ALL EXTERNAL WALLS ARE 225MM THK UNLESS OTHERWISE STATED
ALL EXTERNAL DOORS ARE METAL DOORS WITH STEEL FRAMES.
EXCEPT OTHERWISE STATED (SEE DOOR SCHEDULE FOR SPECS).
ALL INTERNAL” DOORS ARE WELL-SEASDNED TIMBER FLUSH
DOORS WIM TIMBER FRANCS EXCEPT OTHERWISE STATES
(GEE DOOR SCHEDULE FOR SPECIFICATIONS).
AL WINDOWS ARE NATURAL ANODIZED ALUMINUM. FRAVES
PLAN NOTES
1. 225MM SANDCRETE HOLLOW BLOCK WALL RENOERED ON
BOTH FACES WITH ZM THK CEMENT AND SAND PLASTER
Oe RATIO 1:3.
2. TOMAN SANDCRETE HOLLOW BLOCK WALL RENDERED ON
BOTH FACES vih AM THK CEMENT AND SAND PLASTER
OF RATIO 1:3
REINFORCED CONCRETE COLUMNS. SEE AI - 12
a
OKOLIE UCHECHUKWU
on y E tn
Eee eee
LLC, pomos pa, oras À. NERIANEALDICH, mee ra AGE on me mor
art :
‘ — us
= =
eo ero a
2 2 S 7
la ole | a O fl ‘tole il Na =
er >. Dd) BOS me ”
s ‘bedroom 3
o Y a
‘ mines nm qe
: af De
. =
9 om ro ao ® WORUNG DRAWINGS AND
1 ® SPECIFICATIONS
“ a)
: - 3 win:
Kanon
BER
22544M SANDCRETE HOLLOW BLOCK WALL RENOERED ON
BOTH FACES WITH ZM THK CEMENT AND SAND PLASTER
Oe RATIO 1:3.
160MM SANDCRETE HOLLOW BLOCE WALL RENDERED ON
BOTH FACES vih AM THK CEMENT AND SAND PLASTER
OF RATIO 1:3
REINFORCED CONCRETE COLUMNS. SEE AI - 12
feu ti Cale ES ER DEE inser ert SE me
(Get moc Sone Jon srry Fare ogres
1, Eee Se exactos na orcs o o aa is Dio
FE SP a SBE PEN. coo E TE
RE he Coo O ERE
Sar ee con vacios
à se 0 a DOK L
1 u h —
vn
va
Kitchen ®
5 ía bedroom 3
>| ®
e Ducs
os on Fe
1 o
owt
$" —
1. 225MM SANDCRETE HOLLOW BLOCK WALL RENOERED ON
BOTH FACES WITH ZM THK CEMENT AND SAND PLASTER
Oe RATIO 1:3.
160MM SANDCRETE HOLLOW BLOCE WALL RENDERED ON
BOTH FACES vih AM THK CEMENT AND SAND PLASTER
3 OFRATIO 13,
REINFORCED CONCRETE COLUMNS. SEE AI - 12
feu ti Cale ES ER DEE à RSR eS SS SS idle
(Get moc Sone Jon srry Fare ogres
1, Eee Se exactos na orcs o o aa is Dio
FE SP a SBE PEN. coo OEA
RE he Coo O ERE
Sar ee con vacios
A ec. 4 d OR \
1 —
ve
® F2 bedroom 3
5 nt o
7 e. bel
m Él
9 at o
10 w ®
oz
5 —
z 7) _KEYED SECOND FLOOR PLAN
ai oF 1:125
a
OKOLIE UCHECHUKWU
ORIO ORAWNGS ANO
SPAMS.
KEYED SECOND
FLOOR PLAN
10
¡EN ROOF PLAN
Qa 1: 125
pS
OKOLIE UCHECHUKWU
ieee
Biase ees
ieee
PB
ORNE ORAWNGS ANO
SPAMS.
ROOF PLAN
A205
As-0s,
GATE HOUSE FLOOR.
AND ROOF PLANS.
10, GATE HOUSE FLOOR AND ROOF PLANS
ra 1:25
N
> 600 x 600 mm non-slip vitrified floor
tis laid on cement sanderoed with
elasti additives
‘emulsion paint
finish
2700 x 2700 needle fit
\ ‘synthetic ore carpet
3
living room
240x240 mm ote habs
Dicke rn tack
=
à à + Y SPECIFICATIONS.
