wastewater treatment plant lecture WWT1.pdf

fanet44923 4 views 47 slides Oct 28, 2025
Slide 1
Slide 1 of 47
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47

About This Presentation

wastewater treatment plant lecture


Slide Content

Wastewater Treatment
WW1
By
Dr. Amr Abdel Kader
Specialized Scientific Programs
Civil & Environmental Engineering
Dr Amr Abdelkader San 419 1

BASICS
•WHAT IS WASTEWATER?
•WHY IT IS ENVIRONM. UNFRIENDLY?
•WASTEWATER COMPOSITION?
•WHAT ARE WASTEWATER SOURCES?
•WHY WE NEED TO TREAT IT?
•WASTWATER CHARACHTERISTICS?
•WHAT ARE THE TWO BASIC EQUATIONS OF
WASTEWATER TREATMENTS?

COMPOSITION OF WW
•99.9 WATER + 0.1 SOLIDS
•TS = 100 THEN;
•TSS = 30
•SETLEABLES = 15 (ORGANIC = 10 AND
INORGANIC = 5)
•NON SETLEABLES = 15 (ORGANIC = 10 AND
INORGANIC = 5)
•TDS = 70
•ORGANIC = 30
•INORGANIC = 40
•TOTAL ORGANIC = 50
•TOTAL INORGANIC = 50

REMEMBER!
•ORGANICS + O2
STABLE ORG. MATTER + CO2 + H2O
•ORGANICS (WITHOUT O2)
STABLE ORG. MATTER + CO2 + H2O

TERMINOLOGIES TO BE
REMEMBERED!
•BOD 5, 20
•COD
•TS = TSS + TDS = TVS + TFS
•TSS = TVSS + TFSS
•TDS = TVDS + TFDS
•TVS = TVSS + TVDS
•TFS = TFSS + TFDS
•MLSS, MLVSS

WASTEWATER TREATMENT
ENVIRONMENT
•TEMP., PH, NO TOXIC…
•WHAT BACTERIA CAN EAT.
•IS FOOD CONCENTRATION MATTERS!!!!! ….FOOD TO
MICROORGANISMS RATIO.
•IS TIME IMPORTATNT? WHAT TIME? HRT OR SLUDGE
AGE..?
•NUTRIENTS MATTERS? ORGANIC:N:P = 100 : 5 : 1
•AERATE AND MIX WITH NO SETTLING,….. SETTLE
WITH NO AERATE AND MIX!!!! DON’T MIX
PROCESSES!!!
Dr Amr Abdelkader San 419 6

WASTEWATER TREATMENT
ENVIRONMENT
•SOLIDS SEPARATE FIRST BY EASY MEANS..
•GIVE AEROBIC BACTERIA AIR AND
PREVENT AIR FROM ANAEROBIC BACTERIA
•HOW U GIVE AIR TO AEROBIC ANAEROBES
(CASCADES, MECHANICAL (SA,
DIFFUSERS), NATURALLY).
Dr Amr Abdelkader San 419 7

WASTEWATER TREATMENTS
•PRE-TREATMENT (SCREEN, GRIT REMOVAL)
•PRIMARY TREATMENT (PLAIN SETTLING OR
DISSOLVED AIR FLOTATION)
•SECONDARY TREATMENT
•TERTIARY TREATMENT
Dr Amr Abdelkader San 419 8

WASTEWATER TREATMENTS
•PRETREATMENT
•SCREEN; MECHANICAL AND MANUAL
•GRIT REMOVAL
•OIL AND GREASE
•PRE-AERATION
•EQUALIZATION
•HEAVY METALS SEPARATION
Dr Amr Abdelkader San 419 9

WASTEWATER TREATMENTS
PRIMARY
•PHYSICAL; FLOTATION, SEDIMENTATION
•CHEMICAL; NEUTRALIZATION, COAGULATION
Dr Amr Abdelkader San 419 10

WASTEWATER TREATMENTS
•SECONDARY
•DISSOLVED ORGANIC REMOVAL
•SUSPENDED GROWTH
•ACTIVATED SLUDGE, OXIDATION DITCH,
AERATED LAGOON, PONDS, UASB,
ANAEROBIC POND
•ATTACHED GROWTH
•TRICKLING FILTER, RBC, FLUDIZED BED,
UAFFRAERATED LAGOON
•SUSPENDED SOLIDS REMOVAL
•SETTLING; PLAIN OR CHEMICALLY
Dr Amr Abdelkader San 419 11

WASTEWATER TREATMENTS
•TERTIARY
•FILTRATION
•COAGULATION AND SEDIMENTATION
•CARBON ADSORPTION
•MEMBRANE
•MICROSTRAINER
•POLISHING PONDS
•WEEDS
Dr Amr Abdelkader San 419 12

