PPT for MD VC on 24.02.2025 SD 1150 hrs.pptx

KKBPPLnagaland 14 views 45 slides Mar 04, 2025
Slide 1
Slide 1 of 45
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45

About This Presentation

Project review meeting format NHIDCL


Slide Content

Status of projects as on 24.02.2025 Meeting Date- 24.02.2025 NAGALAND RO-Kohima 1

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 1. Name of Project: - 4-laning of Dimapur-Kohima road from design Km 123.840 to Km 138.775 (Existing Km 124.100 to Km 140.000) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an EPC Contract ( PACKAGE-I ). Milestones I II III Completion Req. Prog . 10% 40% 80% 100% Schedule 14.03.2017 19.03.2018 19.03.2019 15.09.2019 Extended 09.08.2017 25.05.2018 28.05.2021 30.11.2022 Actual 09.08.2017 25.05.2018 28.05.2021 - Progress (%) As on date After De-Scoping 01 Month ago 6 months ago Physical 99.81 99.81 99.81 Financial 98.86 98.86 98.86 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 74.55 Land is not acquired as per NH Act 1956 126.41 Cr (PKG-I & II) 124.86 Cr. (PKG-I & II) 74.55 Ha Yet to be done. Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 13.442 Km 14.935 Km 16.04.2021 2 Broad Scope of Work :- (Completed/Ongoing/Total) 1. Land Acquisition & Forest Clearance :- 2. Railways : Nil 3. Non-Forest Tree felling: 8724/8724. (Cumulative For PKG-I, II & III). 4. Utility Shifting: Water Supply pipelines: Completed. (100% progress) Electrical utility: Completed. (100% progress) 5. Other Issues: Delink proposal for Toll Plaza and Pagla Pahar is awaited from Authority’s Engineer. Updated list of works with bare minimum activities for the upkeep of the road has been identified and shared with the contractor with instructions to submit program and start the works. However, r ectification/maintenance yet to be started by EPC Contractor. During Project review meeting held on 06.02.2025, Director (T )-I instructed the EPC Contractor to Submit work Program for the rectification works & execute the same immediately. However, the Contractor has neither submitted, nor commenced any works at site. 6. Action Taken: Cure Notice period for 60 days under Cl. 23.1 of Contract Agreement has been issued to the EPC Contractor on 19.06.2024. Scheme SARDP-NE Contractor M/s Ramky -ECI (JV) Authority’s Engineer M/s TASPL-AICPL PMU Dimapur TPC & AAFS Date Rs . 534.41Cr Dated – 21 st Oct, 2022 Awarded Cost Rs . 387 Cr. (excl. GST) (Rs. 386.74 Cr, after De-Scope ) (Bid Cost Rs . 373.07, +3.73%) Date of LOA 31 st Mar 2016 Appointed Date 16th Sept 2016 Schedule / Likely Completion 15th Sept 2019 / 31st Mar 2025 Contract Length 14.935 Km Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (02nos.) Approved 04/00/04 nos. 04/00/04 nos. 02/00/02 spans Major Bridge (…..nos.) NIL NIL NIL NIL Viaduct (.....nos.) NIL NIL NIL NIL ROB/RUB (.....nos.) NIL NIL NIL NIL DELAYED Total Comp. Ong. Total Comp. Ong. Sub-grade 14.94 14.94 0.00 Culverts 100 100 0.00 GSB 14.94 14.94 0.00 Drains 14.83 14.83 0.00 WMM 14.94 14.94 0.00 Retaining Wall 0.80 0.80 0.00 DBM 14.94 14.94 0.00 Breast Wall 2.98 2.98 0.00 BC 14.28 14.28 0.00 Special Slope Protection 5.89 5.74 0.15

Land Acquisition & Forest Clearance :- 3

:- Status as on: 24.02.2025 2. Name Of Project: - Balance work of 4-laning of Dimapur-Kohima road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900)in the state of Nagaland under SARDP-NE through an EPC Contract ( PACKAGE-III ). Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 10.06.2024 10.12.2024 10.06.2025 28.09.2025 Extended - - - - Actual 16.05.2024 08.01.2025 - - Progress (%) As on date 1 month ago 6 months ago Physical 41.86 37.58 17.82 Financial 35.15 35.15 15.55 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 54.59 Land is not acquired as per NH Act 1956 44.18 Cr. (PKG-III) 44.17 Cr. (PKG-III) 54.59 Ha Yet to be done. Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land involved. Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 14.210 14.210 29.09.2023 4 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Brand Eagles Authority’s Engineer M/s TASPL-AICPL PMU Dimapur TPC & AAFS Date Rs . 794.74 Cr Dated 07.12.2023 (Bid Cost Rs . 119.19, -6.87%) Awarded Cost Rs. 111 Cr Date of LOA 04 th August 2023 Appointed Date 29.09.2023 Schedule / Likely Completion 28.09.2025 / 28.09.2025 Contract Length 14.210 Km Overall Progress of Project Physical :- 87.72% & Financial :-85.62% Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (04nos) Approved 02/00/02 00/01/02 00/00/01 span Major Bridge (01 nos ) Not submitted 00/00 nos. 00/00/00 nos. 00/00/01 span Viaduct (.....nos.) NIL NIL NIL NIL ROB/RUB (.....nos.) NIL NIL NIL NIL Broad Scope of Work :- (Completed/Ongoing/Total) 2 . Railways: Nil 3. Non-Forest Tree felling : 8724/8724. ( Cumulative For PKG-I, II & III). 4 . Utility Shifting: Water Supply pipelines: Completed. (100% progress) Electrical utility: Completed. (100% progress) 5. Other Issues : Proposal and design from Ch 164.000 to Ch 164.100 awaited from EPC Contractor . Works at Steel bridge Ch 155+245 is yet to start. Milestone-II has been achieved within Grace Period. However, contractor needs to increase man power to ensure steady progress in working season . Construction Targets vs Ach. For F.Y 24-25 : 3.700 Km / 2.550 KM Total Comp. Ong. Total Comp. Ong. Earthwork 1.155 Km 0.530 0.00 Culverts 10.5 nos. 1.50 2.0 Sub-grade 3.005 Km 1.326 0.00 Drains 12.115 Km 2.137 0.00 GSB 3.489 Km 1.403 0.00 Retaining Wall 270 Rm 83.5 0.00 WMM 3.852 Km 1.568 0.00 Breast Wall 3222 Rm 1768 0.00 DBM 5.868 Km 3.250 0.00 Gabion Wall 25 Rm 0.00 0.00 BC 13.080 Km 2.930 0.00 Reconstruction of damaged works 0.445 Km 0.330 0.00

5

:- Status as on: 24.02.2025 3. Name Of Project: - Slope Protection works for construction of 4-laning of Dimapur-Kohima road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900)in the state of Nagaland under SARDP-NE through an EPC Contract ( PACKAGE-III ) Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 09.10.2024 08.01.2025 09.04.2025 02.06.2025 Extended - - - - Actual Not Achieved Not Achieved - - Progress (%) As on date 1 month ago 6 months ago Physical 13.42 (As per proposal sent to HQ for approval) 6.74 - Financial - - - Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 54.59 Land is not acquired as per NH Act 1956 44.18 Cr. (PKG-III) 44.17 Cr. (PKG-III) 54.59 Ha Yet to be done. Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land involved. Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 14.210 14.210 03.06.2024 6 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Maccaferri Infrastructure Pvt. Ltd. Authority’s Engineer M/s TASPL-AICPL PMU Dimapur TPC & AAFS Date Rs . 794.74 Cr Dated 07.12.2023 (Bid Cost Rs . 59.33, -39.32%) Awarded Cost Rs. 36.00 Cr +20.24Cr (COS) Date of LOA 15 th March 2024 Appointed Date 03.06.2024 Schedule / Likely Completion 02.06.2025 / 02.06.2025 Contract Length 14.210 Km Broad Scope of Work :- (Completed/Ongoing/Total) 2. Other Issues : a. Slope Protection works- DK-III: Design drawing of all 16 nos locations has been submitted by Contractor, out of which 13 locations have been approved by AE and balance 3 locations are under consideration. Out of 13 approved locations, works are under going on 7 locations EPC Contractor has been instructed to execute the slope protection works as per the site conditions to the maximum extent as required at site. b . Slope Protection works- Dimapur-Kohima-I ( CoS works for Rock-netting): i . Work is in progress at all 11 locations. c. Slope Protection works- Dimapur - Kohima-I (STMC-Rock Barrier): Design and drawings are approved for 6 nos. locations out of 6 nos. locations with technical requirements to be complied with. 3 . Action Taken: Notice for non-achievement of Milestone-I & II issued to EPC Contractor on 10.10.2024 & 09.01.2025 respectively. LD Notice issued to the EPC Contractor on 20.12.2024 for non-achievement of Milestone-I. Cure Notice No.1 issued to EPC Contractor on 19.10.2024 & Cure Notice No.2 issued on 07.01.2025. Total Comp. Ong. Hydroseeding with coir netting 6559 Sqm 1050 550 Rock netting 29830 Sqm 1170 - Self drilling Anchors of 25mm/32mm dia , 3D MAT, Rhomboidal mesh, Hydroseeding etc. 14500 Sqm 3000 2000 Self drilling Anchors of 25mm/32mm dia , 3D steel reinforced monofilament erosion control mat, Hydroseeding etc. 24450 Sqm 4824 3000 Self drilling Anchors of 25mm/32mm dia , DT mesh, Coir mat, Hydroseeding concrete drain/Anchor trench at top etc. 37785 Sqm 1170 8,000

