RMC Plant and its components, Testing and Design Mix

11,240 views 23 slides Mar 21, 2016
Slide 1
Slide 1 of 23
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23

About This Presentation

Summer Internship in Ultratech Concrete


Slide Content

SUMMER TRAINING AT U ltratech RMC SUBMITTED BY: Abhimanyu Saraswat

Truck washing entry Weighing area quality store ticket Yamuna sand/red sand 20 mm 10 mm hopper mixer T.M repair silo silo silo pump truck Layout of the plant

MAIN THINGS DONE IN SUMMARY TRAINING TESTING 1) SLUMP TEST 2) SLIT TEST 3) BULK DENSITY WORKING OF A RMC PLANT DESIGN MIX OF CONCRETE

EQUPIMENTS OF MOST IMPORTANT TESTS

TOTAL TEST DONE Sieve analysis Air entrainment meter Consistency (normal, initial and final)- not done Fly ash content Specfic gravity of fine & coarse aggregates Aggregate impact test Speedy moisture test Flakiness and elongation

Working procedure

FLOW CHART IN RMC

PROCESS IN PICTURES

STORAGE OF 10 MM AND 20 MM

PUTTING AGGREGATES/SAND IN HOPPER

BY CONVEYOUR BELT TO SKIP

SKIP TO MIXER

MIXER

CONTROL PANEL

READY TO MOVE

Pouring of concrte in pump at site

Design mix by IS 10262 and 456 Step 1: f m=f ck+ 1.65σ. Step 2 : selection of w/c from curves . Step 3: Estimate water content & sand contents for concrete grades up to M35 up M35/ above M35 w/c curve Steps of design

Step 3 adjustment in water and sand content Condition Adjustment Sand zone 1,3 and 4 (for 2 no change) No change in water content but sand -1.5% for zone 3, 1.5 % for zone 1 -3% for zone 4 Increase / decrease of Compaction factor by 0.1 Water content increased by +_ 3% No change in sand w/c ratio increased or decreased by 0.05 No change in water content but +_ 1% in sand content For round aggregates -15kg/m3 for water and -7% for sand

Contd …. Step 4: Calculate cement content, Aggregate contents,

LAB CONCRETE MIXER

PROBLEMS EXPERIENCED   Some sites are just too far away.   Generation of road traffic.   Concrete's limited time span between mixing and going-off means that ready-mix should be placed within 10 minutes of batching at the plant.    Slump loss is also a major issue in RMC which result in a loss to company as the buyer tends to reject the product.