WASTE WATER TREATMENT
•Primary Treatment (Physical Treatment)
Physicaltreatmentdependsonlyonthephysicalcharacteristicsofimpurities
thatpresentinwastewatertobetreated.So,itsefficiencyissmall.
•Secondary Treatment (Biological Treatment)
Secondarytreatmentdependsonthebiologicalcharacteristicsof
microorganismsthatpresentinwastewatertobetreatedsuchasbacteriathat
helpsintheremovaloforganicmatters.
•Tertiary Treatment (Polishing)
Incaseofrequiredaneffluentwithverygoodcharacteristics,tertiarytreatmenthas
beendone.Itcanremovesalts,odor,tasteandtherestoforganicmatterusingfor
example(ActivatedCarbonFilter,DynasandFilter.…etc).
Dr Amr Abdelkader San 419 13

Dr Amr Abdelkader San 419 14

Dr Amr Abdelkader San 419 15

Dr Amr Abdelkader San 419 16

PURPOSE OF
PRIMARY TREATMENT
Removal of
•Large and big floating particles.
•(40 to 60 %) of SS and (25 to 35 %) of BOD.
•Sand, gravel, silt…..etc.
•Oil and grease.
Dr Amr Abdelkader San 419 17

Purpose of
Preliminary Treatment Units
Deceleration Chamber
Decreasing velocity of flow before the screen to prevent the
escaping of particles from the screening opens.
Approach channel
Transmission of waste water from deceleration chamber to screen
at aerated condition and with suitable velocity that helps in
avoid anaerobic reaction between units.
Dr Amr Abdelkader San 419 18

Screen
head loss
By pass
d
10 cm
d'
V1
V2
L
Coarse Screen
Elevation
Plan
B
From approch channel
To GRC Dr Amr Abdelkader San 419 19

Grit Removal Chamber
Elevation
Plan
Scrapper chain
Screew pump
Motor
Proportional weir
L
B
Grit
From screen Efflent
Grit
d
Hopper Dr Amr Abdelkader San 419 20

Screen
It's used to remove big and strange impurities from waste
water, such as (paper –wood –plastics -…..), to protect the
down stream equipment against damage.
Skimming Tank
Removal of oil, grease and most of float matters.
Grit removal chamber (GRC)
Removal of particles has size more than 0.2 mm, such as (sand,
gravel, grit …..etc), to:
Protect down stream mechanical equipment.
Reduce conduit clogging.
Prevent interface with other treatment.
Improve sludge quality.
Dr Amr Abdelkader San 419 21

Screw Pump
Dr Amr Abdelkader San 419 22

Preliminary Treatment
Dr Amr Abdelkader San 419 23

DECCELERATION CHAMBER AND SCREEN
Dr Amr Abdelkader San 419 24

Force mains and deceleration chamber
Dr Amr Abdelkader San 419 25

Screens
Dr Amr Abdelkader San 419 26

Mechanical Screens
Dr Amr Abdelkader San 419 27

Screening
Dr Amr Abdelkader San 419 28

Screening Disposal
Dr Amr Abdelkader San 419 29

MECHANICAL SCREEN
Dr Amr Abdelkader San 419 30

GRIT REMOVAL CHAMBERDr Amr Abdelkader San 419 31

•Removal of 40 to 60 % of SS
•Removal of 25 to 35 % of BOD
•Removal of Oil and Grease
Purpose of
Primary Sedimentation Tank
Dr Amr Abdelkader San 419 32

PRIMARY SEDIMENTATION TANK (Rectangular)Dr Amr Abdelkader San 419 33

PRIMARY SEDIMENTATION TANK (Circular)Dr Amr Abdelkader San 419 34

Design Criteria of Preliminary Treatment Units
1.Deceleration chamber
Q
av=Pop*(av.SF)
Peakfactor(PF)=(18+(Pop)
0.5
)/(4+(Pop)
0.5
),(Popinthousand).
Minimumfactor(MF)=0.2*(Pop)
1/6
,(Popinthousand).
SF=sewageflow=0.8to0.9fromaveragewaterconsumption.
Q
d=Q
max=PF*Q
av
RT=1to3min.
n≥1(take1atfirst)
Vol=nLBd
SA=nLB
XA=nBd
L=(2to4)*B
d=1–2m
Velocity=0.6to1.5m/s
Wastewater Treatment Calculation
Dr Amr Abdelkader San 419 35

2. Approach channel
Openchannelflow(manning)
Q
av=Pop*(av.SF)
Q
d=Q
max=PF*Q
av
n≥1(take1atfirst)
XA=nBd
V=0.6to1.5m/s
AssumeV
max=1.5m/s
B=2dmax(bestsection)
Get(B,d
max)atQ
max
Assume(1/n)=60
AssumeV
min=0.6m/s
Q
min=V
min*A
min=0.6*Bd
min
Thenget(d
min)
FrommanninggetS
min
V
min=(1/n)R
(2/3)S
min(1/2)
R=Area/wettedperimeter=Bd
min/(B+2d
min)
Assume(1/n)=60
Afterthatyoucangetd
maxatV
maxfrommanningalso.Fixtheslope.
Dr Amr Abdelkader San 419 36