L pe
ENLARGED LIVING ROOM
TOUR FLAN
PER ENLARGED LIVING ROOM FLOOR PLAN re.
rw 1:25 OS TT
v0 Pro Pg
+
corian contertop
7
ceramic tes
+
200 x 200 mm white glazed
4
A
di Y
0 Kitchen “Y
- 300 x 600 mm non-slip vitrified floor
lite
elastic additives
x
A
{1 \ ENLARGED KITCHEN FLOOR PLAN
ENLARGED KITCHEN
25
A2-01
1
A2- 03
e
z
20060 ey soni vts toe
00 gta
stair hall
27
42
a1
40
39
ms
29 30 31 32 33 34 35 36 37
RP LR REY
vr
N
u
25
26
27
[ om
BON,
A2-01
ENLARGED STAIR HALL FLOOR PLAN
ENLARGED STAIR HALL
35
bath
A
DA
wb
MIRROR
MIRROR
wb
shower bath
T
ENLARGED TOILET
FLOOR PLANS
(2) ENLARGED TOILET FLOOR PLAN: Fes
NE 1:25 28 PE ancien
(2) RELECTED GROUND FLOOR CEILING PLAN
so se one so
= Sn een om
sons a || Simons
Er Vere! || cade
i = I
] En neg [7
Y mr, ano 1 En
oras Dunes so
5; à u: Fa
betroom 2 bocroom 2
ELECTED GROUND
ey
1:
125
FLOOR CEILING PLAN
ES
SEE
v0 Pro Pg
>
OKOLIE UCHECHUKWU
Re ad
a cu" NE
elo = le
= A
Lt 151 : . at |
cher c ) ‘stair hall 2 C > kichen =
JL teng oom iL
] er] | 5 ao [pa [
¡ya BEA LI >
: Ee
—
IRON
1_\ RELECTED FIRST FLOOR CEILING PLAN AS
AL 15, 1:125 4:8 oe MARCH, 2013
v0 [Pro [ue
1
RELECTED SECOND FLOOR CEILING PLAN
21-16
RELECTED SECOND
FLOOR CEILING FLAN
1:2
TE
vo [Pro
GENERAL NOTES:
A. ALL EXTERNAL WALLS ARE 22SuM THK UNLESS OTHERWISE STATED.
ALL EXTERNAL DOORS ARE ETAL DOORS WM STEEL FRAMES
EXCEPT OTHERWISE STATED (SEF DOOR SCHEDULE FOR SPECS)
D. AL WINDOWS ARE NATURAL ANODIZED ALUMINUM, FRAMES
TA eu CLEAR FLOAT GLASS. EXCEPT OIMERMSE STATED
(SEE WNDOW SCHEDULE FOR SPECIFICATIONS).
E. SEE DOOR SCHEDULES TO CHECK UNTEL HEKGHTS FOR ALL DOOR
& WNOOW OPENINGS
E. CREATE ALL NECESSARY EXTRACTOR FAN OPENINGS.
G. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CO-OROINATING
ALL FIRE ALARM OPERATION WI ‘THE CLIENT AND LOCAL FIRE
Geer, DURING CONSTRUCTION OPERATION
H SEE hisnes SOMEDULES, FOR ALL FINSHES.
SEE ELEVATIONS FOR EXTERIOR WALL PNISHES
SECTION NOTES
225MM SANDCREIE HOLLOW BLOCK WALL RENDERED ON
BOTW FACES WIN MN THE CEMENT AND SAND PLASTER
OF RAD 3
Tonia THE AiR CONDITIONER PLATFORM SEE A2 - 4
‘HIM THE PLASTERBOARO SCREWED 10 CELING SECTIONS,
METEO AT JOINTS AND FINISHED AS SPECIFIED INTHE FINISHES
SCHEDULE. SEE AS - OF
000M IN HEIGHT STAINLESS STEEL RAILINGS
240 X 240 MM FROSTED GLASS BLOCKS WITH EOMM THE
IMA GAUGE ALUMINIUM LONG SPAN ROOFING SHEETS
PARAPET WALL COVERED WITH 100MM THK REINFORCED
Concrete como
BRAITHWAITE STORAGE TANK TO MECHANICAL
ENGINEER'S spec
225 225 MM RENFORCED CONCRETE COLUMN
pS
OKOLIE UCHECHUKWU
m À BC >
opel
Hl wg || Mr 2
EI Le :
e TT 7
sos || | vd Le
votos | Edge E
= a ——— cen PE Tce PNR renee ener
ee ag
1 TRANSVERSE SECTION
ws 1:125 cn
1. 225MM SANDCRETE HOLLOW BLOCK WALL RENDERED ON
om FACES with 12mm THE CEMENT AND SAND PLASTER
OF RATIO 13.