:- Status as on: 24.02.2025 4. Name Of Project: - Construction of RCC Box Cell Viaduct by Box Pushing Method at Chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) contract basis ( PACKAGE-III ) Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 27.06.2025 11.11.2025 28.03.2026 18.06.2026 Extended - - - - Actual - -- - - Progress (%) As on date 1 month ago 6 months ago Physical - - - Financial - - - Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 54.59 Land is not acquired as per NH Act 1956 44.18 Cr. (PKG-III) 44.17 Cr. (PKG-III) 54.59 Ha Yet to be done. Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land involved. Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability - - - 7 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Khalatkar Construction Infra Pvt. Ltd. – M/s RAK Projects Pvt. Ltd. (JV) Authority’s Engineer M/s TASPL-AICPL PMU Dimapur TPC & AAFS Date Rs . 794.74 Cr Dated 07.12.2023 (Bid Cost Rs. 90.02, - 39.32 %) Awarded Cost Rs. 89.93 Cr Date of LOA 10 th October 2024 Appointed Date 17.12.2024 Schedule / Likely Completion 18.06.2026 Contract Length 0.300 Km Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (… nos ) NIL NIL NIL NIL Major Bridge (… nos ) NIL NIL NIL NIL Viaduct (.....nos.) NIL NIL NIL NIL ROB/RUB (.....nos.) NIL NIL NIL NIL Broad Scope of Work :- (Completed/Ongoing/Total) Status: Camp and lab setup is under progress at Ch. 153+000. Batching plant and Transit mixers will reach site by end of February 2025. Site clearance under progress by EPC Contractor. Special Note: LoA for executing RCC Box Cell Viaduct by Cast in Situ method has been issued to M/s Khalatkar Construction Infra Pvt. Ltd. – M/s RAK Projects Pvt. Ltd. (JV) on 04.02.2025. Item Total Comp. Ong. RCC BOX Cell TYPE 150 M 0.00 0.00 Subgrade 150 M 0.00 0.00 GSB 150 M 0.00 0.00 DLC 150 M 0.00 0.00 PQC 150 M 0.00 0.00 Protection Work 2100 Sqm 0.00 0.00

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 5. Name of Project: - Construction of 4-laning of Dimapur Bypass from design Km 132.375 to Km 153.058 (Design Length 20.683 Km) in the State of Nagaland. (Nagaland Portion ) ) 8 Broad Scope of Work :- (Total/Completed/Ongoing/) 1. Land Acquisition & Forest Clearance :- 2. Railways : Nil 3. Non-Forest Tree felling: 12657/12657 4. Utility Shifting: Water Supply pipelines : Completed. Electrical utility : Completed . Scheme SARDP-NE Contractor M/s Simplex Infrastructurs Limited Authority’s Engineer M/s YECL-SITCL PMU Dimapur TPC & AAFS Date Rs. 688.12 Cr Dated: 03/11/2022 Awarded Cost Rs. 387.00 Cr (Including GST) + COS-4.85 Cr + 1.79 Cr – 0.59 Cr (Negative COS) Revised Cost- 393.05 Cr. (Bid Cost Rs . 507.68, - 23.77%) Date of LOA 28.03.2017 Appointed Date 05.09.2017 Schedule / Likely Completion 04.09.2020 / 31.03.2025 Contract Length 20.683 Km (20.652 Km) Milestones I II III Completion Req. Prog . 10% 40% 80% 100% Schedule 04.03.2018 09.03.2019 08.03.2020 04.09.2020 Extended 15.08.2018 09.03.2020 17.08.2021 28.02.2023 Actual 31.08.2018 31.03.2020 17.08.2021 Not Achieved Progress (%) As on date 1 month ago 6 months ago Physical 99.64 99.40 99.19 Financial 99.41 99.08 99.06 Major Structures Design/Drawing Status Foundation Sub-structure Super-structure Minor Bridge (02 No.) Approved 08 / 00 / 08 No. 08 / 00 / 08No. 02 / 00 / 02 span Major Bridge (01 No.) Approved 08/ 00 / 08 No. 08/ 00 / 08 No. 03 / 00 / 03 span VUP/VOB/FO (01 No.) Approved 02 / 00 / 02 No 02 / 00 / 02 No 01 / 00 / 01 Span CUP/PUP (03 No.) Approved 03 / 00 / 03 No. 03 / 00 /03 No. 03 / 00 / 03 Span Total Un-encumbered length ( RoW ) available for construction As on Appointed Date Today Date of 100% length availability 20.683 Km 20.683 Km 05.09.2017 5. Issues with Contractor : EPC Contractor is required to complete service road, protection work of culverts, highway lighting & other miscellaneous works for completion of Project. Slow progress observed at site due to inadequate deployment of resource, capital infusion by EPC Contractor and demobilization of RMC Plant. EPC contractor has also submitted work programme on 20.12.2024 to complete the project by 31.03.2025. EPC Contractor to further increase the resource especially labour and excavator. Plantation, lighting, NCR rectification, culvert protection and service road work in progress at site . 6. Action Taken: During the review meeting held on 06.02.2025 under the chairmanship of Dir (T), HQ, NHIDCL, EPC Contractor was directed to complete the project by 31.03.2025. Total Comp. Ong. Total Comp Ong. Earthwork 18.74 Km 18.74 0.00 Culverts 81 No 81 0.00 Sub-grade 18.74 Km 18.74 0.00 Drains 21.10 Km 21.10 0.00 GSB 20.42 Km 20.42 0.00 Toe Wall 2708 Rm 2708 0.00 DLC 20.42 Km 20.42 0.00 Breast Wall with 903 Rm 903 0.00 PQC 20.42 Km 20.42 0.00 Special Slope Protection De-scoped Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 126.24 NH Act Not Applicable 172.70 Cr 172.70 Cr 126.24 Ha Yet to be done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land involved.

9 Project Name: Construction of 4-laning of Dimapur Bypass Road (Nagaland Portion) from design Km 132.375 to Km 153.058 (Design Length 20.683 Km) under SARDP-NE on EPC basis in the State of Nagaland.

:- Status as on: 24.02.2025 6. Name of Project: - Construction of 4-laning of Dimapur Bypass from design Km 118.050 to Km 132.375 (Design Length 14.325 Km) in the State of Assam. (Assam Portion) Milestones I II III Completion Req. Prog . 10% 40% 80% 100% Schedule 24.11.2020 17.07.2021 29.05.2022 25.11.2022 Extended - - 27.11.2023 08.03.2024 / 23.08.2024 Actual 26.11.2020 18.07.2021 27.11.2023 Not achieved / Not achieved Revenue Land (Ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 85.95 20.12.2017 22.05.2018 21.12.2018 22.03.2018 21.12.2018 11.02.2019 169.52 Cr 168.96 Cr 85.95 Ha 83.1 Ha done by KAAC, CALA. Forest Land (Ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land involved. Un-encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 5.025 Km 14.325 Km 16.03.2022 10 1. Land Acquisition & Forest Clearance :- Scheme SARDP -NE Contractor M/s GAWAR- SINGH (JV)   Authority’s Engineer M/s YECL-SITCL PMU Dimapur TPC & AAFS Date Rs. 698.81 Cr & 22.03.2023 Awarded Cost Rs. 336.49 Cr ( Incl GST) + COS-71.63 Cr. Revised Cost- 408.12 Cr. (Bid Cost Rs . 374.46 -10.14%) Date of LOA 19.03.2018 Appointed Date 26.11. 2019 Schedule / Likely Completion 08.03.2024 / 31.03.2025 23.08.2024 / 31.03.2025 Contract Length 14.325 Km Broad Scope of Work :- (Completed/Ongoing/Total) 2. Railways : Safety Clearance from NF Rly to be obtained for movement of Public Carriage. 3. Non-Forest Tree felling : 12077/12077 4. Utility Shifting : Water Supply pipelines - Completed. Electrical utility : APDCL – Completed. AEGCL - Under progress. (80% progress) 5. Other issues : EOT proposal is awaited from EPC Contractor. COS proposal for service road recommended on 17.12.2024. The same is under consideration at HQ, NHIDCL 6. Action Taken: During the review meeting held on 27.01.2025 under the chairmanship of Dir (T), HQ, NHIDCL, EPC Contractor was directed to complete the project in all respect by 31.03.2025 Progress (%) As on date 1 month ago 6 months ago Physical 97.24 96.83 94.43 Financial 92.67 92.67 92.67 Major Structures Design/ Drawing Status Foundation Sub-structure Super-structure Minor Bridge (06 N o.) Approved 30 / 00 / 30 No. 30 / 00 / 30 No. 09 / / 09 Span Major Bridge (03 No.) Approved 30 / 00 / 30 No. 30 / 00 / 30 No. 12 / 00 / 12 S pan VUP/VOB/FO (01 No.) Approved 04 / 00 / 04 No 04 / 00 / 04 No 01 / 00 / 01 Span ROB (01 No.) Approved 08 / 00 / 08 No. 08 / 00 / 08 No. 03 / 00 / 03 Span EUP (02 No.) Approved 08 / 00/ 08 No. 08 / 00 / 08 No. 02 / 00 / 02 Span Construction Targets vs Ach. For F.Y 24-25 : 0.340 /0.290 Km Total Comp. Ong. Total Comp. Ong. Earthwork 11.391 Km 11.340 0.00 Culverts 46 No 46 Sub-grade 11.391 Km 11.340 0.00 Drains 14.64 Km 14.64 0.00 GSB 13.565 Km 13.532 0.03 Toe Wall 5375 Rm 5375 0.00 DLC 13.433 Km 13.379 0.05 Breast Wall 4100 Rm 3706 0.00 PQC 13.499 Km 13.419 0.05 Retaining Wall 1201 Rm 1181 20

11 Project Name: Construction of 4-laning of Dimapur Bypass Road (Assam Portion) from design Km 118.050 to Km 132.375 (Design Length 14.325 Km) under SARDP-NE on EPC basis in the State of Assam