Dr Amr Abdelkader San 419 37

Typesofscreen
Coarsescreen.Spacebetweenbars(5–10cm)
Mediumscreen.Spacebetweenbars(2–5cm)
Finescreen.widthofopening=(0.08–0.24cm),circularplate),
lengthofopening=(0.64–5.1cm)
Reasonsforusingfinescreen
WhenthePSTisoverloaded.
Withcertaintypesofindustrialwastewater.
WhenthePSTisn'tused.
Whenthereisnosecondarytreatment.
Disposalofthescreening(screenedmaterial)
Sanitarylandfills.
Incineration.
Grindingandreturntotheheadworksoftheplant.
3. Screen
Dr Amr Abdelkader San 419 38

Design of coarse screen
The velocity before the bar screen (V
1) ≥ 0.6 m/s
The velocity between the bar screen (V
2) ≤ 1.5 m/sec
Where V
1= Q
max/ (nBd')
Where V
2= Q
max/ (nNSd')
h loss through the screen = 1.4 (V
2
2
–V
1
2
)/2g
h loss ≤ 10 cm (at the beginning of working)
h loss ≤ 30 cm (before cleaning)
Q
d= Q
max= PF * Q
av
Q
av= Pop * (av. SF)
n ≥ 2 (take 2 at first) + by pass
A
netin inclined plane = 2 to 3 (approach channel area)
A
netin inclined plane = n (N S L) m
2
Where,
N = no. of spacing in one screen = no of bars –1
S = spacing between bars = according to screen type (coarse –medium)
L = d' / sinθ
d' = d (of approach channel + 5 to 10cm)
θ = 30 –60o (manual screen)
Screen bar diameter (Ø) = 1.3 –1.6 –1.9 cm
The screen width = B = (N + 1)*Ø + N * S
Dr Amr Abdelkader San 419 39

4.GritRemovalChamber
Methodsusedtocontrolvelocityofthechamber
•Useparabolacrosssectionarea.
•Userectangularcrosssectionwithproportionalweirattheendofthe
chamber.
Designdataofrectangulartype
Q
d=Q
max.
Horizontalvelocity=0.25to0.35m/s
RT=45to90sec(take60)
SLR=1000to2500m
3
/m
2
/d(take1200)
n≥2
L=15to20mB≤d
Dr Amr Abdelkader San 419 40

Dr Amr Abdelkader San 419 41

Design Criteria of Primary Sedimentation Tank
Purpose
Removalof40to60%ofSS
Removalof25to35%ofBOD
Designdata
Retentiontime=T=1.5to2.5hr(incaseofflowedwithsecondary
treatment),=2to4hr(incaseofnosecondarytreatment
appearance)
SLR=30to45m3/m2/d
HLOW=150to600m3/m2/d
d=3to5m
B=2to3d
L=4to5B
L≤50m
Ø≤35m
Dr Amr Abdelkader San 419 42

Factors affecting efficiency of
sedimentation process
1.Shapeandsizeofsolids.
2.Specificgravityofsuspendedsolids.
3.Temperature.
4.Velocityofflow.
5.Retentiontime.
6.Efficiencyofpervioustreatment.
7.Sludgeremovalmethod.
8.Scumremovalmethod.
9.Surfaceloadingrate.
10.Viscosityofsewage.
11.Specificgravityofsewage.
12.Inletandoutletarrangement.
Dr Amr Abdelkader San 419 43

Example
Designthefollowingtreatmentunitsforasewagetreatment
plant:
•GRC(conventionalwithproportionalweir).
•PST(rectangular)
Giventhefollowingdata:
•Averagesewageflowis17,280m
3
/d
•SLRofGRC=1200m
3
/m
2
/d
•SLRofPST=30m
3
/m
2
/d
Dr Amr Abdelkader San 419 44

Solution
AssumePF=1.5So,Qmax=1.5*17,280=25,920m
3
/d
DesignofGRC
RT=45–90sec=60sec=Vol./Q
SLR=1000–2500=1200m
3
/m
2
/d=50m
3
/m
2
/hr=Q/SA
V=0.25–0.35=0.3m/s=1080m/hr=Q/XA
RT*V=L=18m
nBL=36B=SA=25,920/1200=21.6m
B=0.6m
Vol.=18m
3
d=0.85m
Dr Amr Abdelkader San 419 45

DesignofPST
Q
d=1080m
3
/hr
AssumeR.T=
3
hrs
Volume=3*1080=3240m
3
=nLBd
AssumeSLR=30m3/m2/d=1.25m
3
/m
2
/hr
SA=1080/1.25=864m2=nLB
d=3240/864=3.75m
Assume B = 2d = 7.5 m
Assume L = 4B = 30 m
n = 4 tanks
The important checks
RT = 3375 / 1080 = 3.125 hr
SLR = (1080 / 900) *24 = 28.8 m
3
/m
2
/d (safe but waste)
V
f= (1080/ 112.5*60) = 0.16 m/min
HLOW = (1080/30) * 24 = 864 m
3
/m/d
Take L
w= 55 m, HLOW = 471 m
3
/m/d (ok)
Dr Amr Abdelkader San 419 46