SOA TH AIR CONDIMONER PLATFORM. SEE A2 - 04
TAM THK PLASIERSOARD SCREWED TO CELING SECTIONS
NEITED AT JOINTS AND FINISHED AS SPECIFIED IN THE FINISHES
SCHEDULE, SEE AS - O1
FOOD HEIGHT STAINLESS STEEL RAILINGS.
240 X 240 MM FROSTED GLASS BLOCKS WITH BOUM THI.
77M GAUGE ALUMINUM LONG SPAN ROOFING SHEETS
PARAPET WALL COVERED WITH 1COMM THE RENFORCED
CONCRETE COPING
[BRAITHWAITE STORAGE TANK TG MECHANICAL
ENGINEER S secs
9. 225% 228 MM REINFORCED CONCRETE COLUMN
Doe 1
1 CROSS SECTION
1:125
pS
OKOLIE UCHECHUKWU
Bert
et
[CROSS SECTION
SEE
GENERAL NOTES:
en
ALL EXTERNAL WALLS ARE 2254M THK UNLESS OTHERWISE STATED
ALL EXTERNAL DOORS ARE METAL DOORS MIN STEEL FRAMES.
EXCEPT OTHERWISE STATED (SEE 0008 SCHEDULE FOR SPECS).
AL INTERNAL DOORS ARE WELL-SEASONED TMBER FLUSH
DOORS WIM TIMBER FRAMES EXCEPT OTHERWISE. STATED
(SEE DOOR SCHEDULE FOR SPECIFICATIONS).
NT WINDOWS ARE NATURAL ANODIZED ALUMINUM, FRAMES
Wain EM CLEAR FLOAT CLASS EXCEPT OTHERWISE. STATED
(SEE WINDOW SCHEDULE FOR SPECIFICATIONS)
LE DOOR SCHEDULES TO CHECK UNTEL HEIGHTS FOR ALL DOOR.
& WNOON OPENINGS
THE CONTRACTOR SMALL BE RESPONSIBLE FOR CO-ORDINATING
ALL FIRE ALAR OPERATION WITH THE CLINT ANO LOCAL FIRE
DET, DURING CONSTRUCTION OPERATION.
SEE ENSHES SOMEDULES FOR ALL FINES.
SEE ELEVATIONS FOR EXTERIOR WALL FINSHES
cmon E À
3
a
SECTION NOTES
725MM SANDCRETE HOLLOW BLOCK WALL RENDERED ON
BOTH FACES WITH 2M THK CEMENT AND SAND PLASTER
OF RATIO la,
‘50MM THK AIR CONDITIONER PLATFORM. SEE A2 04
SNA TAR PLASTERBOARD SCREWED TO CELING SECTIONS,
NEITED AT JOINTS AND FINISHED AS SPECIFED IN THE HNSHES
OMA I HEIGHT STAINLESS STEEL RAILINGS
240 X 240 MM FROSTED GLASS BLOCKS WITH SOMM THK,
DIMMM GAUCE ALUMINIUM LONG SPAN ROOFING SHEETS
PARAPET WALL COVERED WITH TOOMM THE REINFORCED
CONCRETE COPING
BRATIWANE STORAGE TANK TO MECHANICAL
ENGINES SPECS
Z2S 225 MM RENFORCED CONCRETE COLUMN
ONG
78910 Mi
CROSS SECTION
1:125
pS
OKOLIE UCHECHUKWU
Bert
et
[CROSS SECTION
SEE
porel save ted amid ae 0
