Wastewater Treatment
WW1
By
Dr. Amr Abdel Kader
Specialized Scientific Programs
Civil & Environmental Engineering
Dr Amr Abdelkader San 419 1
BASICS
•WHAT IS WASTEWATER?
•WHY IT IS ENVIRONM. UNFRIENDLY?
•WASTEWATER COMPOSITION?
•WHAT ARE WASTEWATER SOURCES?
•WHY WE NEED TO TREAT IT?
•WASTWATER CHARACHTERISTICS?
•WHAT ARE THE TWO BASIC EQUATIONS OF
WASTEWATER TREATMENTS?
WASTEWATER TREATMENT
ENVIRONMENT
•TEMP., PH, NO TOXIC…
•WHAT BACTERIA CAN EAT.
•IS FOOD CONCENTRATION MATTERS!!!!! ….FOOD TO
MICROORGANISMS RATIO.
•IS TIME IMPORTATNT? WHAT TIME? HRT OR SLUDGE
AGE..?
•NUTRIENTS MATTERS? ORGANIC:N:P = 100 : 5 : 1
•AERATE AND MIX WITH NO SETTLING,….. SETTLE
WITH NO AERATE AND MIX!!!! DON’T MIX
PROCESSES!!!
Dr Amr Abdelkader San 419 6
WASTEWATER TREATMENT
ENVIRONMENT
•SOLIDS SEPARATE FIRST BY EASY MEANS..
•GIVE AEROBIC BACTERIA AIR AND
PREVENT AIR FROM ANAEROBIC BACTERIA
•HOW U GIVE AIR TO AEROBIC ANAEROBES
(CASCADES, MECHANICAL (SA,
DIFFUSERS), NATURALLY).
Dr Amr Abdelkader San 419 7
WASTEWATER TREATMENTS
•PRE-TREATMENT (SCREEN, GRIT REMOVAL)
•PRIMARY TREATMENT (PLAIN SETTLING OR
DISSOLVED AIR FLOTATION)
•SECONDARY TREATMENT
•TERTIARY TREATMENT
Dr Amr Abdelkader San 419 8
WASTEWATER TREATMENTS
•PRETREATMENT
•SCREEN; MECHANICAL AND MANUAL
•GRIT REMOVAL
•OIL AND GREASE
•PRE-AERATION
•EQUALIZATION
•HEAVY METALS SEPARATION
Dr Amr Abdelkader San 419 9
WASTEWATER TREATMENTS
PRIMARY
•PHYSICAL; FLOTATION, SEDIMENTATION
•CHEMICAL; NEUTRALIZATION, COAGULATION
Dr Amr Abdelkader San 419 10
WASTEWATER TREATMENTS
•SECONDARY
•DISSOLVED ORGANIC REMOVAL
•SUSPENDED GROWTH
•ACTIVATED SLUDGE, OXIDATION DITCH,
AERATED LAGOON, PONDS, UASB,
ANAEROBIC POND
•ATTACHED GROWTH
•TRICKLING FILTER, RBC, FLUDIZED BED,
UAFFRAERATED LAGOON
•SUSPENDED SOLIDS REMOVAL
•SETTLING; PLAIN OR CHEMICALLY
Dr Amr Abdelkader San 419 11
WASTEWATER TREATMENTS
•TERTIARY
•FILTRATION
•COAGULATION AND SEDIMENTATION
•CARBON ADSORPTION
•MEMBRANE
•MICROSTRAINER
•POLISHING PONDS
•WEEDS
Dr Amr Abdelkader San 419 12
WASTE WATER TREATMENT
•Primary Treatment (Physical Treatment)
Physicaltreatmentdependsonlyonthephysicalcharacteristicsofimpurities
thatpresentinwastewatertobetreated.So,itsefficiencyissmall.
•Secondary Treatment (Biological Treatment)
Secondarytreatmentdependsonthebiologicalcharacteristicsof
microorganismsthatpresentinwastewatertobetreatedsuchasbacteriathat
helpsintheremovaloforganicmatters.
•Tertiary Treatment (Polishing)
Incaseofrequiredaneffluentwithverygoodcharacteristics,tertiarytreatmenthas
beendone.Itcanremovesalts,odor,tasteandtherestoforganicmatterusingfor
example(ActivatedCarbonFilter,DynasandFilter.…etc).
Dr Amr Abdelkader San 419 13
Dr Amr Abdelkader San 419 14
Dr Amr Abdelkader San 419 15
Dr Amr Abdelkader San 419 16
PURPOSE OF
PRIMARY TREATMENT
Removal of
•Large and big floating particles.
