Work Permit System
(WPS)

Work Permit System

Designed and intended to specify adequate
safety measures in advance against identified
hazards

To stipulate implementation of the said safety
measures by the permittee

Responsibilities of HSE Engineer

Introduce the relevant system at the
specified workplace

Make all concerned aware of the system.

Keep a check on the process.

Facilitate its implementation & follow up.

Activities requiring WPS

Working in confined space

Working on Overhead Traction Line.

Carrying out hot work in specified location.

Working at P&M and other Power driven
equipment.

Giving clearance for excavation work.

Carrying out electrical work (High Tension / Low
Tension)

Carrying out Industrial Radiography.

Removal of covers from manholes / openings.

Blasting Operation

Definitions

Permittee

the concerned supervisor who is executing the
job

Issuing authority

Section In charge or area In charge

Permittee identifies the activity
covered under WPS
Permittee sends the request for work permit
in the respective format
Issuing authority visit the work location & assess
whether work can be started. Permits to work by
signing in the work permit form
Work Executed as per the recommendations in work
permit.
Issuing authority inspects the work spot, if situation is
safe, closes the permit.
Copy of permit sent to HSE Engineer

If Client has a work permit
then it shall be followed

Formats
Tags