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 7. Name of Project: - Balance work for 2-laning with Hard shoulder of Peren-Dimapur section of NH-129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the State of Nagaland on EPC mode ( Package-II ) under NH (O)-TSP. Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 22.05.2024 21.11.2024 23.05.2025 09.09.2025 Extended - - - - Actual 21.06.2024 20.12.2024 Not yet due Not yet due Progress (%) As on date 01 Month ago 6 months ago Physical 42.74 39.39 12.56 Financial 35.97 35.97 10.27 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 41.91 Land in not acquired under NH Act 1956. 16.94 16.92 41.91 _ Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest land involved Total Un-encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 19.433 Km 19.433 Km 25.08.2021 12 Broad Scope of Work :- (Completed/Ongoing/Total) 1. Land Acquisition & Forest Clearance :- 2. Railways : NIL 3. Non-Forest Tree felling: 11034/ 13426 4. Utility Shifting: Water supply pipelines: 100% Completed. Electrical Utility: 100% Completed. 5. Other Issues: Out of 800m of hindrance 620m has beeen resloved and balance 180 m hindrance at site. Issue raised with District Administration on 22.01.2025, 02.01.2025, 02.12.2024, 19.11.2024, 04.11.2024, 19.09.2024 & 28.08.2024 for early resolution. Scheme NH (O)-TSP Contractor M/s AM Infrastructure Projects Pvt. Ltd – M/s RN Infra Project (JV) Authority’s Engineer M/s CEMOSA+PCPL+Introsoft Sol. PMU Dimapur TPC & AAFS Date Rs. 258.52 Cr Dated: 18/01/2021 (Bid Cost Rs . 79.43, -28.5%) Awarded Cost Rs. 56.79 Cr (Excl. GST) Date of LOA 31.05.2023 Appointed Date 10.09.2023 Schedule / Likely Completion 09.09.2025/ 09.09.2025 Contract Length 19.433 Km Overall Progress of Project Physical :- 71.27% & Financial :- 67.35% Major Structures Design/Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) - - - - Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 11.180 / 7.423 Km Total Comp. Ong. Total Comp. Ong. Sub-grade 1.414 Km 0.564 0.100 Culverts 56 Nos 30 04 GSB 4.413 Km 2.767 0.150 Drains 23.53 Km 8.720 0.250 WMM 14.988 Km 7.988 0.200 Retaining Wall 4225 RM 2583 130 DBM 16.433 Km 9.333 0.00 Breast Wall 3381Rm 2380 100 BC 19.433 Km 0.00 0.00 Special Slope Protection 218390 Sqm 0.00 0.00

13 Project Name: Balance work for 2-laning with Hard shoulder of Peren-Dimapur section of NH-129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the State of Nagaland on EPC mode (Package-II ) under NH (O)-TSP.

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 8. Name of Project: - Construction of 2 laning with Hard shoulder of Peren-Dimapur section on NH 129A from Design Km 146.208 to Km 163.592 (Length- 17.384 Km) in the State of Nagaland on EPC mode ( Package-III ) under NH (O)-TSP. Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 17.02.2024 18.08.2024 17.02.2025 06.06.2025 Extended - - - Not yet due Actual 16.03.2024 10.12.2024 Not Achieved Not yet due Progress (%) As on date 01 Month ago 6 months ago Physical 49.33% 44.67% 20.02% Financial 41.89% 35.28% 16.24% Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 34.54 Land in not acquired under NH Act 1956. 18.59 18.51 34.54 _ Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest land Involved Total Un-encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 17.384 Km 17.384 Km 11.10.2022 . 14 Broad Scope of Work :- (Completed/Ongoing/Total) 1. Land Acquisition & Forest Clearance :- 2. Railways : NIL 3. Non-Forest Tree felling: 1657/1679 4. Utility Shifting: Water supply pipelines: 100% completed. Electrical Utility: 100% completed. Other Issues: Inadequate deployment of technical staff. Slow Progress of work at site. 6. Action Taken: Notice for non-achievement of MS-II issued to EPC Contractor on 27.09.2024. Cure Notice under Cl. 23.1 of Contract Agreement has been issued on 24.01.2025. Scheme NH(O)-TSP Contractor M/s AM Infrastructure Projects Pvt. Ltd – M/s RN Infra Project (JV) Authority’s Engineer M/s Agnitio Infrastructure Project Pvt.Ltd . In JV with M/s Infrastructure Development Consultants PMU Dimapur TPC & AAFS Date Rs. 199.02 Cr Dated: 21/10/2022 (Bid Cost Rs . 117.27, -32.63%) Awarded Cost Rs. 79.00 Cr (Excl GST) Date of LOA 20/03/2023 Appointed Date 07/06/2023 Schedule / Likely Completion 06/06/2025 / 31/12/2025 Contract Length 17.384 Km Major Structures Design/Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) - - - - Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 11.500 / 8.220 Km Total Comp. Ong. Total Comp. Ong. Sub-grade 17.384 Km 14.44 0.700 Culverts 109 Nos 76 19 GSB 17.384 Km 14.340 0.500 Drains 23.53 Km 5.65 0.70 WMM 17.384 Km 10.295 0.500 Retaining Wall 8100 RM 561 270 DBM 17.384 Km 8.220 0.500 Breast Wall 10501 Rm 4121 300 BC 17.384 Km 0.00 0.00 Special Slope Protection 10000 Sqm 0.00 0.00

15 Project Name: Construction of 2 laning with Hard shoulder of Peren-Dimapur section on NH 129A from Design Km 146.208 to Km 163.592 (Length- 17.384 Km) in the State of Nagaland on EPC mode ( Package-III ) under NH (O)-TSP.

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 9. Name of Project: - Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH - 129A from Design Km 163.592 to Km 173.850 (Length - 10.258 km) in the State of Nagaland on EPC mode ( Package-IV ) under NH (O)-TSP. Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 05.11.2024 07.05.2025 06.11.2025 23.02.2026 Extended - Not yet due Not yet due Not yet due Actual 30.11.2024 Not yet due Not yet due Not yet due Progress (%) As on date 01 Month ago 6 months ago Physical 30.59 27.97 0.00 Financial 28.82 23.42 0.00 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 21.74 Land in not acquired under NH Act 1956. 7.26 7.18 21.74 _ Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest land Involved Total Un-encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 10.258 Km 10.258 Km 25.07.2023 16 Broad Scope of Work :- (Completed/Ongoing/Total) 1. Land Acquisition & Forest Clearance :- 2. Railways : NIL 3. Non-Forest Tree felling: 1650/1870 4. Utility Shifting: a) Water supply pipelines: 100% Completed. b) Electrical Utility: 100 % completed. 5. Other Issues: Nil 6. Action Taken: EPC Contractor has been advised to expedite construction activities. Scheme NH(O)-TSP Contractor M/s Vertex Construction Authority’s Engineer M/s Agnitio Infrastructure Project Pvt.Ltd . In JV with M/s Infrastructure Development Consultants PMU Dimapur TPC & AAFS Date Rs. 116.54 Cr Dated: 30/03/2021 (Bid Cost Rs . 69.45, -34.5%) Awarded Cost 45.49 Cr. Date of LOA 04.01.2024 Appointed Date 24.02.2024 Schedule / Likely Completion 23.02.2026/23.02.2026 Contract Length 10.258 Km Major Structures Design/Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) - - - - Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 6.000 / 3. 7 80 Km Total Comp. Ong. Total Comp. Ong. Sub-grade 10.258 Km 7.313 0.300 Culverts 71 Nos 0.00 15.00 GSB 10.258 Km 7.085 0.00 Drains 9.704 Km 0.00 0.200 WMM 10.258 Km 4.440 0.200 Retaining Wall 2400 RM 110 10 DBM 10.258 Km 3.580 0.00 Breast Wall 1803 Rm 300 20 BC 10.258 Km 0.00 0.00 Special Slope Protection 10000 Sqm 0.00 0.00

17 Project Name: Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH - 129A from Design Km 163.592 to Km 173.850 (Length - 10.258 km) in the State of Nagaland on EPC mode (Package-IV) under NH (O)-TSP.

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 10. Name of Project: - Construction of 2 laning with Hard shoulder of Peren-Dimapur section on NH 129A from Design Km 173.850 to Km 190.850 (Length - 17.000 Km) in the state of Nagaland on EPC Mode (Package-V) under NH(O)-TSP Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule - - - - Extended - - - - Actual - - - - Progress (%) As on date 01 Month ago 6 months ago Physical - - - Financial - - - Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 35.4 Land in not acquired under NH Act 1956. - - - - Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest land Involved Total Un-encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability - - - 18 Broad Scope of Work :- (Completed/Ongoing/Total) 1. Land Acquisition & Forest Clearance :- 2. Railways : NIL 3. Non-Forest Tree felling: - 4. Utility Shifting: Water Supply pipelines : Deposition of fund to concerned utility owning Dept. is pending, due to non-finalization of damage compensation . Electrical utility : Revised utility shifting estimate is to be finalized after NOC is received from GoN for ibid alignment. 5. Other Issues : Damage compensation estimate for the complete stretch is awaited from GoN . Competent Authority on 07.03.2023 terminated the previous EPC Contractor . 6. Action Taken : Issue of Damage Compensation Estimate was raised by ED(P), RO-Kohima to the Dy. CM, Nagaland on 28.01.2025, wherein DC, Chumoukedima was directed that Damage Compensation estimate be finalized and forwarded to NHIDCL by February, 2025 . Advance payment of Rs . 0.12 Cr deposited in joint CALA A/c on 08.11.2024 for carrying out LA survey Works and survey work has been completed . HQ NHIDCL on 16.01.2025 has sought reasons for increase in cost of 34.14 Cr more than the sanctioned cost & for optimizing the Civil cost and finalizing the provisions. Further, RO-Kohima on 03.02.2025 has submitted required compliance for approval of Competent Authority to HQ, NHIDCL. Scheme NH(O)-TSP Contractor Yet to be appointed. Authority’s Engineer Yet to be appointed. PMU Dimapur TPC & AAFS Date Rs. 207.33 Cr Dated: 11/02/2021 Awarded Cost - Date of LOA - Appointed Date - Schedule / Likely Completion - Contract Length 17.000 Km Major Structures Design/Drawing Status Foundation Sub-structure Super-structure Minor Bridge ( 03 N os.) - - - - Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB ( 01 Nos RUB) - - - - Total Comp. Ong. Total Comp. Ong. Sub-grade 17.00 Km 0.00 0.00 Culverts 86 Nos 0.00 0.00 GSB 17.00 Km 0.00 0.00 Drains 23.939 Km 0.00 0.00 WMM 17.00 Km 0.00 0.00 Retaining Wall 2800 RM 0.00 0.00 DBM 17.00 Km 0.00 0.00 Breast Wall 3500 Rm 0.00 0.00 BC 17.00 Km 0.00 0.00 Special Slope Protection 10000 Sqm 0.00 0.00

