6 Procelainfuseunits15A,500Vgrade 3No
7 50mmdia.3mmthickGIbends 3No
8 500mmx500mmx65mmVTWB 1No
9 Earthingset 1No
10 ClampsforfixingGIpipewithpoleandmeterside 5No
3)CostofEstimation
Sl.No Praticulars UnitQuantityRate
RsPs
Cost
RsPs
116sq.mmPVCUGcableAluminium4coreGI
steeltapearmoured.500Vgrade.
M 18 80.00/m1440.00
2Bricks11.5cmx23cmx7.5cm No 45 5.00 225.00
350mmdiameter,3mmthickGIpipeforlaying
cableandearthing
m 7.5 200.00/m1500.00
4Ironpot50A,500Vgradewith4terminal No 1 225.00225.00
5PVCcable,16sq.mmdoublesheathed m 12 7.65/m 91.80
6Procelainfuseunits15A,500Vgrade No 3 40.00 120.00
750mmdia.3mmthickGIbends No 3 30.00 90.00
8500mmx500mmx65mmVTWB No 1 80.00 80.00
9Earthingset No 1 1200.001200.00
10ClampsforfixingGIpipewithpoleandmeter
side
No 5 18.00 90.00
11Miscellaneousmaterialslikescrews,gutties,
rawlpugsandbituminouscompound.
LS 100.00
Total 5161.80
[email protected]/m 18.00x30 540.00
Total 5701.80
13Add5%forcontingency,unforeseenand
variationonmaterialcostofRs.5701.80
285.09
GrandTotal
Say
5986.89
6000.00
(Estimatedrupeessixthousandonly)
TASK
1.PreparethescheduleofmaterialsforprovidingOHservice
connectiontoaresidentialbuildingwith1050Wlightingand
2.5KWheatingload.Thesupplierpoleis10m
away.Preparetheestimateofcost.
2.PreparethescheduleofmaterialsforprovidingUGservice
connectiontoaresidentialbuildingwith1KWlightingand
2.5KWheatingload.Thesupplierpoleis10m