Site Setting Out presentation slide .PPTX

madedayo102 84 views 61 slides Jul 27, 2024
Slide 1
Slide 1 of 61
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61

About This Presentation

This document deals with setting out o f working drawing directly on the ground. It involves interpretation of the measurements, shapes and sizes of a structure on the ground.


Slide Content

Setting out of Engineering works Faculty of Civil Engineering FUT Minna CIE321

YOUR SITE 28th June 2024 Site Setting-out ‹#›

Or This 28th June 2024 Site Setting-out ‹#›

28th June 2024 Site Setting-out ‹#›

What Will We learn? Understand the aims of setting out for buildings; Know the different types of plans that may be used in the setting out process; Learn the good working practices that have been established; Understand the procedures required to ensure that the horizontal and vertical control requirements of setting out operations can be met; Apply horizontal and vertical control techniques to second-stage setting out operations; Appreciate the application of laser instruments in surveying and setting out. 28th June 2024 Site Setting-out ‹#› 

Construction Site The site should be cleared, leveled and the building platform level should be recorded in a “Plan / Drawing” and should get the approval of the Resident Engineer before any site setting is done. The co-ordinates of the nearest bench mark should be available or obtained from the District Surveying Department. Datum point is to be established to ensure existing and proposed construction works can be linked by survey equipment. In rural areas the center- line of the nearest roads (on two sides) could be used as points to set the position of a Base Line or the outer footprint of the building. However, the Architect or the Designer would determine these points in consultation with Client and Land Surveyor. 28th June 2024 Site Setting-out ‹#›

Setting Out Definition [ISO] Setting out is the establishment of the marks and lines to define the position and level of the elements for the construction work so that works may proceed with reference to them. 28th June 2024 Site Setting-out ‹#›

Setting Out Simple Building Layout 1 OBJECTIVES To layout the proposed structure according to prepared plans; To mark the controlling points of the structure in the manner that is most useful to the construction team. This marking is to establish horizontal and vertical control. The marking comprises of indicating the corners of the building and other horizontal and vertical positions by means of stakes, batter boards or profile boards (or berms) with string lines, cut-and-fill notations, and other conventional methods. . 28th June 2024 Site Setting-out ‹#›

Setting Out Simple Building Layout 2 Thus, Setting Out is positioning the base of the intended construction facility on ground, in relation to the other facilities in the construction area. Setting out should be done with surveying equipment which fall within valid calibration period. Setting out is an ongoing process; Cross-checks to already constructed work should be carried out regularly. 28th June 2024 Site Setting-out ‹#›

Equipment for Setting-out Operation For construction Setting-out works the following equipment are likely to be used: Tapes [Class I or Class II] Compass Pegs String lines Line marking equipment Lump or marsh hammer Ranging poles or ranging rods Plumb bobs Leveling equipment Dumpy levels, staves and tri-pods Theodolite Total Station [Electronic Distance Measurement (EDM)] Spirit levels, Water levels, PPE –Personal Protective Equipment (e.g. Coloured vest, safety boots, sun hat, sun screen lotion etc.) 28th June 2024 Site Setting-out ‹#›

Range Poles & Tapes used for Land Surveying 28th June 2024 Site Setting-out ‹#›

Spirit Levels 28th June 2024 Site Setting-out ‹#›

Autofocus Level 28th June 2024 Site Setting-out ‹#›

THEODOLITE 28th June 2024 Site Setting-out ‹#›

Total Station 28th June 2024 Site Setting-out ‹#›

Some Terminology Building Line A line determined by the Local Authority in front of your site and facing the main road. All new development in the site should be beyond this line. This line determines the extent of land in which the public road and drains are planned by the Local Authority . Base- Line A temporary line where the coordinates of endpoints are established. Other settings can be referred to this line. Temporary Bench-mark or Datum Line . This is a fixed point on site to which all levels are related. This TBM should be established at early stages of the construction. Where possible the TBM should relate to an ordnance bench mark . 28th June 2024 Site Setting-out ‹#›

Modern Surveying Equipment 1/27/16 Site Setting-out 17

1/27/16 Site Setting-out 18 Establishing Datum

Datum Could be our own Datum - Assumed Datum - Arbitrary Datum - Site Datum Or A National Datum In the Malaysia they have a national organisation known as Jabatan Ukur dan Pemetaan Malaysia (JUPEM) - Ordnance Datum A D O D Based on the Ordnance Datum - points of known height above or below Zero height have been established around the Malaysia These points around the country are known as Bench Marks Above Assumed Datum A A D Above Ordnance Datum A O D

O.S. Bench Marks (OBM) Arrow or Crowsfoot mark Reduced Level Section through wall Rivet Bottom of Level Staff OBM TBM T ransferred or T emporary BM