Status as on: 24.02.2025 11. Name Of Project: - Construction of two lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from Design Km 00.000 to design Km 10.500 in the state of Nagaland Under SARDP-NE on EPC Mode (Package I) Revenue Land (ha) 3A date 3D date Compensation amount with CALA(LA+ Dmg. Comp) Amount disbursed Land Made available Mutation status 35.93 NA 30.73 Cr 30.73 Cr 35.93 Ha Yet to be done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved. NA Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 10.500 Km 10.500 Km 09.11.2023 19 2. Railways : NIL 3. Non-Forest Tree felling : NA 4. Utility Shifting : Water Supply pipelines : NA Electrical utility : Completed. (100% ) 5. Other Issues: Nil 6. Issues with Contractor – Manpower/machinery has been mobilized at site. Plan and Profile is approved by AE for 6.7 Km stretch out of 10.500 Km. AE has conveyed approval for P & P from Km 0+300 to Km 03+200 on 22.07.2024 and from km 5+000 to Km 10+500 on 27.06.2024 excluding 1.7km within the stretch (Hill construction methodology approved for earlier withheld length of 1.700 Km on 07.11.2024). EPC Contractor has not submitted the P & P from km 0+00 to km 0+300. Delay from EPC Contractor regarding sub-soil investigation of bridges/viaduct. The EPC Contractor has completed SSI at Ch. 1+600 , Ch. 3+000, Ch. 3+700 , Ch. 8+760 and Ch. 9+880 and SSI pending at 2 other locations. Geotech reports for Ch. 9+880, Ch. 3+000 , Ch. 3+700 and Ch. 8+760 is yet to be submitted by EPC Contractor. 7. Action Taken: Cure notice under article 23.1.( i ) (60days) has been issued by Competent Authority on 05.07.2024 due to delay in fulfillment of contractor obligations and slow progress notices for delay in completion of Pre-Construction activities have been issued by AE/PMU to EPC Contractor. The meeting was called by ED(P) RO-Kohima on 26.07.2024 , 13.08.2024 , site inspection on 26.11.2024 and meeting on 18.12.2024 , 12.02.2025 and 18.02.2025 where AE and contractor was directed to visit the site and resolve the issues with design team at project site. The proposals of COS with detailed cost estimate (2 options ) for VOP at Ch. 7+640 has been submitted by contractor on 14.02.2025 , the same is under review with AE. The proposal for change in schedule B (VOP at Ch. 10+005 instead of VUP as per CA) is yet to be submitted by the EPC Contractor till date. Drone videography and contour survey data has been submitted by EPC Contractor related with COS at Ch. 1+920 (bridge ), for which HQ,NHIDCL has directed the AE to detailed investigate/survey of the affected stretch and submit the proposal. The proposal of COS with detailed cost estimate and SSI reports at Ch. 4+700 in lieu of Box Culvert is yet to be submitted by EPC Contractor. Milestone I II III Completion Req. Prog. 10% 35% 70% 100% Schedule 27.11.2024 27.08.2025 28.05.2026 08.11.2026 Extended - - - - Actual 24.12.2024 - - - Progress (%) As on date 1 month ago 6 months ago Physical 11.54 11.01 1.2 Financial 10.93 10.93 - Major Structures Design/ Drawing Status Foundation Sub-Structure Super-structure Major Bridge (08 nos.) - 38/2.28/1 no 38/0/0 no 30/0/0 span Minor Bridge (0 nos.) - - - - Viaduct (….nos.) - - - - VUP ( 01 nos.) - 01/0/0 01/0/0 01/0/0 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Brand Eagles Authority’s Engineer M/s CEMOSA(JV) PCPL in Association with M/s Design Line Consultancy Services PMU Jakhama TPC & AAFS Date Rs. 350.88 Cr. dated 16.12.2022 Awarded Cost 216.00 Cr. Date of LOA 05.09.2023 Appointed Date 09.11.2023 Schedule / Likely Completion 08.11.2026 Contract Length 10.500 Km Broad Scope of work :- (Completed/Ongoing/Total) Construction Targets vs Ach. For F.Y 24-25 : 1.000 / 1.200 KM Total Comp. Ong. Total Comp. Ong. Hill Cutting/ Formation cutting 7. 030 Km 5.880 0.150 Culverts 50 Nos 0.00 0.00 Sub-grade 7.030 Km 2.800 0.050 Drains 10908 m 280.00 90.00 GSB/ CTSB 9.230 Km 1.200 0.00 Retaining Wall 900 m 266 0.00 WMM 9.230 Km 1.200 0.00 Breast Wall 4614 m 688 0.00 DBM 9.230 Km 1.200 0.00 Seeding and Mulching 31530 Sq.m. 0.00 0.00 BC 9.230 Km 0.00 0.00 Soil nailing 8231 m . 0.00 0.00

20

Status as on: 24.02.2025 12. Name Of Project: - Construction of two lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from Design Km 10.500 to design Km 21.000 in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) Revenue Land (ha) 3A date 3D date Compensation amount with CALA(LA+ Dmg. Comp) Amount disbursed Land Made available Mutation status 36.06 NA 28.68 Cr 28.68 Cr 36.06 Ha Yet to be done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved. NA Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 0.00 Km 10.500 Km 30.08.2023 21 2. Other issues Hindrance (Total = 220 m) is affecting construction works. 1. The latest NOC dated 04.09.2024 is received from District Administration, Kohima for total project length of 10.500 Km. 2. Works halted by landowner at Km 11+600 for houses located 5mtr from the ROW near eastern portal of tunnel in apprehension of damages as formation is to be achieved 30m below OGL . 3. Hindrances from Km 11+800 to Km 11+860 for cracks developed at under-construction building located nearly 30-40 m away from ROW and allegedly demanding 1.25 Cr. for the repair of the same. 4. Hindrance from Km 12+180 to 12+240: Landowner not allowing clearance of landslide & excavation works for want of construction of RCC retaining wall in the stretch. Issues raised with District Admin. for resolution on 04.02.2025 and 17.02.2025. However, PMU has also directed the EPC Contractor vide letter dated 30.12.2024 for immediate commencement of protection works for resolution of the hindrances. AE approved Construction Methodology & Restoration Plan already submitted by contractor on 14.10.2024. As per directions of Hon’ble Minister, RT&H during meeting dated 21.10.2024, Shri . Harpal Singh, from Zojilla Tunnel visited the Tunnel for valued inputs on the restoration plan. Inputs shared on 02.12.2024 was incorporated by Contractor in restoration plan and submitted on 10.12.2024. Tunnel expert committee has visited the site on 04.01.2025 and report has been submitted on 20.01.2025 & the same has been forwarded to AE & contractor for incorporation of the recommendations in the revised restoration plan which is yet to be submitted by contractor. Meanwhile, after meeting chaired by Dir-T(I) on 06.02.2025 at HQ, NHIDCL, EPC Contractor summited tentative cost for COS without any basis for restoration works of tunnel, additional COS for balance length of tunnel and for micro piling at the portals. AE informed that for cost optimization, Contractor needs to submit detailed cost with item-wise break up proposed to be used in the tunnel substantiated with designs and proper justification. 3. Issues with Contractor – The works at site does not commensurate with required progress. EPC Contractor has initiated Arbitration Petition under section 11(6) of Arbitration and Conciliation Act on 24.08.2023 for resolution of disputes. SOC is filed by the claimant on 15.03.2024. SOD & Counter Claim filed by NHIDCL on 31.05.2024. Affidavit for admission / denial has been submitted by both the parties. The arbitration hearing was held on 05.12.2024 and both parties to file affidavits for witness examination within 06 weeks. Witness examination of claimant is scheduled on 21.02.2025 & 22.02.2025. Witness examination of respondent is scheduled on 01.03.2025.& 02.03.2025. 4. Action Taken - The local hindrances were discussed with DC, Kohima, D eputy CM , Nagaland during meeting on 16.10.2024 & 28.01.2025, Hon’ble Minister, RT&H during meeting on 21.10.2024 and during meeting with CS , GoN on 18.01.2025 for resolution of the issues. Milestone I II III Completion Req. Prog. 10% 35% 70% 100% Schedule 28.06.2021 27.12.2021 28.06.2022 15.10.2022 Extended - 04.11.2022 09.11.2023 01.09.2024 Actual 09.07.2021 02.12.2022 Not Achieved - Progress (%) As on date 1 month ago 6 months ago Physical 65.42% (including COS) 64.15 62.21 Financial 60.99% 60.99 60.99 Major Structures Design/ Drawing Status Foundation Sub- Structure Super- structure Minor Bridge (COS- 3 nos.) Approved 06/06/00 no 06/ 04/ 02 no 03/ 01 / 01 span Major Bridge (1 nos.) Approved 02/ 02/ 00 no 02/ 02/ 00 no 01/ 00/ 01 span Viaduct (….nos.) - - - - ROB/RUB (…..nos.) - - - - 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Bharat Constructions (India) Pvt. Ltd. Authority’s Engineer M/s CEMOSA(JV) PCPL in Association with M/s Design Line Consultancy Services PMU Jakhama TPC & AAFS Date Rs. 277.44 Cr. dated 07.07.2020 Awarded Cost Rs. 177.00 Cr. (excl. GST) + COS- Rs 9.16 (excl. GST) Revised Cost- 186.16 Cr (excl. GST) Date of LOA 25.09.2020 Appointed Date 15.10. 2020 Schedule / Likely Completion 15.10.2022 / 30.06.2026 Contract Length 10.500 Km Broad Scope of work :- (Completed/Ongoing/Total) DELAYED Construction Targets vs Ach. For F.Y 24-25 : 0.680 / 0.880 KM Total Comp. Ong. Total Comp. Ong. Sub-grade 9.92 Km 9.420 0.050 Tunnel 0.500 m 0.115 0.00 GSB 9.92 Km 8.750 0.00 Seeding and Mulching 42040 Sqm 30798 0.00 WMM 9.92 Km 8.702 0.00 Drain 10.24 Km 8.191 0.00 DBM 9.92 Km 8.307 0.00 Retaining Wall 1080 m 1080 00 BC 9.92 Km 5.960 0.00 Breast Wall 4300 m 4300 00 Culverts 57 Nos. 50 01 W Beam Crash Barrier 2700 m 2058

