Ppt on Final semester exam in Mechanical engineering
PratikMarsale
7 views
20 slides
Jun 06, 2024
Slide 1 of 20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
About This Presentation
Seminar on Building metal engineering
Size: 1.06 MB
Language: en
Added: Jun 06, 2024
Slides: 20 pages
Slide Content
A Seminar on “PRE-ENGINEERED METAL BUILDING ” By KALLUPURAKAL JOEL FRANCIS ( Roll No. 2403) Guided By Prof. Md. Javed Mechanical Engineering Department MSS’s College of Engineering & Technology, Jalna
Contents Introduction Literature review Advantages Applications Components of P.E.B P.E.B accessories P.E.B erection procedure Work done by me… Visit to Roorke manufacturing plant
Introduction PEBs are Steel Buildings that have been Fabricated & Manufactured at the factories and shipped at the construction sites, ready for Assembly. A combination of Built Up Section, Hot Rolled Section, Cold Formed Elements and Profiled Sheets. Designing and Casting is done in Factory. Building Components are brought to site. Then fixed/jointed at the site. All Connections are Bolted.
Self weight- 30% lighter. Primary Member is tapered section. Secondary members are light weight rolled framed “Z” and “C” section. Self weight- More heavy. Primary members are Hot rolled “I” section. Secondary members are “I” or “C” section which are heavy in weight.
Delivery –Average 6 to 8 weeks. Foundation-Simple Design, easy to construct & light wt. Erection cost and time- accurately known. Erection process is easy, fast, step by step. Delivery- Average 20 to 26 weeks. Foundation- Expensive, heavy foundation required. Erection cost and time- 20% more than PEB. Erection process is slow and extensive field labor is required.
Seismic Resistance- low weight flexible frames offer higher resistance to seismic forces. Overall price- 30%lower. Architecture- Achieved at low cost. Seismic Resistance- rigid heavy weight structures do not perform well in seismic zones. Overall price - Higher Price per square meter. Architecture- Achieved at higher cost.
Advantages Aesthetic Appeal Faster Completion Economical Seismic Resistance Ease of Expansion Maintenance Free Large Clear Spans Controlled Quality Hassle Free
Applications Industrial Buildings Warehouses Commercial Complexes Institutional Buildings Showrooms Offices Schools Indoor Stadiums AirCraft Hanger Outdoor Stadiums with canopies Gas Stations Metro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan Wadi’s And many more… Industrial Building
Metro Station Indoor Stadiums Parking lots Railway Station
Main Frame Primary Members Columns Rafters Secondary Members Purlins Girts Components of P.E.B Sheeting Roof Wall Fascias etc Accessories Ventilators Sky Lights Misc.
P.E.B accessories Louvers Windows Personal Doors Sky Lights and Wall Lights Ridge Ventilators Turbine Ventilator False Ceiling Partition Walls Flashings Gutter & Downpipes
Louvers Windows Personal Doors Sky Lights and Wall Lights Ridge Ventilators Turbine Ventilator
Preparation for Erection Pre Erection checks Receiving Materials at site Unloading Containers Erection of the Framing Preparation of the First Bay Main frames Mezzanine floors Crane Beams P.E.B Erection Procedure