AishwaryaLakshmi61
425 views
10 slides
Nov 03, 2022
Slide 1 of 10
1
2
3
4
5
6
7
8
9
10
About This Presentation
SE
Size: 792.07 KB
Language: en
Added: Nov 03, 2022
Slides: 10 pages
Slide Content
MILESTONES,WALK THROUGHS AND INSPECTIONS PRESENTED BY: AISHWARYA LAKSHMI.S
MILESTONES ,WALK THROUGHS AND INSPECTION One of the most important aspects of a systematic approach to software development is the resulting visibility of the evolving product.
MILESTONE, WALKTHROUGHS AND INSPECTION Development of these intermediate work proucts the opportunity to establish milestone and to conduct inspection and reviews. These activities in turn expose errors,provide increased project communication, keep the project on schedule and permit verfication that the design satisfies the requirements.
MILESTONES, WALKTHROUGHS AND INSPECTIONS The two major milestones during desing are the Preliminary Design Review(PDR) and the Critical Design Review(CDR) The PDR is typically held near the end of architectral design and prior to detailed design . The CDR occurs at the end of detailed and prior to implementation.
MILESTONES,WALK THROUGHS AND INSPECTION Depending on the size and complextiy of the product being developed,the PDR and CDR may be large formal affairs inovlving several people are they may consists of on two types of meeting.They are: *Formal meeting *Informal meeting.
MILESTONES,WALK THROUGHS AND INSPECTIONS They may consist of an informal meeting between a programmer and there project leaders. In any case,formal sign-off should occur to indicate that the milestone has been achieved.
MILESTONES,WALK THROUGHS AND INSPECTIONS The major goal of the PDR is to demonstrate that the externally observabe characteristics and architectural structure of the product will satisfy the customer’s requirements.
MILESTONES,WALK THROUGHS AND INSPECTIONS The PDR may expose enough serious problems that a subsequent PDR scheduled or the PDR may expose only minor errors that can be corrected and reviewed at CDR. The CDR is heled at the end of detailed design and before to implementation.
MILESTONES,WALK THROUGHS AND INSPECTIONS CDR provides a final management decision point to build or canael the system,The CDT is in essence a repeat of the PDR, but with the benefit of additional design effort.