22 Name of Project : Construction of two lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from Design Km 10.500 to design Km 21.000 in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)

Status as on: 24.02.2025 13. Name Of Project: - Construction of two lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from Design Km 21.000 to design Km 32.268 in the state of Nagaland Under SARDP-NE on EPC Mode (Package III) Revenue Land (ha) 3A date 3D date Compensation amount with CALA(LA+ Dmg. Comp) Amount disbursed Land Made available Mutation status 37.10 NA 43.30 Cr 39.60 Cr 36.70 Ha Yet to be done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved. NA Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 9.265 km 11.148 Km [Including sub-judicious stretch of 1.343 Km ( now disposed of)] NA 23 2. Utility Shifting : Water Supply pipelines : NA Electrical utility : T&G – Completed; D&R – under progress 3. Other Issues: NOC received from DC, Kohima for 11.148 Km on 19.02.2024 with remarks- 1.378 km is sub-judice. However, the Writ Petition has now been disposed of vide Hon’ble GHC, Kohima Bench judgment dated 29.11.2024. NOC for 0.120 Km out of 11.268 Km is pending with DC, Kohima for pending submission of ownership details and disbursement of LA compensation. Writ Petition(Civil) No. 50/2022 involving the land acquisition issues filed by the land owners at Hon’ble Gauhati High Court, Kohima Bench was heard for final hearing on 18.11.2024 and the Writ Petition has been disposed of on 29.11.2024 with a direction to the respondents to take steps for payment of fair & just compensation to the landowners. 4. Issues with Contractor- Plan and Profile has been approved for 10.2 Km from km 21+000 to 25+400 km on 28.10.2023, from km 25+400 to km 29+300 on 23.01.2024, from 29+300 to 29+800 and from 30+300 to 31+700 on 04.06.2024. Submission of Plan & Profile for balance stretch is pending from Contractor. Design and Drawings for Bridges (2 Nos.) and Viaduct (01 Nos.) are yet to be submitted by Contractor. EPC Contractor has completed the sub-soil investigation work for all the bridges/viaducts (7 Nos.). .However, EPC Contractor is yet to submit the Geo-Technical investigation report for 3 nos. of bridges/viaduct. 5. Action Taken: Cure notice under article 23.1.(i) (60days) has been issued by Competent Authority on 13.01.2025 due to delay in fulfillment of contractor obligations and slow progress . The local hindrances were discussed with DC, Kohima, Deputy CM, Nagaland during meeting on 28.01.2025 , Hon’ble Minister, RT&H during meeting on 21.10.2024 and during meeting with CS , GoN on 18.01.2025 for resolution of Hindrances. In compliance of demolition order issued by DC, Kohima dated 05.12.2024 for removal of standing structure within RoW, the demolition drive has been completed on 11.12.2024 from 29+800 to 30+170. Progress (%) As on date 1 month ago 6 months ago Physical 21.62 19.36 15.33 Financial 17.97 17.97 12.36 Major Structures Design/ Drawing Status Foundation Sub-Structure Super-structure Minor Bridge ( 02 nos.) Yet to submit 4/0/0 4/0/0 2/0/0 Major Bridge (01 nos.) Yet to submit 2/0/0 2/0/0 1/0/0 Viaduct (04 nos.) 02 Approved. 02 Nos y et to submit 25/0/0 25/0/0 21/0/0 ROB/RUB (…..nos.) - - - - 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Niraj Cement Structurals Limited Authority’s Engineer M/s CEMOSA(JV) PCPL in Association with M/s Design Line Consultancy Services PMU Jakhama TPC & AAFS Date Rs. 342.29 Cr. dated 16.12.2022 Awarded Cost Rs. 186.56 Cr. (excl. GST) Date of LOA 18.01.2023 Appointed Date 16.06.2023 Schedule / Likely Completion 15.06.2025 Contract Length 11.268 Km Broad Scope of work :- (Completed/Ongoing/Total) Milestone I II III Completion Req. Prog. 10% 35% 70% 100% Schedule 27.02.2024 27.08.2024 25.02.2025 15.06.2025 Extended - - - - Actual 22.03.2024 Not Achieved - - Construction Targets vs Ach. For F.Y 24-25 : 2.000/ 0.200 KM Total Comp. Ong. Total Comp. Ong. Hill Cutting 8.448 Km 6.375 0.00 Culverts 64 Nos. 27 Sub-grade 8.448 Km 4.520 0.00 Seeding and Mulching 10510 0.00 0.00 GSB 10.448 Km 3.250 0.100 Drain 11942 0.00 0.00 WMM 10.448 Km 1.200 0.150 Retaining Wall 1210 446 105 DBM 10.448 Km 0.200 0.000 Breast Wall 4390 1915 20 BC 10.448 Km 0.000 0.000 Soil Nailing (m) 7000 0.00 0.00

24

2. Utility Shifting : Water Supply pipelines : Completed Electrical utility : DoP (T&G) – Completed, DoP (D & R) – Completed 3. Other Issues: NOC is received from DC, Kohima for 11.454 Km on 19.02.2024 with remarks- 1.920 Km is sub-judice. However, Writ Petition (Civil) No. 50/2022 involving the land acquisition issues filed by the land owners at Hon’ble Gauhati High Court, Kohima Bench was heard for final hearing on 18.11.2024 and it has been disposed off on 29.11.2024 with a direction to the respondents to take steps for payment of fair & just compensation to the landowners. Approval of Annulment of Realignment stretch affecting 1.15 Km has been approved by HQ NHIDCL on 08.04.2024 and the same has been conveyed to Contractor on 13.04.2024. P & P in accordance with the scope as per CA is yet to be submitted by contractor till date and therefore, is yet to be got approved by the AE for Km 40+580 to Km 43+454. Moreover, a meeting was convened on 18.12.2024 and 12.02.2025 with AE, contractor, PMU & RO for last 3 km to discuss the EPC Contractor ‘s Claim of COS for 2 nos. of Bridges and 1 Nos. Viaduct, however, any clear-cut response in this regard is still awaited. During site visit of the Hon’ble Chief Secretary, GON on 18.01.2025, it has been directed to complete the road stretch from Km 32+000 to Km 35+000 for vehicular movement. 4. Issues with Contractor: The Contractor has filed the Petition of Arbitration Claim under Section 17 on 15.09.2023, for seeking interim measures of protection. Last hearing regarding arguments on Section 17 was held on 04.03.2024 and the same has been disposed off on 04.03.2024. The proceedings for recording of evidences has been conducted on 31.07.2024 and next date of recording of evidences has been scheduled on 11.03.2025. Despite repeated reminders, the Damaged PMGSY Road (Ch. 40+300) affected in a length of 0.060 Km is not yet taken up by EPC Contractor for restoration. Despite repeated reminders, Contractor yet to start Landslide Mitigation measures at the landslide prone stretches. At Ch. 33+900, a minor bridge ( COS) is required at site instead of culvert as per CA. The separate proposal is initiated by contractor and currently with the AE. The progress of the Contractor was being monitored as agreed during meeting held on 21.10.2024 under the chairmanship of the Hon’ble Minister, RT&H for next two months. Accordingly, in failing to achieve any substantial progress, the EPC Contractor has been served Notice for Intention to Terminate the Contract on 18.01.2025. Action Taken The local hindrances were discussed with the DC, Kohima, Deputy CM, Nagaland during meeting on 16.10.2024, with the Hon’ble Minister, RT&H during meeting on 21.10.2024, with the Revenue Officer, DC office, Kohima on 13.01.2025 and with the Hon’ble CS, GoN during meeting on 18.01.2025 for resolution of Hindrances. Furthermore, a joint verification is scheduled on 21 st Feb’2025. EPC Contractor declared as Non-Performer on 07.03.2023. Fresh Cure Notice period for 60 days under Cl. 23.1(i) of Contract Agreement has been issued to the EPC Contractor on 24.06.2024. However, the Contractor during meeting held under the chairmanship of Dir (T )-I at HQ , NHIDCL on 06.02.2025 had requested for extension of cure period. The same is also requested by EPC Contractor vide their letter dated 21.08.2024. PMU in this regard has forwarded a letter to RO-Kohima on 22.08.2024. During meeting held on 21.10.2024 under the chairmanship of the Hon’ble Minister, RT&H, it has been directed to closely monitor the progress and to take suitable action, if no substantial progress is observed in next two months. The EPC Contractor has been served Notice for Intention to Terminate the Contract on 18.01.2025. AE has been directed to prepare the schedule for balance works, which shall be submitted after taking a decision on the matter. Status as on: 24.02.2025 14. Name Of Project: - Construction of two lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from design km 32.000 to km 43.454 in the state of Nagaland under SARDP-NE on EPC mode (Package-IV) Milestone I II III Completion Req. Progress 10% 35% 70% 100% Schedule 25.04.2021 09.09.2021 25.01.2022 17.04.2022 Extended 13.03.2022 01.07.2024 16.11.2024 06.02.2025 Actual 13.03.2022 Not achieved Not achieved Not achieved Progress (%) As on date One month ago 6 months ago Physical 27.58 26.96 26.90 Financial 25.04 25.04 23.27 Revenue Land (ha) 3A date 3D date Compensation amount with CALA (LA+ Dmg. Compen) Amount disbursed Land Made available Mutation status 42.06 NA 37.23 Cr 32.38 Cr 42.06 Ha Yet to be done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved. NA Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 0.00 Km 11.454 Km [Including sub-judicious stretch of 1.920 Km (now disposed off)] 19.02.2024 (As per NOC) 25 Major Structures Design / Drawing Status Foundation Sub-Structure Super-structure Minor Bridge (1 nos.) Approved 00/00/ 01 no 00/ 00/ 04 no 00/ 00/ 03 span Major Bridge (1 nos.) Approved 00 /00/ 03 no 00 / 00/ 03 no 00/ 00/ 02 span Viaduct (….nos.) - - - - ROB/RUB (…..nos.) - - - - 1. Land Acquisition & Forest Clearance :- Scheme SARDP-NE Contractor M/s Pele Khezhie Authority’s Engineer M/s CEMOSA(JV) PCPL in Association with M/s Nexgen Infra Solution PMU Jakhama TPC & AAFS Date Rs. 202.36 Cr. dated 31.07.2020 Awarded Cost Rs. 118.56 Cr. (excl. GST) Date of LOA 14.08.2020 Appointed Date 15.10. 2020 Schedule / Likely Completion 17.04.2022 / 31.03.2026 Contract Length 11.454 Km DELAYED Broad Scope of work :- (Completed/Ongoing/Total) Construction Targets vs Ach. For F.Y 24-25 : 2.530 / 1.030 KM Total Comp. Ong. Total Comp. Ong. Formation Cutting 11.45 Km 8.100 0.100 Seeding and Mulching 21020 Sq.m 3500 Sub-grade 11.45 Km 7.900 0.200 Culverts 67 16 02 GSB 11.45 Km 6.178 0.400 Drain 11.456 2.090 0.100 WMM 11.45 Km 4.200 0.500 Retaining Wall 100 100 00 DBM 11.45 Km 2.500 0.00 Breast Wall 2890 905 00 BC 11.45 Km 0.260 0.00

