Ozone Manay Tech Park Brochure - Zricks.com

zricksdotcom 75 views 13 slides Aug 19, 2016
Slide 1
Slide 1 of 13
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13

About This Presentation

For more information about http://www.zricks.com/Ozone-Manay-Tech-Park-Kudlu-Gate-Bangalore/14859
Ozone Manay Tech Park, Kudlu Gate, Bangalore. Visit: http://www.zricks.com


Slide Content

sm

edge that IT

aoe
Hy ti

ituated 12 KM from M.G. Road

r

rg re er aaa ATAR
De er en :

=

=
=

a mom

www.Zricks:com

Plot Area / Size
Shape of the Plot

Frontage of the Plot

No. of Blocks
No. of Floors

Height of the building

Bel Soper io eres of ae rca
Rea
“Total Arca of Pos
Cœur
Ten.

Floor Area (Sq

super built area)

1,39,320 sq.ft. / 3.25 Acres,
Rectangle
3300"

2 blocks
Block À - G + 6 floors

Block B - G + 9 floors

Block À - 27.6 murs.

Block B - 39 mus.

3,95,341 sq.ft

2

1,51,330 sq.ft.

Car parking and other services.
Block A - 15,980 sq.ft

Block B - 30,630 sq.ft

Block A Block B
Ground Floor 16565 32700 4
First Floor 29139,
Second Floor 29198
Third Floor 2969
Fourth Floor 26130
Fifth Floor 27515
Sixth floor 29185
Seventh Floor - 29135
Eighth Floor - 29135
Ninth Floor = 9792
Open Terrace 14210 18185

Granite
Granite
Inside the office Cement flooring

‘Type of AC
AC capacity

Make of the AC plant

Upgrading potential

Place where the AC units are installed

Male 16 closets + 25 urinals
Female ~ 16 closets
‘Toilet floor finish

No.of fireexits 5
Fire Hydrants Fire safety sy
‘compliance with the requiremedts
of Governmental authoriti
ire Provided as per norms
Smoke detectors Provided as per norms
Sprinklers Provided as per norms
Fire sump capacity 5,00,000 litres.
Over head tank capacity Fire 80,000 litres

‘Type of construction RCC frame structure with post

tensioned beam and slab with

isolated / combined footing

Load bearing capacity Live Load 360 Kg, per squmtr

Dead Load — Self weight + 200 Kg per sq.mir. for finishes

Column to column measurement 8 mtrs X 9.5 mtrs

Ceiling height — 11°7" finished floor level to ceiling
9° 4 finished floor level o false ceiling

Noo lifts / capacity
Passen;

Tnos. of 20 passenger capacity
Service 2008. of ton capacity each
Make of the lift “ Kone

Power connection} * HT power connection from KPTCL up to 3 MVA.
‘Total power available for the building 4000 KVA
No. of transformers 208. of 2MVA OLTC

Power alloted per floor 1KVA for every 100 sq.
Total back-up power available 100%
Back-up power for each floor 100%
Back-up power for AC 100%
DG set capacity — 2Nos. of 1250 KVA + 2.No. of 1000 KVA
Make of the DGset Cummins

power back-up

Place where the DG setis kept Inthe basement
Place where the fuel tank is kept Near the DG set
Fuel tank capacity 990 litres
Where the back up power Main LT panel

cable is connected

‘The DG setis sound proof — Yes, with room acoustics,

No. of car parking slots
Covered
Open

Mass communication systems

Proposed location of server rooms

Space for installation of
‘Communication dish / tower.

‘Sump capacity (UGR)

‘Overhead tank capacity
Water treatment plant
swage treatment plant (STP)

Cafeteria
Health Club
Swimming Pool
ATM

DLC from BSNL /
Bharti provided

On each floor

Provided in the terrace,

2,00,000 Lars. (through Hydro
‘pneumatic system)

20,000 Lr

Provided

200KLD

EAST ELEVATION

CREDAI