TIMOR-LESTE Bridge.pptx for 2 nd Project

AKASHMISHRA284701 18 views 38 slides Jun 18, 2024
Slide 1
Slide 1 of 38
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38

About This Presentation

Haier has its manufacturing facility at Ranjangaon in Pune district of Maharashtra, which has capability to manufacture Refrigerators, CTVs and Washing Machines. Haier is upgrading the new facility with state-of-the-art equipment’ to create a Research & Development facility for refrigerators.
...


Slide Content

REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministry of Public Works of Timor-Leste  CONSULTING SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN (DED) FOR NEW BRIDGES AND RIVER TRAINING PACKAGE I: NEW BRIDGE IN MOTA-AIN BATUGEDE BORDER, BALIBO-BOBONARO, NUNURA-II LEOLIMA, MALIANA AT ABAE, BOBONARO. & PACKAGE II: RIVER TRAINING (DESIGN OF PROTECTION STRUCTURE) FOR EXISTING BRIDGES LOES-LIQUICA, NUNURA-I AND COMORO, HINODE. Presented b y- Mr. T. M. Murali , Team Leader (India) Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve (Timor Leste )

Project Background The Ministry of Public Works (MPW-TL) through the Planning, Inspection, Research and Development, Ministry of Public Work, RDTL intends to use portion of the budget allocated in Infrastructure Fund for the fiscal year 2021 be applied towards civil works for the new construction about 800 meters the total length of two bridges and 3.5 km lengths of river training structure / bridge protection. Studying of the existing location / structure, hydraulics, preparing the design and construction specifications. T he required levels of service to be achieved by the designs and the rehabilitation works. Detailed engineering design and cost estimate and finally support the finalization of the required bidding document. Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Project Location Timor L este is surrounded by the sea - Banda sea Savu sea Timor sea East Timor also known as Timor-Leste officially the Democratic Republic of Timor-Leste, is a country in Southeast Asia. This Country is located near the Continent Australia in south and Indonesia in north and west. Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Project Location Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Package I New Bridge Total Length (m) Location/ Coordinates 1 Mota Ain, Batugede Border, Balibo-Bobonaro 100m+Approx . -8.958912°, 124.950664° 2 Nunura -II, Leolima-Maliana Atabae , Bobonaro . 700m+Approx. -8.961019°, 125.111417°   Total Length = 800 meters + Approx.   Package II Existing Bridge Total Length of structure protection (m) Location/ Coordinates 1 Loes , Liquisa 1000 - 8.742012°, 125.133434° 2 Nunura -I 2000 -8.961019°, 125.111417° 3 Comoro, Hinode 500 -8.561491°, 125.533673°   Total Length = 3500 meters  

Project Location PACKAGE I: NEW BRIDGE IN MOTA-AIN BATUGEDE BORDER, BALIBO-BOBONARO Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Project Site Photographs Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Existing Conditions Water is flooding the existing road during heavy rain and floods. The flow is not passing through the existing river course and taking a straight path,thereby resulting in the flooding of the existing road.

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Type of Proposal We are going to channelize the river along with straight stretch and a bridge will be provided for the passage of water.

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Project Location PACKAGE I: NEW BRIDGE IN NUNURA-II: LEOLIMA, MALIANA ATABAE, BOBONARO Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Project Site Photographs Chainage- 01+500 km Chainage- 05+500 km Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Existing Conditions The start and end point are at the greenfield location.There is no well defined bank.

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Type of Proposal New Bridge has to be constructed of length = 700 metres .

Project Location PACKAGE II: RIVER TRAINING (DESIGN OF PROTECTION STRUCTURE) FOR EXISTING BRIDGES LOES-LIQUICA Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Towards Sea

Project Site Photographs Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Existing Conditions Foundation failure due to scouring. Foundation kept above the scour level almost at the bed level. Stone masonry can only been seen as foundation.

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Type of Proposal The scour level shall be assessed based on hydrological and hydraulic studies. Preliminary morphological study shold be done for finding the past river course . The foundation shall be placed 2 m below the scour level to avoid scouring. Suitable protection for the foundation should be provided at the bed level.