26

Status as on: 24.02.2025 15. Name Of Project: - Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under NH(O) –TSP in the state of Nagaland in EPC mode. Milestone I II III Completion Req. Progress 10% 35% 70% 100% Schedule 30.04.2021 14.09.2021 30.01.2022 22.04.2022 Extended 10.08.2022 27.10.2022 10.03.2024 31.05.2024 Actual 18.06.2022 31.07.2023 19.07.2024 Not achieved Progress (%) As on date One month ago 6 months ago Physical 74.23 74.23 73.57 Financial 72.13 72.13 72.13 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status NA Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved. Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability - 26.794 Km Work is being executed on the available existing width. 27 2. Utility Shifting : Water Supply pipelines : N/A Electrical utility : DoP N/A 3. Other Issues: 4. Issues with Contractor: The contractor has self terminated the contract on 18th September 2024 with the leave of the Hon’ble Courts, but the same is not accepted by NHIDCL. 5. Action Taken EPC Contractor declared as Non-Performer on 13.02.2023. Notice for intention to Terminate the Contract issued by HQ, NHIDCL to EPC Contractor on 16.03.2023. The matter of SLP(C) No. 9904-9905/2023 at Hon’ble Supreme Court has been disposed of after hearing held on 18.12.2024. Accordingly necessary action. Fresh Notice for intention to terminate the contract under clause 23.1(ii) of contract agreement has been issued by Competent Authority to M/s Fortune Group on 17.01.2025. Further recommendation for issuing Termination Notice is under preparation considering the reply furnished by the EPC contractor. The next date of hearing before Hon’ble High Court Kohima Bench regarding PIL 01/2022 is listed on 05.03.2025. In the absence of EPC Contractor and due to non-performance by the EPC Contractor , two STMC contracts were initiated by RO Kohima with due permission from the Hon’ble High Court at the risk and cost of the original contractor as section –I (km 185.540 to km 194.00 ) and section –II (km 194+00 to km 212.334 ) amounting to Rs 9.80 Cr and 11.12 Cr with time period of 2 months and 3 months respectively and DLP of 6 months each. Physical Progress of section I: 97.12 % and Section II: 81.27%. Moreover, balance work of Kohima Mao Road will be ascertained only after the completion of the STMC Contracts and assessing stability of gabion retaining walls constructed at sinking and landslide locations along the stretch which are under close monitoring. Meanwhile, Competent Authority published NIT on 20.01.2025 for balance work of 9.3 Km DBM and 17.2 Km BC and other maintenance works under STMC. LOA issued on 19.02.2025 to M/s Vechupa Rose & Co. Major Structures Design / Drawing Status Foundation Sub-Structure Super- structure Minor Bridge (5 nos. repair) NA - - 0/0/05 span Major Bridge ( nos.) - - - - Viaduct (….nos.) - - - - ROB/RUB (…..nos.) - - - - 1. Land Acquisition & Forest Clearance :- Broad Scope of work :- (Completed/Ongoing/Total) Scheme NH (O)- TSP Contractor M/s Fortune Group. Authority’s Engineer M/s CEMOSA(JV) PCPL in Association with M/s Nexgen Infra solution PMU Jakhama TPC & AAFS Date Rs. 315.63 Cr. dated 01.10.2020 Awarded Cost Rs.167.23 Cr. (excl. GST) revised to Rs. 120.18 Cr. Date of LOA 30.09.2020 Appointed Date 20.10. 2020 Schedule / Likely Completion 22.04.2022 / 28.02.2025 Contract Length 26.794 Km TERMINATED Construction Targets vs Ach. For F.Y 24-25 : 2.140 /2.140 KM Total Comp. Ong. Total Comp. Ong. Sub-grade 19.09 Km 19.034 0.00 Culverts 102 Nos 92 04 GSB 19.09 Km 19.034 0.00 W Beam Crash Barrier 12909 m 0.00 0.00 WMM 19.09 Km 1 9.034 0.00 Drains 26.22 Km 19.175 0.300 DBM 26.794 Km 17.563 0.00 Retaining Wall 6024 m 4127 50 BC 26.794 Km 8.713 0.00 Breast Wall 1010 m 963 00

Status as on: 24.02.2025 16. Name Of Project: Construction of balance work of two lane with hard shoulder of Kohima-Jessami Road on NH-29 From [ Design Km 29.6 to design Km 51.5] [Length - 21.90 Km] in the state of Nagaland under Bharatmala Pariyojana on EPC Mode ( Package II ) Scheme NH (O)- TSP Contractor M/s Ratna Infrastructure Projects Pvt Ltd Authority’s Engineer M/s Geo Designs & Research Pvt. Ltd. PMU Pfutsero TPC & AAFS Date Rs. 355.79 Cr Dated (N.A) Awarded Cost Rs. 69 Cr. (excl. GST) Date of LOA - 10.10.2023 Appointed Date - 05.01.2024 Schedule / Likely Completion - 04.01.2026/ 04.01.2026 Contract Length 21.900 Km Milestone I II III Completion Req. Prog. 10% 35% 70% 100% Schedule 16.09.2024 18.03.2025 17.09.2025 04.01.2026 Extended - - - - Actual - - - - Progress ( %) As on date One month ago 6 months ago Physical 8.52 % 4.70 % 3.63 % Financial Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status NA 25.61 Cr 25.44 Cr 51.04 Ha NA Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 21.900 1. Land Acquisition & Forest Clearance :- 2. Railways : Nil 3. Non-Forest Tree felling : NA 4. Utility Shifting:- Water Supply pipelines: Completed (100% progress) Electrical utility: Completed (100% progress) HT Tower: Completed (100% progress) 5. Other Issues:- The mobilization for Manpower, Machinery and Material at the project site is inadequate since the A ppointed Date. I ntention to Termination notice to the EPC Contractor has been issued on 18.01.2025. T he EPC Contractor has replied the same which is not justified. Subsequently , the Authority's Engineer has submitted para wise comments on 09.02.2025 which is under scrutiny at PMU. Further, STMC tender at the Risk & Cost of EPC Contractor has been invited to keep the road in traffic worthy condition. 28 Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) - - - - Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Total Comp. Ong. Total Comp. Ong. Sub-grade 4.211 Culverts 48.5 0.5 1 GSB 5.412 Drains 14536 159 WMM 11.63 Retaining Wall 234 DBM 13.864 Breast Wall 2326 778 108 BC 21.804 Special Slope Protection 122468 - - Broad Scope of Work :- (Completed/Ongoing/Total) Construction Targets vs Ach. For F.Y 24-25 : 4.00 / 0.00 KM

Name of Project:- Construction of balance work of two lane with hard shoulder of Kohima-Jessami Road on NH-29 From [ Design Km 29.6 to design Km 51.5] [Length - 21.90 Km] in the state of Nagaland under Bharatmala Pariyojana on EPC Mode (Package II) 8.52%