se o “ is
“sommes 47 |
sm
ac
DETAIL SECTION
1 A/C PLATFORM SECTION AND DETAIL
wa) 1:25
A/C PLATFORM SECTION
AND DETAIL
PS RooFuva
pS
OKOLIE UCHECHUKWU
Hi
1
‘TRANSVERSE SECTION
ee cance ge 1] AS E
ER 00
PPOATEHOUSE ROOR LEVEL gy |
= = | waz
Fm assumed GROUND LEVEL in
CROSS SECTION
vor DRAWINGS A)
PRA
GATE HOUSE
SECTIONS
O) GATE HOUSE SECTIONS a ee
wo) : e ARTE
ur 1:50
pS
OKOLIE UCHECHUKWU
Bert
et
GENERAL NOTES: ELEVATION NOTES
A ALL EXTERNAL WALLS ARE 22540 TH UNLESS OTHERMSE, STATED. 1. PREANSHED ANODIED ALUMINIUM CLADOING
BALL EXTERNAL DOORS ARE METAL DOORS WIM STEEL FRAMES ATROOF FASCIA
(SEE DOOR SCHEDULE FOR SPEGFICANONS) 3. BRLLIANT GRAY STUCCO EXTERIOR PLASTER SMOOTH
D. ALL WNOOWS ARE NATURAL ANODIZED ALUMMUM FRAMES Wit MILDEW AND 10 YEARS WARRANTY
NT" CLEAR FORT GLASS EXCEPT OTHERWISE STATED & 10% 400 x IOMA MATTE FS TERRA COTTA TLES
(SEE MNOO SCHEDULE FoR SPEcincanioNs). FASTENED 10 ALUMINIUM SECTIONS
E SE 000 SCHDULES TO CHECK UMIEL HEGHTS. FOR ALL DOOR 2. SEE WINDOW SCHEDULE
a: wnbow ObENNGS. À. SEE wnbow SCHEDULE
FL. CREATE ALL NECESSARY EXTRACTOR FAN OPENINGS. 3 SEE WINDOW SCHEDULE
6. THe CONTRACTOR SMALE RESPONSIBLE FOR COMORDNATING
ALE FRE ALARM OPERATION WITHTHE CLIENT AND LOCAL FIRE
DES DURING CONSTRUCTION OPERATION
In. SEE EMSHES SCHEDULES FOR AL FISHES.
IF SEE ELevanons FOR EXTERIOR WALL FINSHES
A Bc oD E # Dp OK L
i
E == a
min + E i | i
== =| | E===2 lo +
mn F ==, E | | |
La ELEVATION 1
ELEVATION 1
ES
2-0 1:125
MARCH. na
GENERAL NOTES:
A
8
c
ALL EXTERNAL WALLS ARE 22541 THK UNLESS OTHERWISE STATED.
ALL EXTERNAL DOORS ARE METAL DOORS WIM STEEL FRAMES.
EXCEPT OTHERWISE STATED (SEE DOOR SCHEDULE FOR SPECS).
ALL INTERNAL DOORS ARE WELL-SEASONED TMGER’ FLUSH
DOORS Witt TMBER FRAMES EXCEPT OMERMISE. STATED
ALL EXTERNAL WALLS ARE 225MM THK UNLESS OTHERWISE STATED,
ALL EXTERNAL DOORS ARE METAL DOORS WIM STEEL FRAMES.
ELEVATION NOTES
OKOLIE UCHECHUKWU
PRE-FINISHED ANODIZED ALUMINIUM CLADDING
AI RODF FASCIA
ORNE ORAWNGS ANO
SPAMS.
