FAULT ANALYSIS SUMMARY - E&M ( 10 th August 2024 TO 16 th August 2024 ) Sub system No Of Faults Root Cause Status Remarks Line1 Line-2 Total Installation Issue Poor Quality Material Poor Maintenance Mishandling External Issue Others Resolved Pending Lights, Switch Socket 4 2 6 1 2 1 2 5 1 1)ICY-PF-1 7 nos and PF-2 1 nos tubelight not working, Light damaged due to rainwater isue , (PF level Work will be done at upcoming block at night) LT supply/DG 1 1 1 1   FFS&FDS 3 2 5 2 1 1 1 2 3 1)CVC EL-FPP Panel gas flooding showing low pressure TDC: 20/08 2)PIM- Yard Hydrant glass missing near EE1. 3)CVC UG- Panel flooing system is discharge. Escalator 7 4 11 11 11 Lift 3 3 6 1 1 1 3 6   Total 17 12 29 3 2 4 3 17 25 4  

E&M(O&M) NAME OF DEPARTMENT WEEK : 10.08.24 to 16.08.24 WEEK : 22.07.24 to 28.07.24 GOOD WORK DONE BAD WORK DONE 1 List out the cut outs and water entry location in lift shaft at all stations for its closing and civil rectification. BUN Station test line Butterfly valves leakage from 09.08.2024. 2 Data of faulty lights at all station is prepared for its rectification. More no. of FCU leakages has been observed in UG station. Concern issue highlighted to OEM.
Tags