Land Acquisition & Forest Clearance :- Milestones I II III Completion Req. Prog. 10% 35% 70% 100% Schedule 04.08.2024 03.02.2025 05.08.2025 22.11.2025 Extended - - - - Actual 29.05.2024 11.12.2024 - - Progress (%) As on date 01 Month ago 6 months ago Physical 59.723% 51.094% 29.866% Financial 53.064% 43.100% 23.896% 30 Broad Scope of Work :- (Total/Completed/Ongoing/) Total Comp. Ong. Total Comp. Ong. Formation 3.533 3.150 0.200 Culverts 87 69.55 7 Sub-grade 8.566 7.480 0.200 Drains 19806 12627 650 GSB 9.136 8.050 0.250 Retaining Wall 1509 1130 125 WMM 16.953 12.023 0.850 Breast Wall 7411 5072 115 DBM 21.397 13.052 0.600 Special Slope Protection 17606 11518 800 BC 21.397 1.643 0.400 Seeding & Mulching 73202 61090 750 Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (02nos.) Major Bridge (…..nos.) Viaduct (.....nos.) Viaduct (Length) ROB/RUB (.....nos.) Construction Targets vs Ach. For F.Y 24-25 : 8/ 14.10 Km Scheme NH (O)- TSP Contractor M/s Kaushal Sharma in JV with M/s Prachi Infra & Roads Pvt. Ltd. Authority’s Engineer Planning & Infrastructural Development Consultants Pvt. Ltd. PMU Pfutsero TPC & AAFS Date Rs. 330.80 Cr dated 30.03.2020 Awarded Cost Rs. 110.73 Cr. (excl. GST) Date of LOA 22.09.2023 Appointed Date 23.11.2023 Schedule / Likely Completion 21.11.2025 Contract Length 21.500 Km Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status NA 34.03 Cr 33.78 Cr 51.22 Ha NA Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability Km 21.500 Km 24.12.2020 1. Land Acquisition & Forest Clearance :- 2. Railways : Nil 3. Non-Forest Tree felling : 28584 trees cut of 28584 trees 4. Utility Shifting: Water Supply pipelines: Completed. (100% progress) Electrical utility: Completed . (100% progress) HT Tower: Completed . (100% progress) EPC Contractor has been executing the work as per the approved work program. Positive COS received by AE on 20.02.2025 and the same is under scrutiny at PMU. Status as on: 24 .02.2025 19. Name of Project: - "Balance work of Construction of Two-lane with hard shoulder of Kohima – Jessami on NH- 29 from existing Km 98.380 to existing Km 120.367 (Design Km 95.700 Km to 117.200 Km (Package-V) under" Bharatmala Pariyojana on EPC mode" ( Package- V )

31

Land Acquisition & Forest Clearance :- Status as on: 24.02 .2025 19. Name Of Project: - Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Akash Bridge section of NH-202 for Package-I (Design Km 283+000 to Km 325+440) in the State of Nagaland on EPC mode under NH (O)-NE- Package-I Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 07.05.2023 21.12.2023 05.08.2024 20.01.2025 Extended - - - - Actual 20.01.2023 22.09.2023 14.06.2024 17.01.2025 Progress (%) As on date 01 Month ago 6 months ago Physical 100.00 93.92 74.10 Financial 95.080 90.06 70.69 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status NA 78.38 Cr 73.49 Cr 103.18 Ha NA Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 42.440 Km 42.440 Km (100%) 23-06-2022 32 Broad Scope of Work :- (Completed/Ongoing/Total) 1. Land Acquisition & Forest Clearance :- 2. Railways : Nil 3. Non-Forest Tree felling: : 56202 trees cut out of 56202 trees 4. Utility Shifting:- Water Supply pipelines: 100% Completed Electrical utility: 100% Completed Status: Project physically completed on 17.01.2025 & tests as per Schedule-K is under progress by the EPC Contractor. Scheme NH (O) - NE Contractor M/s KKB-YND (JV) Authority’s Engineer M/s Artefact Projects Ltd in Association M/s MS Consultant PMU Pfutsero TPC & AAFS Date 605.36 Cr dated 25.03.2022 Awarded Cost Rs. 275 Cr. (excl. GST) Date of LOA 30 th March 2022 Appointed Date 23 rd June 2022 Schedule / Likely Completion 20 th Dec 2024 / 20 th January 2025 Contract Length 42.440 Km Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) Approved 10/0/ 10 nos 10/ 0/ 10 nos 05/00/ 05 spans Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 15.910/ 15.910 KM Total Comp. Ong. Total Comp. Ong. Sub-grade 42.34 42.34 Culverts 206 206 GSB 42.34 42.34 Drains 45.39 4 5.39 WMM 42.34 42.34 Retaining Wall 2960 2960 DBM 42.34 42.34 Breast Wall 11300 11300 BC 42.34 42.34 Special Slope Protection 282620 282620

. . 33 Project Name: Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode under NH (O)-NE

Status as on- : 24.02.2025 19. Name of Project: - Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode under NH (O)-NE Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 60.30 Cr 59.96 Cr 84.96 Ha Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status Land Acquisition :- Scheme Contractor Mayasheel Construction- JSP Project PL (JV) Authority’s Engineer M/s AEPL-AEPL (JV) PMU Pfutsero TPC & AAFS Date 430.24 Cr 16 th Dec 2022 Awarded Cost 187.89 Cr. Date of LOA 23.03.2023 Appointed Date 24.08.2023 Schedule / Likely Completion 23.02.2026 / 23.02.2026 Contract Length 34.795 Km Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 90% 100% 24.08.2023 Milestones I II III IV Req. Prog . 10% 30% 60% 100% Schedule 09.07.2024 22.02.2025 09.10.2025 23.02.2026 Extended - - - - Actual 28.03.2024 07.02.2025 - - 2. Railways : 4. Non-Forest Tree felling : 3. Defence : % As on date 1 month ago 6 months ago Physical 37.08 34.68 15.78 Financial 33.32 27.00 12.57 Broad Scope of work :- (Completed/Ongoing/Total ) 5. Utility Shifting : Water Supply pipelines : Yet to be started (0% progress) Electrical utility : Yet to be started (0% progress) Other Issues: Hindrance of 0.500 Km due to non-dismantling of compensated structures. DC, Meluri has been requested to intervene in the matter and resolve the issue at the earliest. PMU is in close co-ordination with District Administration for resolving the issue at the earliest. Note: The EPC Contractor has been executing the work at site as per the approved work program. Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) - - - - Major Bridge (…..nos.) Approved 00/00/0 2 00/00/02 00/00/01 Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Total Comp. Ong. Total Comp. Ong. Sub-grade 34.72 30.200 0.500 Culverts 140 27 10 CTSB 34.72 26.400 0.250 Drains 38128 CTB 34.72 5.200 0.500 Retaining Wall 5084 1920 300 AIL 34.72 2.900 0.300 Breast Wall 6379 3392 250 BC 34.72 0.600 0.300 Special Slope Protection 63473 Construction Targets vs Ach. For F.Y 24-25 : 17.00 / 2.90 KM

. . 35 Project Name: Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode under NH (O)-NE

Status as on: 24.02 .2025 20. Name of Project: - Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (0)-NE Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 41.64 Cr 41.49 Cr 85.68 Ha Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status Not Applicable Land Acquisition & Forest Clearance :- Scheme Contractor KKB Projects Pvt. Ltd. (KKBPPL) Authority’s Engineer M/s AEPL-AEPL (JV) PMU Pfutsero TPC & AAFS Date 442.54 Cr 16 th Dec 2022 Awarded Cost 220.79 Cr Date of LOA 08.02.2023 Appointed Date 24.08.2023 Schedule / Likely Completion 23.02.2026 / 23.02.2026 Contract Length 35.080 Km Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 100% 100% 24.08.2023 Milestones I II III IV Req. Prog . 10% 30% 60% 100% Schedule 09.07.2024 22.02.2025 09.10.2025 23.02.2026 Extended - - - - Actual 26.07.2024 In progress - - 2. Railways : NIL 5. Utility Shifting : Water Supply pipelines : In Progress (40% progress) Electrical utility : Work Completed (100 %). 6. Other Issues: Inadequate deployment of technical staff . Slow Progress of work at site. 4. Non-Forest Tree felling : 6502/ 37065 3. Defence : NIL % As on date 1 month ago 6 months ago Physical 17.90 14.49 10.57 Financial 11.75 7.96 7.96 Broad Scope of work :- (Completed/Ongoing/Total) Total Comp. Ong. Total Comp. Ong. E/W upto SG 35.04 31.20 0.70 Culverts 122 57 8.0 Sub-grade 35.04 26.30 0.35 Drains 40.73 0.0 0.0 GSB 35.04 1.90 0.50 Retaining Wall 3.926 0.065 0.15 WMM 35.04 0.0 0.0 Breast Wall 11.997 0.772 0.10 D BM & BC 35.04 0.0 0.0 Special Slope Protection 118530 0.0 0.0 Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge ( 1 nos.) Approved 0 / 0 / 2 0 / 0 / 2 0 / 0 / 1 Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - Viaduct (Length) ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 23-24 : 13.000 / 0.000 KM

