCCTV. TherecordofvideofootageofCCTVshouldbemaintainedforminimumperiodof30daysatlocalNVRoranyotherlocationofstorage LocationandorientationofCCTVcamerasinweighbridgesandboombarriersshouldbesuchWB/BBoperatorscanseethenumberplateofthevehicleandwhetherapersonissittinginsidevehiclecabinornot. CCTV

CCTVcamerastobeintegratedsothatitcanbemonitoredatCCTVcontrolroom.  CCTVcontrolroomsatArealeveltobefunctionalandmonitoringofCCTVCamerastobedoneon24X7basis.  Displaymonitorshouldbeprovidedinsideallweighbridge / boombarriercabins  AllweighbridgesandboombarrieracrossSECLmaybeuniformlyequippedwithfollowingfacilities a)2Nos.CamerafacingtheApproachandexitofvehicles. b)1CamerafittedattoptoensureemptyconditionfortareweighmentatweighbridgesandemptyoutatBoombarrier. c)1camerainsideBoombarrier/ Weighbridgecabintopreventforcrowdcontrol / Monitoringpurposes . CCTV

PeriodicalreviewofthelocationandorientationofalltheexistingCCTVCamerasmaybeconductedbyateamcomprisingofthefollowingmembers. 1) AreaSecurityI /c. 2) ProjectOfficerorhisAuthorizedRepresentative . 3) NodalOfficerDispatch / SidingorI / cofconcernedOffice /Stores/Workshop/etc. 4) AreaE&TEngineer . CCTV

AllCCTVcamerasshouldbekeptunderCAMC  ProperearthingandsurgeprotectiondevicesshouldbeprovidedwithallCCTVcamerasandNVRs  Regularcleaningofcameralensestobeensured  Incaseofdetectionofviolation /theft/vandalismCCTVfootagestobecheckedandanyrecordedinstancetobepreservedinbackupstoragedevices.Copyofsuchfootagetobehandedovertosecuritydepartmentand/ orminesmanagementforfurtherneedfulaction CCTV

DefectiveCCTVcamerasshouldbereplacedonASAPbasis .  Toenableimmediatereplacementofdefectivecamerassufficientsparestockofcamerasupto10%ofinstalledcapacitymaybemaintained.  IncaseofinordinatedelaybyCAMCcamerasmaybereplacedanddeductionofreplacementmaybedonefrompaymenttoCAMCHolder.  AreaSecurityI /cshoulddeputepersonnelfor24X7monitoringofcamerafootageatcontrolroom  AdequatecommunicationfacilitywithCCTVcontrolroomandQuickResponseTeam(QRT) shouldbeprovided . CCTV

Itshouldbeensuredthatvehiclesengagedininternal (contractual/departmental) coaltransportationwithintheMineGEOFencingdulyfittedwithGPS / GPRSandRFIDTag .  Writtenpermissionfordeploymentofvehiclesforcoaltransportationthroughdepartmental/ contractorvehicletobeobtained .  NodalofficersshouldcheckwithareacontrolroomregardingworkingstatusofGPSDevicesbeforeallowingentryofanynewvehicledeployedforsidingdespatchesandperiodicallyforvehiclesdeployedfortransportinsideminespremises.  NointernaldespatchtobecarriedoutwithavehiclewhichisnotfittedwithGPS/ GPRSinworkingorderandRFIDTag .  IfAnyactionabledeviationrecordedinthemine,thenthesubsequentactiontakenoneachoftheincident. InclusionandExclusionofthevehiclesintooroutofMines /transportationrouteunderGeo-FencingshallbenecessarilywiththepermissionofSub-AreaManagerincludingtemporarilywithdrawalforrepairing/ maintenance.Insuchcases,emptyvehicleshouldonlybeallowed . Note : Geo-fencing mentioned anywhere indicates Geo-fencing of “Mine” , “Transportation route” and “Sidings”. GPS/GEO FENCING

Periodicalinspectionsofweighbridgesystem / BoombarriershallbeensuredasperDT (O) SECLletterNo.SECL /BSP/DTO/2024/886dtd.13/Feb/2024 PERIODICAL INSPECTIONS

➢ GEO-FENCING & GPS Based VTS SYSTEM ➢ BOOM BARRIER ➢ WEIGHBRIDGES (ROAD&RAIL) WITH CONNECTIVITY ➢ CCTV SURVEILLANCE MONITORING OF IT INITIATIVES

MONITORING OF IT INITIATIVES ➢ GEO-FENCING & GPS Based VTS SYSTEM ➢ BOOM BARRIER ➢ WEIGHBRIDGES (ROAD&RAIL) WITH CONNECTIVITY ➢ CCTV SURVEILLANCE