cc 3
ÓN
ELEVATION 3
ELEVATION 3
ES
43-03
1:125
MARCH. na
ELEVATION NOTES
pS
OKOLIE UCHECHUKWU
A AL EXTERNAL MALLS ARE 225MM THK UNLESS OTHERWSE STATED. 1. PREFINISHED ANODIZED ALUMINIUM CLADDING
E ALL EXTERNAL DOORS ARE METAL DOORS WITH STEEL FRAMES ATROOF FASCIA
ÉXCEPT OTMERMISE STATED (SEE DOOR SCHEDULE FOR SPECS) 2, FOOMM I HEIGHT STAINLESS STEEL RAILING
G AL INTERNAL DOORS ARE WELL-SEASONED TMBER FLUSH. 3 GRILLIANT WHITE EMULSION PAINT
DOORS Wi TEER FRAMES. EXCEPT OTMERMISE STATED X EXIERIOR CLADDING WITH NATURAL STONES
(SEE 0008 SCHEDULE FOR SPECIFICATIONS) 5. SRILIANT GRAY SIUCCO EXTERIOR PLASTER SMOOTH
D. ALL WINDOWS ARE NATURAL ANODZED ALUMINUM FRAMES ‘WITH MILDEW AND 10 YEARS WARRANTY
ITA ll CLEAR FLOAT GLASS EXCEPT. OTHERWISE. STATED 6. 150: 400 À 100 MANTE FINISH TERRA COTTA TLES
(SEE MNDON SCHEDULE FOR SPECIFICATIONS). FASIENED TO ALUMINUM SECTIONS
E. SEE DOOR SCHEDULES TO CHECK UNTEL MERHTS FOR ALL DOOR 7. SEE winpow scueouce
4 MNOON OPENINGS A SEE WINDOW SCHEDULE
E. CREATE ALL NECESSARY EXTRACTOR FAN OPENINGS, 3. SEE WINDOW SCHEDULE
G. THE CONTRACTOR SMALL BE RESPONSIBLE FOR CO-OROINATING
ALL FIRE ALARM OPERATION WIR TE CLIENT AND LOCAL PIRE
Deer” DURING. CONSTRUCTION OPERATION.
I. SEE FINISHES SCHEDULES FOR ALL FISHES
1" SEE ELEVATIONS FOR EXTERIOR WALL FINISHES
H DHHS F IA 1
son 2 j A
rom i hin
oasis ze 1 | i
eg eat _ ELEVATION 4
Ga ELEVATION 4 mie
A3 = 04, 1:125 a aco)
pa ROOF LEVEL y
9 CEILINGLEVEL =
4%
3 GATE HOUSE FLOOR LEVEL
ELEVATION 1 '%% ASSUMED GROUND LEVEL 00 ELEVATION 4
eS y ROOF LEVEL a \
a CEILING LEVEL
2” GATE HOUSE FLOOR LEVEL 3”
a
toux von
ELEVATION 3
"ww ASSUMED GROUND LEVEL
ELEVATION 2
GATE HOUSE ELEVATIONS:
1:50
ORIO ORAWNGS ANO
SPAMS.
GATE HOUSE
ELEVATIONS,
Le
ELEVATION 1
ELEVATION 2
ELEVATION 4
rd
1_\_ LIVING ROOM INTERIOR ELEVATIONS
1:50
ER
Ma
pS
OKOLIE UCHECHUKWU
ORIO ORAWNGS ANO
SPAMS.
LIVING ROOM
INTERIOR ELEVATIONS,
| kitchen
ELEVATION 1 ELEVATION 2
kitchen =
ER
ELEVATION 3
. kitchen :
BUT
ELEVATION 4
KITCHEN INTERIOR ELEVATIONS
1:50
KITCHEN INTERIOR
ELEVATIONS,
ELEVATION 1
ELEVATION 3
ELEVATION 2
F
ELEVATION 4
TOILET INTERIOR ELEVATIONS
1:50
pS
OKOLIE UCHECHUKWU
ORIO ORAWNGS ANO
SPAMS.
TOILET INTERIOR,
x
E
$5
8
E
2
5
2
2
3
E
5
SECTION
UNDERGROUND WATER TANK DETAIL
PLAN
Sox 30Owm 4
Chambers Q tomes sang ge
Om ick mass
concrete
tral gourd eve 7
i
SECTION
DRAINAGE
y SITE DETAILS
yy 1:50
a
toux von
Las
“TRANSVERSE SECTION
sans
(structural finish) +1200
Seo
CROSS SECTION SWIMMING POOL
DETAILS
a N SWIMMING POOL DETAILS
ua) 1:50 LT
a
toux von
en.
YET sta hall
eee
St le ET ent
Ae 11
SCALE - 1:25
30%60cm vitrifed Moor es
Y
12mm thick rendering to receive
os 3 coat of emulsion paint
N poo
150mm thick reinforced
concrete sb pren
STAIRCASE
DETAILS
STAIRCASE DETAILS A
1:50
ü
900. ap
¿ [o
A 97
7
on? 5
e &
900
SCALE - 1:25
225
continous handrail
21925
conc. filed steel
column —
balustrade @225 O
PLAN
SCALE - 1:25
A SPIRAL STAIRCASE DETAIL.
u) 1:50