Small Hydro power plant. Small Hydro Power (SHP) is hydro plant with power under 10 MW as defined by United Nations Industrial Development Organization (UNIDO):
Choice of technology and site
Small hydro technology is mature and well-established in the market
Improvements: equipment designs, differen...


Slide Content

SMALL HYDRO POWER
Submitted by:
VIKAS PANCHAL
Mtech(Renewable Energy)

Small Hydro Power (SHP)
Small Hydro Power (SHP) is hydro plant with
power under 10 MW as defined by United
Nations Industrial Development Organization
(UNIDO):
P= Power plant
Pico 5 kW & below
Micro 100 kW & below
Mini 2000 kW & below
Small 25000 kW & below
Medium 100,000 kW & below
Large above 100,000 kW

Choice of technology and site
•Small hydro technology is mature and well-
established in the market
•Improvements: equipment designs,
differents materials, control sistem
•Q=Flow of water through the pipe (m³/sec)
•H=Head (m)
•The Power (kW) avaiable from the flow:
P = Q H g η
g = 9,8 m/s²η=80% global efficency plant

Hydro project schematic

Types of Hydroelectric Installation

Typologies of Hydropower
plants
a)Run of River Plants
b)Pondage Plants
c)Reservoir Plants

Typologies of Hydropower plants
a) Run of River Plants
•A Run of River plant uses the
available river flow
•A Run of River plant has a little
cumulative water
•High cost

Typologies of Hydropower plants
b) Pondage Plants
•Cumulative water flows permits
storage of water for few weeks
•Pondage Plant canworks when the
level of river is low

Typology of hydropower plants
c) Reservoir Plants
•Energy prodution of a Reservoir
Plant is based on cumulative water
flows
•Construction of a very large dam to
cumulate water
Usually this kind of plant is not a SHP

Plan SHP
•Control national and regional law
•Who using the water and how
•Story analisis of river flow
•Study hidrogeologic and hidrografic of site
•Chek principal parameters (Q) river flow avieble and
(H) head for calculate power of site
•Pubblicity of project and consalting citizen.

SHP SITES IN INDIA

Index map showing SHPs

Major attributes of hydropower
Positive Negative
No emissions Social impacts (land
inundation, change land use)
Mature tecnology High initial capital costs:
3-4,5 kEuro/kw
Renevable resource with higt
efficienty (> 80%)
Impacts on river flows and
aquatic ecology
Long life (40-50 years)
Low maintenance costs
Variable output-dependent on
rainfall and snowfall
Skilled work High costs of dismission
Change using area Bureaucracy

Hydroelectric plants
•Start easily and quickly and
change power output rapidly
•Complement large thermal plants
(coal and nuclear), which are
most efficient in serving base
power loads.
•Save millions of barrels of oil

SHP emissions
•As all other renewable energy sources, SHP plays
an important role in reducing the emissions.
•Externality of SHP are very low.
•This is very important and positive, expecially for
Kyoto protocol.

What to do for goal with SHP
Act cordinated strategy:
•Informing
•Including the people in the projects
•Dialogue with opponents
•Implementing social compain

PERFORMANCE INDICATORS
•Installed capacity
•Average Head
•Average Discharge
•Cost of Energy Generation
•Cost of Project
•O& M Cost
•Labor Cost
•Average Power Output
•Capacity Utilization Factor
•Internal Rate of Return (IRR)
•AHP method

REFERENCES
1.Ministry of New and Renewable Energy, Small Hydro Power
ProgrammeIndia. http://www.mnre.gov.in/schemes/grid-
connected/small-hydro/
2.JyothiPrasad and H J Shiva Prasad, (2007) “Performance
Evaluation of Existing Mini Hydro Power projects of Uttarakand–A
Case Study”, International Conference on Small Hydro power,
Hydro Sri Lanka, pp1-6.
3.H. K. Vermaand ArunKumar, (2007) “Performance Testing and
Evaluation of Small Hydro Power Plants. International Conference
on Small Hydro power, Hydro Sri Lanka”,, pp1-9.
4.S. Kucukali, (2011) “Risk Assessment of river type Hydro Power
Plants by using fuzzy logic approach”, World Renewable Energy
Congress, Sweden, pp1432 –1439.
5.PriyabrataAdhikary, PankajKr Roy and AsisMazumdar, (2012)
“Selection of penstock material for small hydro power project-A
fuzzy Logic Approach”, International journal of advanced scientific
and technical research, Vol.6, No.2, pp521-528.