•(40 to 60 %) of SS and (25 to 35 %) of BOD.
•Sand, gravel, silt…..etc.
•Oil and grease.
Dr Amr Abdelkader San 419 17
Purpose of
Preliminary Treatment Units
Deceleration Chamber
Decreasing velocity of flow before the screen to prevent the
escaping of particles from the screening opens.
Approach channel
Transmission of waste water from deceleration chamber to screen
at aerated condition and with suitable velocity that helps in
avoid anaerobic reaction between units.
Dr Amr Abdelkader San 419 18
Screen
head loss
By pass
d
10 cm
d'
V1
V2
L
Coarse Screen
Elevation
Plan
B
From approch channel
To GRC Dr Amr Abdelkader San 419 19
Grit Removal Chamber
Elevation
Plan
Scrapper chain
Screew pump
Motor
Proportional weir
L
B
Grit
From screen Efflent
Grit
d
Hopper Dr Amr Abdelkader San 419 20
Screen
It's used to remove big and strange impurities from waste
water, such as (paper –wood –plastics -…..), to protect the
down stream equipment against damage.
Skimming Tank
Removal of oil, grease and most of float matters.
Grit removal chamber (GRC)
Removal of particles has size more than 0.2 mm, such as (sand,
gravel, grit …..etc), to:
Protect down stream mechanical equipment.
Reduce conduit clogging.
Prevent interface with other treatment.
Improve sludge quality.
Dr Amr Abdelkader San 419 21
Screw Pump
Dr Amr Abdelkader San 419 22
Preliminary Treatment
Dr Amr Abdelkader San 419 23
DECCELERATION CHAMBER AND SCREEN
Dr Amr Abdelkader San 419 24
Force mains and deceleration chamber
Dr Amr Abdelkader San 419 25
Screens
Dr Amr Abdelkader San 419 26
Mechanical Screens
Dr Amr Abdelkader San 419 27
Screening
Dr Amr Abdelkader San 419 28
Screening Disposal
Dr Amr Abdelkader San 419 29
MECHANICAL SCREEN
Dr Amr Abdelkader San 419 30
GRIT REMOVAL CHAMBERDr Amr Abdelkader San 419 31
•Removal of 40 to 60 % of SS
•Removal of 25 to 35 % of BOD
•Removal of Oil and Grease
Purpose of
Primary Sedimentation Tank
Dr Amr Abdelkader San 419 32
PRIMARY SEDIMENTATION TANK (Rectangular)Dr Amr Abdelkader San 419 33
PRIMARY SEDIMENTATION TANK (Circular)Dr Amr Abdelkader San 419 34
Design Criteria of Preliminary Treatment Units
1.Deceleration chamber
Q
av=Pop*(av.SF)
Peakfactor(PF)=(18+(Pop)
0.5
)/(4+(Pop)
0.5
),(Popinthousand).
Minimumfactor(MF)=0.2*(Pop)
1/6
,(Popinthousand).
SF=sewageflow=0.8to0.9fromaveragewaterconsumption.
Q
d=Q
max=PF*Q
av
RT=1to3min.
n≥1(take1atfirst)
Vol=nLBd
SA=nLB
XA=nBd
L=(2to4)*B
d=1–2m
Velocity=0.6to1.5m/s
Wastewater Treatment Calculation
Dr Amr Abdelkader San 419 35
2. Approach channel
Openchannelflow(manning)
Q
av=Pop*(av.SF)
Q
d=Q
max=PF*Q
av
n≥1(take1atfirst)
XA=nBd
V=0.6to1.5m/s
AssumeV
max=1.5m/s
B=2dmax(bestsection)
Get(B,d
max)atQ
max
Assume(1/n)=60
AssumeV
min=0.6m/s
Q
min=V
min*A
min=0.6*Bd
min
Thenget(d
min)
FrommanninggetS
min
V
min=(1/n)R
(2/3)S
min(1/2)
R=Area/wettedperimeter=Bd
min/(B+2d
min)
Assume(1/n)=60
Afterthatyoucangetd
maxatV
maxfrommanningalso.Fixtheslope.
Dr Amr Abdelkader San 419 36
Dr Amr Abdelkader San 419 37
Typesofscreen
Coarsescreen.Spacebetweenbars(5–10cm)
Mediumscreen.Spacebetweenbars(2–5cm)
Finescreen.widthofopening=(0.08–0.24cm),circularplate),
lengthofopening=(0.64–5.1cm)
Reasonsforusingfinescreen
WhenthePSTisoverloaded.
Withcertaintypesofindustrialwastewater.
WhenthePSTisn'tused.
Whenthereisnosecondarytreatment.