Project Location PACKAGE II: RIVER TRAINING (DESIGN OF PROTECTION STRUCTURE) FOR EXISTING BRIDGES Nunura -I Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Towards Sea

Project Site Photographs Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Existing Conditions The Gabion and retaining walls have failed due to scouring. The river is changing course after hitting against the river bank because there is a confluence of rivers. Considerable erosion of embankment can also be seen.

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Type of Proposal The scour level shall be assessed based on hydrological and hydraulic studies. Preliminary morphological study should be done for finding the past river course . The foundation shall be placed 2 m below the scour level to avoid scouring. The effect of impact on the walls shall also be assessed and suitable measures should be adapted to dissipate the energy due to impact.

Project Location PACKAGE II: RIVER TRAINING (DESIGN OF PROTECTION STRUCTURE) FOR EXISTING BRIDGES Comoro, Hinode Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Towards Sea

Project Site Photographs Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Existing Conditions The buidings constructed have encroached into the river. Hereby obstructing the flow. The existing retaining walls along the highway has also failed at some of the locations.

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Type of Proposal The scour level shall be assessed based on hydrological and hydraulic studies Preliminary morphological study shold be done for finding the past river course. The removal and rehabilitation of the encroachment of the river. Suitable protection for the foundation should be provided at the bed level.

Salient Feature Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Pkg I New Bridge Total Length (m) Proposed Bridge Type Details of structure Location/ Coordinates 1 Mota Ain, Batugede Border, Balibo-Bobonaro 100m+Approx. Pre-stressed Concrete Girders Existing Superstructure- RCC Existing Substructure-Stone masonry River width- 50 m -8.958912°, 124.950664° 2 Nunura -II, Leolima-Maliana Atabae , Bobonaro . 700m+Approx. Pre-stressed Concrete Girders River width- 850 m Bridge site – 80m above MSL -8.961019°, 125.111417°   Total Length = 800 meters + Approach     Pkg II Existing Bridge Total Length of structure protection (m) Proposed structure Type of River Training Location/ Coordinates 1 Loes, Liquisa 1000 Retaining Walls by Design River width- 450 m Bridge site – 15m above MSL Existing Structure- Steel truss type - 8.742012°, 125.133434° 2 Nunura -I 2000 Retaining Walls by Design River width- 430 m Bridge site – 105m above MSL Existing Structure- Steel truss type -8.961019°, 125.111417° 3 Comoro, Hinode 500 Retaining Walls by Design Bridge Length- 250 m Existing Structure- Box Girder -8.561491°, 125.533673°   Total Length = 3500 meters    

Improvement Proposal Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) River Training Work

Methodology SURVEY Preliminary Study; Topographic Survey; Soil Testing; Hydrological Survey; Environmental and Social Impact Assessment; Social Safeguard Requirement Survey. ANALYSIS & DESIGN ENVIRONMENTAL - Design Analysis Structure Design; River Protection design Drainage design; EMP SEIS Social Safeguard Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Key Personal Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste ) Sr. No. Key personal Position 1 Mr. T. M. Murali Team Leader/Senior Bridge Design Engineer 2 Mr. R. Parsuraman Senior Structural Engineer 3 Dr. Mahaveer Saini Environmental Specialist 4 Mr. Ranajit Kumar Jana Traffic/Safety Engineer 5 Mr. Sandy Hidajanto Quantity Engineer 6 Mr. Najim Ali Geotechnical/Material Engineer 7 Mr. Tapas Das Hydrologist 8 Mr. Meer Geodetic Engineer 9 Mr. M. Anand Contract Specialist

Work Schedule Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Design Standard Timor-Leste Standard Method of Measurement (TL-SMM) . Timor-Leste Bridge Design Standard & Manual/SKM . AASHTO LRFD Bridge Design Specification Timor-Leste’s Standard Unit Price (TL-SUP) . Bureau of Indian Standards(BIS) Indian Road Congress(IRC) Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )

Theme Engineering Services Pvt. Ltd. in JV with Infraplus Consulting Pvt. Ltd. & Desemvolve ( Detile, Timor Leste )