37 Project Name: Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (0)-NE

Status as on: 24.02 .2025 25. Name of Project - W idening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH (O)-NE Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 41.64 Cr 41.49 Cr 88.72 Ha Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status Land Acquisition :- Scheme Contractor New India Contractors & Developers Pvt. Ltd.- BCC Buildtech Pvt. Ltd. (JV) Authority’s Engineer M/s AEPL-AEPL (JV) PMU Pfutsero TPC & AAFS Date 497.18 Cr 16 th Dec 2022 Awarded Cost 272.59 Cr Date of LOA 08.02.2023 Appointed Date 26.08.2023 Schedule / Likely Completion 25.02.2026 / 25.02.2026 Contract Length 36.941 Km Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 99.50% 100% 14.08.2023 Milestones I II III IV Req. Prog. 10% 30% 60% 100% Schedule 11.07.2024 24.02.2025 11.10.2025 25.02.2026 Extended - - - - Actual 28.03.2024 30.10.2024 - - 2. Railways : 5. Utility Shifting : Water Supply pipelines : Yet to be started (0% progress) Electrical utility : Yet to be started (0% progress) Note: The EPC Contractor has been executing the work as per approved work programme. 4. Non-Forest Tree felling : 3. Defence : % As on date 1 month ago 6 months ago Physical 47.44% 46.17% - Financial 44.59% 39.99% - Construction Targets vs Ach. For F.Y 23-24 : 17.000 /1.300 KM 38 Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (…nos.) - - - - Major Bridge (…..nos.) - - - - Viaduct (.....nos.) - - - - ROB/RUB (.....nos.) - - - - Total Comp. Ong. Total Comp. Ong. Sub-grade/ HC 36.93 27.51 0.40 Culverts 127 88 2 GSB 36.93 26.40 0.30 Drains 45949 15000 100 WMM 36.93 12.00 0.35 Retaining Wall 5936 4230 100 DBM 36.93 1.30 0.30 Breast Wall 11985 6640 175 BC 36.93 0.00 0.00 Special Slope Protection 202712

39

Status as on : 24.02.2025 23. Name Of Project: - C onstruction of Balance work of two-Lane with hard Shoulders of Merangkong - Tamlu -Mon Road on EPC basis from Design Km 20.000 To Km 40.000 Design Length-20.00 Km ( PKG-II ) in the state Nagaland under SARDP-NE”..PHASE-A Milestones I II III Completion Req. Prog. 10% 35% 70% 100% Schedule 03.05.2024 02.11.2024 04.05.2025 2 1.08.2025 Extended - - - - Actual 30.04.2024 31.10.2024 - - Progress (%)z As on date 1 month ago 6 months ago Physical 57.451% 48.660% 26.767% Financial 45.775% 45.775% 19.211 % Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status NA 6.18 Cr. 6.17 Cr. 86.735 Ha Not done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage-II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date( Appointed date has not declared) Today Date of 100% length availability 20.00 Km 20.000Km 31.12.2018 40 Scheme SARDP Contractor M/s-A. Pongshi Phom -M/s W. Chingkam Phom (JV) Authority 's Engineer AGICL-MA (JV) PMU Mon TPC & AAFS Rs - 215.79 Cr. Dated 22.03.2018 Awarded Cost Rs. 42.66 Cr. Date of LOA 09.06.2023 Appointed Date 2 2.08.2023 Scheduled/Likely Completion 21.08.2025 Contract Length  20.00 Km Broad Scope of work: (Total/Completed ongoing ) 1. Land Acquisition & Forest Clearance :- 2. Railways : Nil 3. Non-Forest Tree felling : 18106 trees cut out of 18106 trees 4. Utility Shifting : Water Supply pipelines: Completed. (100% progress ) Electrical utility: Completed (100% progress) Other Issues: Nil Site visit conducted by RO on 07.01.2025 . Major Structures Design/Drawing Status Foundation Sub-structure Super-structure Minor Bridge (3 nos.) Approved 5/04/01 5/04/01 4/00/01 Major Bridge( 0 nos.) - - - - Viaduct (0 nos.) - - - - ROB/RUB (0 nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 3.000/3.160 KM Total Comp. Ong. Total Comp Ong. Sub-grade 0.928 km 0.928 - Widening culvert 1 no 1no - GSB 1.656 km 1.213 0.200 km New culvert 3 no's 3 no's - WMM 1.956 km 1.475 0.300 km Drains 16386 rm 15710rm 500 DBM 5.159 km 3.160 0.800 km Retaining Wall 4001 rm 3835rm 100 BC 19.896 km 0.000 0.000 Breast Wall 1480 rm 1287rm 100 Culvert Balance work 84 nos. 84 nos. - Special Slope Protection 75757 sqm

41 Project Name: Construction of Balance work of two-Lane with hard Shoulders of Merangkong - Tamlu -Mon Road on EPC basis from Design Km 20.000 To Km 40.000 Design Length-20.00 Km (PKG-II) in the state Nagaland under SARDP-NE”..PHASE-A

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 24. Name of Project : - Construction of Balance work of Two Lane with hard Shoulder Merangkong - Tamlu -Mon Road on EPC basis from Design Km 63.800 to Km 86.835 (Existing Km 76.640 to Km 98.065) in the state of Nagaland under SARDP-NE (Pkg.-IV) Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 22.05.2024 21.11.2024 23.05.2025 09.09.2025 Extended Actual 20.05.2024 17.12.2024 Progress (%) As on date 01 Month ago 6 months ago Physical 41.22 36.96 16.03 Financial 35.23 35.23 14.00 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 5.42 Cr. 5.33 Cr. 75.902 Ha Not Done. Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 23.035 Km. 23.035 Km. 09.12.2021 42 Broad Scope of Work :- (Total/Completed/Ongoing/) 1. Land Acquisition & Forest Clearance :- 2. Railways : NIL 3. Non-Forest Tree felling: 9754/9754 4. Utility Shifting: Water Supply Pipelines: Completed Electrical utility: under progress (95% completed) 5. Other Issues: Nil. Action Taken: . AE has issued 8 th slow progress notice to the EPC Contractor on 01.10.2024 . Site Visit Conducted by RO -Kohima on 07.01.2025 Scheme SARDP-NE Contractor M/s- S.S Infrazone Private Limited-M/s Shyama Construction Authority’s Engineer M/s AGCIL-MA (JV) PMU MON Nagaland TPC & AAFS Date Rs . 323.98 Cr Dated: 22/03/2018 Awarded Cost Rs . 84.02 Date of LOA 09.06.2023 Appointed Date - 11.09.2023 Schedule / Likely Completion - 09.09.2025 Contract Length 23.035 Km. Total Comp. Ong. Total Comp. Ong. Sub-grade 3.990 2.953 0.100 Culverts 35 19 3 GSB 5.684 4.977 0.100 Drains 20025 5206 200 WMM 13.361 10.960 0.250 Retaining Wall 5605 3926 100 DBM 18.745 5.430 0.110 Breast Wall 3489 2140 150 BC 23.035 0.0 0.0 Special Slope Protection 94518 0.0 0.0 Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (02nos.) Approved 01 complete, 01 ongoing 01 01 Ongoing Major Bridge (0 nos.) - - - - Viaduct (.....nos.) - - - - Viaduct (Length) - - - ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 8.000 /3.06KM

43 Project Name: Construction of Balance work of Two Lane with hard Shoulder Merangkong - Tamlu -Mon Road on EPC basis from Design Km 63.800 to Km 86.835 (Existing Km 76.640 to Km 98.065) in the state of Nagaland under SARDP-NE (Pkg.-IV)

Land Acquisition & Forest Clearance :- Status as on: 24.02.2025 02. Name of Project: - Construction of Balance work of Two Lane with hard Shoulder Merangkong - Tamlu -Mon ( Wakching Town Portion) Road on EPC basis from Design Km 59.00 to Km 72.450 in the state of Nagaland under SARDP-NE (Pkg.-V) Milestones I II III Completion Req. Prog . 10% 35% 70% 100% Schedule 24.05.2024 18.11.2024 20.05.2025 06.09.2025 Extended - - - - Actual 15.03.2024 10.12.2024 - - Progress (%) As on date 01 Month ago 6 months ago Physical 46.29 37.20 23.24 Financial 35.42 35.42 20.37 Revenue Land (ha) 3A date 3D date Compensation amount with CALA Amount disbursed Land Made available Mutation status 16.14 Cr. 15.96 Cr. 54.23 Ha .Not Done Forest Land (ha) Stage-I date Working permission date Total no. of trees Trees felled Un- encumbered Land available Stage -II status No Forest Land Involved Total Un- encumbered length (ROW) available for construction As on Appointed Date Today Date of 100% length availability 13.450 Km. 13.450 Km. 13.450 Km. 44 Broad Scope of Work :- (Total/Completed/Ongoing/) 1. Land Acquisition & Forest Clearance :- 2. Railways : NIL 3. Non-Forest Tree felling: 3693/3693 4. Utility Shifting: Water Supply pipelines: Completed Electrical utility : under progress (99% progress) 5. Other Issues: Nil. Action Taken: AE has issued 9 th slow progress notice to the EPC Contractor on 01.10.2024, Site Visit Conducted by RO on 09.11.2024 Scheme SARDP-NE Contractor M/s A. Jayzee Construction Authority’s Engineer M/s AGCIL-MA (JV) PMU MON Nagaland TPC & AAFS Date Rs . 161.73 Cr Dated: 31/03/2021 Awarded Cost Rs . 52.63 Date of LOA - 19.07.2023 Appointed Date - 08.09.2023 Schedule / Likely Completion -06.09.2025 Contract Length 13.450 Km Total Comp. Ong. Total Comp. Ong. Sub-grade 5.804 5.732 0.100 Culverts 43.50 28.5 1 GSB 8.073 7.398 0.200 Drains 16.668 5.979 0.250 WMM 13.450 7.357 0.400 Retaining Wall 2592 141 00 DBM 13.450 5.670 0.200 Breast Wall 5055 1530.7 150 BC 13.450 0.00 0.0 Special Slope Protection 58390 0.0 0.0 Major Structures Design / Drawing Status Foundation Sub-structure Super-structure Minor Bridge (0 nos.) - - - - Major Bridge (0 nos.) - - - - Viaduct ( 0 nos.) - - - - Viaduct (Length) - - - - ROB/RUB (.....nos.) - - - - Construction Targets vs Ach. For F.Y 24-25 : 9.50/5.05KM

45 Project Name: “Balance Work of Construction of two lane with hard shoulders of Merangkong - Tamlu -Mon Road on EPC Basis from existing road Km. 59.000 to Km 73.640 (Design chainage Km. 59.00 to Km. 72.450) Design Length-13.450 Km in the state of Nagaland under SARDP-NE PHASE A ( Pkg V)”13.450 Km. 46.29%