This is slide show of one of the best power point you will learn , and I don't know what it is but it is what it is you should know trump will be a good choice for the same thing as a team is a good choice for the same thing as a team is a good choice for the same thing as a team is the best for me but it was just the first 🥇🥇 and I was thinking 🤔🤔🤔🤔🤔🤔 I think it was the time I got to the same place for the weekend or the next one 🕐🕐🕐🕐🕐🕐 x provinces x men with my eyes 👀 I have to go to the hospital for the day off the weekend and the allys are vultures 😔 so if you have a good choice for me I can see 🙈🙈 the other week is good to get the same as the other one of them are you in a good mood for me and I don't want it on my mind is it a good 👍👍👍👍👍 or the same as you mentioned it is the best for you to be honest and
Size: 4.16 MB
Language: en
Added: Oct 10, 2024
Slides: 38 pages
Slide Content
BASIC TURNAROUND MECHANICAL ACTIVITY
BASIC STEPS DURING TA SCHEDULE/DURATION PERIOD FOR THE COMPLETION OF PROJECT SCOPE OF WORK (SOW) LIST OF EQUIPMENTS PROJECTED TO CONTRACTOR ITP(INSPECTION TEST PLAN) WORK FLOW AS PER SITE CONDITION 3 STEP OF INSPECTION. NDT METHODS CHECK LIST FINAL CLEARENCE BOX UP MISCELLANUEOUS JOB
SCOPE OF WORK EACH EQUIPMENT WHICH ARE ENCLOSED UNDER CONTRACTOR ARE ASSIGNED WITH CERTAIN TASK DETAIL OF WORK DE-COMMISSIONING TO COMMISSIONING DETAIL OF WORK ORGANISED/IN-PLACED DETAIL OF INSPECTION DETAIL OF INSPECTION HOLD POINT FOR CONTRACTOR/CLIENT
SAMPLE OF SOW
LIST OF STATIC EQUIPMENT HEAT EXCHANGER COLUMN/TOWER DRUMS/VESSELS REACTORS(REFRACTORY/NON REFRACTORY) STORAGE TANKS FILTERS/STRAINERS FIRED EQIUPMENTS FURNANCE HEATER REFORMER
TYPES OF EXCHNAGER
HEAT EXCHANGER
HEAT EXCHANGER PARTS
SHELL AND TUBE TYPE
GENERAL STEPS DURING TA BLINDING DISMANTLING OF CHANNEL COVER INSPECTION(PRE) BUNDLE PULLING IF REQUIRED/MENTIONED IN SOW CLEANING (HYDROJETTING OR WATER WASH CLEAN) INSPECTION(POST) NDT /TUBE INSPECTION HYDROTEST FINAL INSPECTION BOX-UP DE-BLINDING
INTERVIEW QUESTIONS TYPE OF EXCHANGER PROCESS OF EXECUTION METHOD OF INSPECTION EQUIPMENT PARTS NDT -TUBE INSPECTION(ECT/MFL/IRIS/RFET) -GENERAL NDT( UT/PT/RT/PAUT) HYDROTEST TEST PRESSURE: 1.3 X MAWP X LSR(St/Sd) (AS PER ASME SEC VIII UG-99) PNUEMATIC TEST PRESSURE : 1.1 X MAWP X LSR(Sd/St) (AS PER ASME SEC VIII UG-100) METAL TEMPERATURE MAINTAIN : AT LEAST 17 °C SHALL NOT EXCEED 48°C PSV SELECTION : 5 % OF ABOVE THE TP. PRESSURE GAUGE SELECTION : 1.5XTP TO 4X TP (AS PER ASME SEC VIII UG 102) ( Eg. TP : 10BAR PG: MIN 15 BAR MAX 40 BAR) SELECTION WATER FOR SS MATERIAL : CLORINE CONTENT LESS THAN 50PPM AND 250PPM FOR CS
SHELL SIDE AND TUBE SIDE HT
COLUMN/TOWER
COLUMN/TOWER PARTS
INTERVIEW QUESTIONS TYPE OF PACKING STRUCTURAL RANDOM INTERNAL PARTS TYPES OF TRAYS SEIVE TRAYS VALVE TRAYS
INTERNAL PARTS BAFFLE PLATES VORTEX BREAKER DEMISTER/SUPPORT RING DISTRIBUTOR PIPE PARTITION PLATE DIFFUSER/VANE SAPERATOR
REACTOR/DRYERS T he cracking reactions active sites of the catalysts with the formation alkanes and aromatic compounds.
INTERNAL PARTS OUTLET COLLECTOR INLET DIFFUSER SUPPORT GRID FLOATING WIRE MESH BED SUPPORT BEAM GRATINGS ABOVE THE MESH
UNLOADING OF CATALYST
LOADING OF CATALYST
REFRACTOR IN REACTOR
STORAGE TANKS Storage tanks purpose for the bulk containment of fluids at different stages of the refinery process .
FILTER/STRAINER Strainers and filters used to protect pumps, plant components and equipment against damage and malfunctioning caused by contamination in the pipeline.
FILTER/STRAINER
INSPECTION TEST PLAN lists of inspections tasks provides and easy follow plan to improve quality assurance. It's a plan that lists what tests and inspections should be performed throughout each phase of a project.
WORK FLOW AS PER SITE CONDITION DE COMMISIONING BLINDING DISMANTLING/MANWAY OPENING INSPECTION CLEANING INSPECTION NDT HYDROTEST IF EXCHANGER REPAIR IF ANY FINAL INSPECTION BOX UP
3 STEP OF INSPECTION. PRE CLEANING POST CLEANING FINAL INSPECTION
NDT METHODS FOR TUBE INSPECTION IRIS : INTERNAL ROTARY INSPECTION SYSTEM MFL: MAGNETIC FLUX LEAK TEST ECT : EDDY CURRENT TEST RFET : REMOTE FIELD EDDY CURRENT TEST CONECTIONAL NDT UT PT PAUT SWUT WFMT
STANDARD CODE REFERENCE…. ASME SECVIII : PRESSURE VESSEL DIV I AND DIV II ASME SEC IX : WELDING AND BRACING QUALIFICATION ASME B31.3 : PROCESS PIPING ASME B16.5 : STEEL PIPE FLANGE AND FLNAGED FITTING ASME B16.20 : METALLIC GASKET ASME B16.21 : NON METALLIC GASKET ASME B36.10 : WELDED AND SEAMLESS WROUGHT STEEL PIPIE ASME B36.19 : WELDED AND SEAMLESS STAINLESS STEEL PIPIE
THANK YOU WITHOUT KNOWLEDGE ACTION IS USELESS AND KNOWLEGDE WITHOUT ACTION IS FUTILE