Value Addition Proposal Shifting Project: 300kVA LT Panel, 100kVA UPS, 200kVA DG

Technical / Engineering • Load study & optimization • System health check before shifting (IR, contact resistance, thermography) • Upgrade protection & monitoring (relays, meters, SCADA) • Improve earthing & surge protection

Safety & Reliability • Business continuity plan with minimum downtime • Fire & arc flash safety measures • Seismic & vibration protection for equipment

Energy Efficiency / Sustainability • Energy saving recommendations (PF correction, efficient lighting) • Battery bank health audit & monitoring

Documentation & Training • As-built documentation (SLDs, cable schedules, load charts) • O&M training for facility engineers