Disposalofthescreening(screenedmaterial)
Sanitarylandfills.
Incineration.
Grindingandreturntotheheadworksoftheplant.
3. Screen
Dr Amr Abdelkader San 419 38
Design of coarse screen
The velocity before the bar screen (V
1) ≥ 0.6 m/s
The velocity between the bar screen (V
2) ≤ 1.5 m/sec
Where V
1= Q
max/ (nBd')
Where V
2= Q
max/ (nNSd')
h loss through the screen = 1.4 (V
2
2
–V
1
2
)/2g
h loss ≤ 10 cm (at the beginning of working)
h loss ≤ 30 cm (before cleaning)
Q
d= Q
max= PF * Q
av
Q
av= Pop * (av. SF)
n ≥ 2 (take 2 at first) + by pass
A
netin inclined plane = 2 to 3 (approach channel area)
A
netin inclined plane = n (N S L) m
2
Where,
N = no. of spacing in one screen = no of bars –1
S = spacing between bars = according to screen type (coarse –medium)
L = d' / sinθ
d' = d (of approach channel + 5 to 10cm)
θ = 30 –60o (manual screen)
Screen bar diameter (Ø) = 1.3 –1.6 –1.9 cm
The screen width = B = (N + 1)*Ø + N * S
Dr Amr Abdelkader San 419 39
4.GritRemovalChamber
Methodsusedtocontrolvelocityofthechamber
•Useparabolacrosssectionarea.
•Userectangularcrosssectionwithproportionalweirattheendofthe
chamber.
Designdataofrectangulartype
Q
d=Q
max.
Horizontalvelocity=0.25to0.35m/s
RT=45to90sec(take60)
SLR=1000to2500m
3
/m
2
/d(take1200)
n≥2
L=15to20mB≤d
Dr Amr Abdelkader San 419 40
Dr Amr Abdelkader San 419 41
Design Criteria of Primary Sedimentation Tank
Purpose
Removalof40to60%ofSS
Removalof25to35%ofBOD
Designdata
Retentiontime=T=1.5to2.5hr(incaseofflowedwithsecondary
treatment),=2to4hr(incaseofnosecondarytreatment
appearance)
SLR=30to45m3/m2/d
HLOW=150to600m3/m2/d
d=3to5m
B=2to3d
L=4to5B
L≤50m
Ø≤35m
Dr Amr Abdelkader San 419 42
Factors affecting efficiency of
sedimentation process
1.Shapeandsizeofsolids.
2.Specificgravityofsuspendedsolids.
3.Temperature.
4.Velocityofflow.
5.Retentiontime.
6.Efficiencyofpervioustreatment.
7.Sludgeremovalmethod.
8.Scumremovalmethod.
9.Surfaceloadingrate.
10.Viscosityofsewage.
11.Specificgravityofsewage.
12.Inletandoutletarrangement.
Dr Amr Abdelkader San 419 43
Example
Designthefollowingtreatmentunitsforasewagetreatment
plant:
•GRC(conventionalwithproportionalweir).
•PST(rectangular)
Giventhefollowingdata:
•Averagesewageflowis17,280m
3
/d
•SLRofGRC=1200m
3
/m
2
/d
•SLRofPST=30m
3
/m
2
/d
Dr Amr Abdelkader San 419 44
Solution
AssumePF=1.5So,Qmax=1.5*17,280=25,920m
3
/d
DesignofGRC
RT=45–90sec=60sec=Vol./Q
SLR=1000–2500=1200m
3
/m
2
/d=50m
3
/m
2
/hr=Q/SA
V=0.25–0.35=0.3m/s=1080m/hr=Q/XA
RT*V=L=18m
nBL=36B=SA=25,920/1200=21.6m
B=0.6m
Vol.=18m
3
d=0.85m
Dr Amr Abdelkader San 419 45
DesignofPST
Q
d=1080m
3
/hr
AssumeR.T=
3
hrs
Volume=3*1080=3240m
3
=nLBd
AssumeSLR=30m3/m2/d=1.25m
3
/m
2
/hr
SA=1080/1.25=864m2=nLB
d=3240/864=3.75m
Assume B = 2d = 7.5 m
Assume L = 4B = 30 m
n = 4 tanks
The important checks
RT = 3375 / 1080 = 3.125 hr
SLR = (1080 / 900) *24 = 28.8 m
3
/m
2
/d (safe but waste)
V
f= (1080/ 112.5*60) = 0.16 m/min
HLOW = (1080/30) * 24 = 864 m
3
/m/d
Take L
w= 55 m, HLOW = 471 m
3
/m/d (ok)
Dr Amr Abdelkader San 419 46