114 site layout

DrFereidounDejahang 4,393 views 27 slides Oct 29, 2016
Slide 1
Slide 1 of 27
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27

About This Presentation

Dr F.Dejahang, BSc CEng, BSc (Hons) Construction Mgmt, MSc, ex MCIOB, ex MCMI,ex.... PhD


Slide Content

[email protected]
htt://www.construction-productivity.

Four aspects are considered during site-layout
planning:
defining the safety-related temporary
facilities needed on construction sites;
defining proper safety zones around the
construction space;

considering safety in determining the optimum
placement of temporary facilities on the site;
utilizing parts of the constructed space as
temporary facilities to relieve congestion on
restricted sites.

Site layout planning is an important task that
involves:
Identifying the temporary facilities (TFs) needed
to support construction operations,
determining their size and shape, and
appropriately positioning them within the
boundaries of a construction site.

TFs include:
Warehouses,
Job offices
Workshops
Batch plant
Equipment (cranes)

The primary consideration in effective site
layout planning is safety and high productivity.
In addition to the smooth and low-cost flow of
materials, labour, and Equipment within the
site.

dynamic site layout planning can
be defined as the reorganization
of the location and/or areas of the
needed TFs on site at various
schedule intervals, along project
duration to suit the activities’
dynamic need of TFs.

Access roads, warehouses, and welfare
facilities which include:
first aid station
Toilet on site
labour rest area
washing facilities
canteen.

The size and number of these
facilities should reflect the site
size, nature of the work, and
the number of people who will
use them.

Consideration for Restricted Sites
The layout planning of site space on restricted
sites, becomes more important than any other
resource.
In many situations, construction managers use
part of the constructed facility e.g., some floors
in a high rise building for storage purposes or
other uses.

At any time interval, the management team
can select which part of the constructed space
can be used to place a TF.
Two conditions must be satisfied in this situation:
1-the constructed space has to be available
i.e., its finish date is earlier than the service
start date of the needed TF
2-the constructed space area has to be large
enough to accommodate the TF.

Storage of material can be very
difficult for single tower type high-rise
building.
This photo shows the temporary
storing of semi-prefabricated steel
components on partially completed
steel floor beams
Tags