Training Busduct LS For Indsutrial and Project

PascaRychoYogananta 0 views 23 slides Oct 24, 2025
Slide 1
Slide 1 of 23
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23

About This Presentation

Training Busduct LS For Indsutrial and Project


Slide Content

1
E-Series
Cable
LSC’s Global Standard Busway SystemLSC’s Global Standard Busway System
E-SeriesE-Series
BUS DUCT TECHNICAL SUPPORT TEAM
ISO, ASTA, KEMA, CE, GOST, UL
Cable

2
E-Series
Cable
LSC BUSDUCT Introducing
Physical
Data
Flanged End

3
E-Series
Cable
Horizontal Elbow Vertical Elbow Horizontal Offset Vertical Offset
Combination Elbow Tee Reducer Expansion (if needed)
LSC BUSDUCT Introducing

4
E-Series
Cable
Application
Elbow
Feeder
Flanged End
Instalation in Factory

5
E-Series
Cable
Distribution System
Cable Busduct
M
C
C
B
ACB &
MCCB
M
C
C
B
Distribution
(Sub.MCCB)
ACB
Distribution
(PH Box)

6
E-Series
Cable
LSC’s Global Standard
STANDARS
IEC 60439-1&2 Bus ways
BSEN 60439 : Bus ways
KS IEC 60439-1&2 : Bus ways
ASTA, KEMA, CE, TUV(Green), IEEE(Seismic Zone 4),
IECEx(Safety) , UL 857 Certified
SERVICE CONDITIONS
Ambient temperature : -30 ~ +55
℃ ℃
Relative Humidity : 95% or below
AMPERE 630A ~ 6000A (7500A for CU)
BUS BAR CU/AL with Tin-Plated at Joint Part
INSULATION
Class B (130 ) / Fluidized Bed Epoxy

Mica Film for FR (1200 )

HOUSING Two Pieces Extruded Aluminum Housing
IP DEGREE IP54 Standard and up to IP66
EARGHING Integral Housing(100%), Internal Half Earth / Full Earth

7
E-Series
Cable
Details of Feeder
Conductor
(Cu / Al)
Insulator (Class B)
- F-Bed Epoxy : Ex-Way
- Mica : Ef-Way(1200℃)
Two Pieces Extruded
Aluminium Housing
Upper
Lower

8
E-Series
Cable
Conductors
CU AL
CONDUCTIVITY 99% 61%
PROCESS ELECTRICAL ELECTRICAL
PLATING TIN TIN
BUSBAR
CONTACTING
POINT

9
E-Series
Cable
Jointing Kits and Joint Cover
GASKETED
JOINT COVER
Buffer

Elongation Absorption
By 2.5mm
Double-Headed
Bolt
ELONGATION
ABSORPTION
TWO
PIECES

10
E-Series
Cable
Plug in Holes
Standard 3 meters
5 Holes x 2 Sides
Plug in Hole
upto 800A
Tap off
upto 1200A
EASY MOUNTING
BY GUIDE PIN HOLE
Interlock
device

11
E-Series
Cable
Plug in Boxes
External handle Push button External lever
Bolt fastening Button Outlet
VARIOUS INTERLOCK PH BOX

12
E-Series
Cable
Test Conductor Features
Insulation
resistance test
- Over 500MΩ
- Measure by D.C. 500V
insulation tester
between each
conductors and ducts
- Sampling test
Dielectric test- A.C. 4000V / 1 Min
- Measure with
frequency 60/50 Hz AC
between each
conductors and ducts
- Total inspection
Inspection Process
IN HOUSE QUALITY ASSURANCE

13
E-Series
Cable
Easy Installation
e
NO REQUIRED SPECIAL TOOLS

14
E-Series
Cable
How to make Bill of Material
First, we must have shop drawing from contractor.
Example:

15
E-Series
Cable
How to make Bill of Material
From that picture, we can calculate assumption length
of busduct.
Busduct from trafo1 to LVDP1:
200+200+1300+2826+3097+1300+200+130=9253
Busduct from trafo2 to LVDP2:
200+200+1300+4360+6901+1300+200+130=14591
Note: all measurement in millimeters, b is based of busduct capacity.
630A-2000A: 100, 2500A-6000A: 130 (AL-AL)
630A-2500A: 100, 3200A-7500A: 130 (CU-AL)
200+130

16
E-Series
Cable
How to make Bill of Material
This is height of busduct from panel and trafo. If we don’t know about actual height in
site, we can assume it with 1300 or 1500.

