PROCESS GAS COMPRESSOR
Failure
CASE STUDY
Process Gas compressor is a single stage
Centrifugal compressor
It’s considered to be the Heart Of DRP
industry
A mechanical failure occurred, leads to a sudden trip destroyed some parts.
And we will explore Rehabilitation of a compressor.
Procedures:
A. Dismantling and inspection.
B. Plan and Actions.
C. Final Assembly.
2
A. Dismantling and Inspection
3
Dismantling
Starting with strainer removal. IGV’s Removal.
4
First look after removing IGV’s.5
Compressor Components
“Inspection”
6
PG Compressor Components
As a machine, it could be divided it into 3 main partitions :
1. Inlet Guide Vans “IGV's.”
2. Inlet volute casing including:
2.1. Diffusers.
2.2. Impeller with stud& cup.
2.3. Dry Gas Seal.
2.4. Dry Gas Seal Casing.
3. Gear box including:
3.1. Shafts “H.S.S, L.S.S” with pinion& bull gears.
3.2. H.S.S. Bearings :
3.2.1. Journal compressor side.
3.2.2. Journal motor side.
3.2.3. Thrust bearing.
3.3. L.S.S. Bearings :
3.3.1. Combined bearing.
3.3.2. Journal bearing motor side.
3.4. Carbon rings.
3.5. Main oil gear pump drive& driven gears.
All parts excluded Coupling with spacer and Suction strainer.
7
1. Inlet Guide Vans
8
Broken van found
9
2. Inlet Volute Casing includes
2.1. Diffuser.
2.2. Impeller.
2.3. Dry Gas Seal.
2.4. Dry Gas Seal Casing.
10
2.1.Diffusers
Destroyed blades in old diffusers
11
Diffusers Body
12
2.2. Impeller
13
Sections for destroyed parts14
Impeller cap and screw fixingit, both found thrown in suction line15
3.1. Shafts
High Speed Shaft. “HSS”
Old one New One
21
Low Speed Shaft. “LSS”22
Bearings
23
Bearings
24
3.2. H.S.S. Bearings
General arrangement25
3.2.1. Journal Bearing compressor side
26
Bearing issue27
Measurements28
Blue print29
Crush Test30
3.2.2. Journal Bearing Motor side
31
3.2.3. Thrust Bearing
32
3.3. L.S.S. Bearings
General Arrangement
33
3.3.1. Combined Bearing34
3.3.2. Journal Bearing Motor side35
3.4. Carbon Rings36
3.5. Oil Main Gear Pump Drive and Driven37
B. Plan And Actions
38
•As per inspection the plan was :
➢IGV’s will be changed totally with respect to machining required.
➢A van less diffuser will be designed& fabricated instead of old one.
➢Replace Pinion shaft with all parts related; “Pinion shaft with bearings, carbon rings, DGS and
impeller".
And replacing both "combined and Journal bearing" in L.S. shaft.
➢Decided to repair damages which found in each of “Volute casing & Gearbox cover” with cold welding.
➢DGS casing will be machined and threaded for fittings of nitrogen, process gas inlets and nitrogen vent
seals.
➢Broken teeth in drive for main gear pump will be machined.
➢Expansion Joint in the discharge line will be tested to bechecked.
39
1.Inlet Guide Vans Assembly
40
2.1. New Diffuser41
2.3. Dry Gas Seal42
2.4. Dry Gas Seal Casing
Fitting and Thread issue
43
Broken teeth in Main Gear pump Drive Gear
Teeth before machining Teeth after machining
44
Gearbox & Volute casing repair45
C. Final Assembly
46
1. Install L.S. shaft, check clearance then install main gear pump.47
2. Install H.S.S. with bearings then check clearances.
Install Half Bearings Install H.S. Shaft
48