07. Review & Monthly Plan TMU -0724.pptx

IrfanDinda2 1 views 21 slides Oct 12, 2025
Slide 1
Slide 1 of 21
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21

About This Presentation

Sbdndjx


Slide Content

REVIEW MONTHLY Penambangan Internal (PIT B1WA) Periode : Juni 2024

Review Pencapaian Produksi ( Truckcount ) & Waterfall

Review Cost & Productivity

Review Sequence Juni 2024 (PIT B1WA) Keterangan Section : Geology Model Coal Actual Juni Situasi 22 Juni-24 Situasi 1 Juni-24 Monthly Plan Juni

MONTHLY PLAN Penambangan Internal PIT B1 & B2 Periode : Juli 2024

Plan MA

Standard Parameter Operational

Fleet Capacity Unit SR: 9.27

PIT Setting & Hauler Note: - Note: 1 Fleet continue di B2 dari 1 Juli 2024 sampai akhir bulan , dan 4 fleet running di B1 1 Fleet move dari B1 ke B2 dari tgl 15 Juli 2024 sampai akhir bulan .

Plan Resume

PIT TMU Seq Reserve Ju l i 2024

Peta PIT Sequence Juli 2024 B2 G B1 RT

PIT B1 P1 P3 P4 4x Exc 40 Ton Expose R,T) –( segmen 16,17,18,19) OB 114,843 BCM CO 17,022 MT Alokasi Unit di Front: 4x Exc 40 Ton 1x Dz 375 APC 1x Dz 85 MJ 16 DT 2x PC200 cleaning coal MJ/CG/General Slope Alokasi Unit di Disposal: 2x Dz85 GSM/MJ OB : 114,843 BCM CG : 17,022 MT SR : 6.75 Kapasitas disposal OB Utara 150,736 LCM Jarak 500 s.d 700 m P2 Distance 700 M

Section PIT B1 Section A-A’ B B’ A A’ Section B-B’ RU RL RU RL RLB RLB C C’ Section C-C’ RU RL RLB

PIT B2 GH Foto Udara tgl . 30 Juni 2024 Distance 700 m Dump to RL+150 HDPE panjang 305 m Pump P2 RL+60 P1

PIT B2 G H 2x Exc 40 Ton Expose H,G20) –( segmen 7,8 ) OB 104,432 BCM CO 6,639 MT Alokasi Unit di Front: 2x Exc 40 Ton 1x Dz 375 APC 1x Dz 85 MJ 8 DT 2x PC200 cleaning coal MJ/CG/General Slope Alokasi Unit di Disposal: 1x Dz85 GSM/MJ OB : 104,432 BCM CG : 6,639 MT SR : 15.73 Disposal OB, Kapasitas volume 110,854 lcm, Jarak 700 m P1 P2 Distance 700 m Panjang HDPE 305 m Coal to RL+65: 1,509 MT Top Coal Elv+76 Coal to RL+60: 5,130 MT

Section PIT B2 GH Section A-A’ A A’ B B’ H G20 Section B-B’ H G20

Dewatering PIT B2 G H Panjang HDPE 305 m Elv . Base Sump 57 Elv Air 74.66 Vol sump 108,566 m3 Pump Foto Udara tgl . 30 Juni 2024

Dewatering PIT B2 1AU Foto Udara tgl . 30 Juni 2024

Key Points Mine Plan Juli 2024 Sequence Juli 2024 : 3x s.d 4x Exc 40 Ton running di B1WA dengan target coal product TMU42 minimal 17 Kmt 1x s.d 2 x Exc 40 Ton running di Pit B2 main seam H & G20 dengan target product coal TMU50 minimal 6.6 Kmt Total target coal product TMU50 adalah minimal 6.6 Kmt Total target coal bulan Juli adalah 2 3 .6 Kmt . Dewatering: 1xMPG12 running di 5B21 1 xMPG15 running di B2G