17
E-Series
Cable
How to make Bill of Material
2826+3097=5923
4360+6091=10451
This is feeder length of busduct from panel and trafo. We can calculate it based of
measurement which appear in shop drawing.

18
E-Series
Cable
How to make Bill of Material
After all data has calculated, we can make list of feeder in the table like below.
No
Busduct
From
Busduct to
Busduct
Capacity
 
TOTAL
1 Trafo 1 Panel LVDP 14000A200200130028263097130013020092539.253
2 Trafo 2 Panel LVDP 22500A20020013004360609113001002001375113.751
TOTAL        2300423.004
From shop drawing and list of feeder, we will know about part of busduct which use in
this project.

19
E-Series
Cable
PROJECT : LSC Busduct for Emblem
Commodity & Specification   
1 Busduct 4000A 3P5W CU-AL IP 54
Trafo 1-Panel LVDP 1 TOTAL QTY
UNIT (USD) TOTAL (USD)
     
1Feeder 9.25 9.25 METER
 
 
2Horizontal Elbow   2.00 2.00 EA   
3Vertical Elbow   1.00 1.00 EA   
4Flange End   2.00 2.00 EA   
5Hanger Bar   6.00 6.00 EA   
6Flexible Bar  1.00 1.00 SET   
7Connection Bar  1.00 1.00 SET   
8Wall Flange  1.00 1.00 EA   
How to make Bill of Material

20
E-Series
Cable
2
Busduct 2500A 3P5W CU-CU IP
54
Trafo 2-Panel LVDP2 TOTAL QTY
UNIT
(USD)
TOTAL
(USD)
     
1Feeder 13.75 13.75 METER   
2Horizontal Elbow   2.00 2.00 EA   
3Vertical Elbow   1.00 1.00 EA   
4Flange End   1.00 1.00 EA   
5Hanger Bar   10.00 10.00 EA   
6Flexible Bar  1.00 1.00 SET   
7Connection Bar  1.00 1.00 SET   
8Wall Flange  1.00 1.00 EA   
How to make Bill of Material
To find out amount of hanger bar, we can divide feeder length/1300 or 1200.
1300 or 1200 is distance between hanger to other hanger.
Flexible bar and connection bar is used to connect from trafo bushing to flange end.
Wall flange is used to covering damage wall which crossed of feeder from some room
to other side room.

21
E-Series
Cable
Processing of Busduct Production
Drawing from Contractor
Technical Support
Returning to Contractor
LS Cable Korea
Producing Busduct

22
E-Series
Cable
Processing of Busduct Production
Drawing from Contractor
Contractor, as builder of project should have give shop drawing for technician. And then, it will be editing
and arranging to find out part list or component which use to this project.
Technician
Shop drawing from contractor is learning by technician. If any question, technician will held meeting to solve
the problem. To find out real measurement, technician will survey location and make some note to compare
between shop drawing and real condition in site.
Returning to Contractor
After results and editing shop drawing, it will be returning to contractor. They will check, correction, and make
final results before shop drawing send to LS Cable Korea.
LS Cable Korea
Final drawing which edited by technician and approved by contractor will be sending to Korea. Korea will check and
edit drawing also. They will give some advice or some solution for this project. After that, Korea will send final shop
drawing for approval. If there’s no problem and contractor also agree

23
E-Series
Cable
ISO, CE , ASTA, CCC, KERI, FILK, KTL