Site visit report of Raikela & Tantra Iron Ore Mine 8/6/2022
Mine view 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 2
We have visited Raikela & Tantra Iron Ore M ine on August 2 nd and 3 rd , and as part of visit we have discussed the following points with M. JP Raut(Geologist). The bench height is kept around 6 m and bench width at 8m. Ultimate pit angle of pit is 35 °. Iron ore is not found after the appearance of white shell. Last year production was 1.079 MT. At present total number of labours working in mine is 149. At the northern side, Clustered Mining is going in association with Jindal in which both mines takes equal quantity of ore. Production and dispatch in month of June 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 3 Production 53147.00 T Dispatch 47897.77 T Cumulative 3,10,000 T
Day wise production There are three type of face DC, JRP, DND. Face wise Labour strength Production target in month of Aug There are three type of screen plant SKP, BML and new plant. 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 4 Labour 640 T Screen 6000 T Breaker 560 T Total 7200 T DC 65 JRP 35 DND 44 Labour 16,000 T Screen plant 1,50,000 T Breaker 14,000 T Total 1,80,000
Production target of month July from different screening plant Face wise production target for manual sorting/plot raising in July Total 6 Dumpers of 20T capacity and 17 Dumpers of 35T capacity are currently being used in mine. Total number of shovels used in mine are 15. Only 1 Dozer is currently in use. Based on capacity there are three types of shovels-1.3 cu/m, 1.7 cu/tm and 2.3 cu/m. 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 5 New plant 70,000 T Labour 16,000 T Breaker 14,000 T DC 7000 t/month JRP 5000 t/month DND 4000 t/month
Proposed Dumping 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 6 Waste will be dumped at the south western side and Sub-grade will be dumped in the Middle Area over Ultimate Pit Proposed Dump Area Sub-Grade Dump area and Existing Sud-grade dump area
Screening and crushing operations are done in this plant, It is electrically operated machine. Firstly, shovel dump ore in upper part of plant. Less than 40mm size particle go in screening and More than 40mm size go in crusher. There is one worker needed in downside who can manually separate ore greater than 150 mm size. Less than 40 mm size particle again separated by screening. Less than 10mm or fine ore will go out and greater than 40mm will go into crusher and then come out in form of fine ore. 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 7 Top View of Ore Handling Plant Process of Screening and Crushing of iron ore Screening and Crushing
8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 8 Blue dust Iron ore Jindal Mine view
8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 9 Laterite associated with Blue Dust Stock Yard that is showing ready to load Dumper loading a truck
Currently, 2 drilling machines are available for drilling operations. In 1-hour, total diesel consumption by drilling machine is 25L. Those machine will drill 6.6 m hole at a time, and the additional 0.6 m drilling is called subgrade drilling. In order of safety 2 m distance is kept between two near hole. Those drilling machines drill uptorn 15m -18m times per hour. The angle of hole depend on face of band and also on the crest of the bench. Generally, in Raikela Mines they are considering 85 degrees angle to the crest of the bench. In Blasting process, Nonel explosive are used. Approximately, 15kg explosive loaded in one hole. Drilling Operations at Mine 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 10 Drilling Machine
Rock Breaker 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 11 At here it is used for removing oversize fines that are too large or too hard to be reduced in size by a crusher Its operating pressure is around 13-18 Mpa . The chisel diameter is 146 mm. It is preferred here because of its high impact and low operating cost.
Slope Stabilization 8/6/2022 Change text via --> Insert --> Header and Footer --> confirm for all Slide 12 In Raikela & Tantra Iron Ore Mine the slope stabilization is done through Vegetation method, where the slope is covered by a green mat and under the green mat, they are planting the seeds such that the plants will grow again on the slope and stabilizes it. Manual Sorting In this mine, the screening of fines above 40mm was done by labour manually Around 16,000 Tonnes were sorted manually by labour on average per month, and around 640 Tonnes per day .