DRAWING NO.:PR- REV.00 RELATED ORINGINAL DRAWING No. DRAWING STATUS
A: APPROVED-CONSTRUCTION MAY PROCEED
B: APPROVED-SUBMIT FINAL DRAWINGS-CONSTRUCTION
MAY PROCEED
C: APPROVED EXCEPT AS NOTED
-MAKE CHANGES AND SUBMITE FINAL DRAWINGS
-CONSTRUCTION MAY PROCEED AS APPROVED
D: NOT APPROVED-CORRECT AND RESUBMIT
E: REVIEW NOT REQUIRED-CONSTRUCTION MAY PROCEED
DRAWING TITLE: TITLEDWG NO.REVISIONS ENGINEER DESCRIPTION SAV8-06.05 The Sun Avenue, 28 Mai Chi Tho
St, An Phu Ward, Thu Duc City, HCMC
Tel : +84 28 2200 3377
Web : http://khangducconst.com
KHANG DUC INVESTMENT AND CONSTRUCTION JSC REFERENCE
DRAWINGS
Approved By: Checked By :Designd By :Drawn By : SignatureDateProject Manager Issued By: DATE STATUS SUBMISSION FOR APPROVAL
WORKING PLATFROM DETAILS
Senior Port Engineer NOTE: March 30, 2024 1
A 1Clamp I150x75x5x7mm Square pipe 50x50x1.5@200 Plywood 18mm Handrail
PLATFORM DETAILS ABCDE
EL - 0.90
Working height Working platform 14002600Pile protection cover