Project Introduction
Widening of the Julianakanaal Berg – Obbicht
Realisation of the Widening Julianakanaal
km. 16,800 – 20,800
Projectinformation
Projectnumber : 11210
Projectadres : Hoge Kanaalweg 30
Postcode / City : 6167 RJ Geleen
Projectorganisation
Supervisor (HSE Coordinator Execution) (First Aid)
: I. Scherpenisse tel.: 06 53375242
Technical manager (First aid)
: R. van Gerwen tel.: 06 13135940
Environmental Manager (First Aid)
: A. Hoondert tel.: 06 22647850
Project Control Manager (Process Manager) (First Aid)
: L. van Axel Dongen tel.: 06 20521758
Contractmanager (Projectleider) (EHBO)
: R. Koorengevel tel.: 06 10995954
Projectmanager : M. Koelmans tel.: 06 53555906
Safety specialst : S. Fouchier tel: 06-81651109
Safety coordinator : A. Jansen tel: 06-29011056
Project Description
The project involves the engineering and widening of the Berg –
Obbicht section of the Julianakanaal, as part of the measure to
adapt the Julianakanaal for shipping class/CEMT class Vb with
limited draft. The Berg-Obbicht section will see various canal
widening activities, which can be categorized into three types of
work, namely:
• Deepening: Lowering the canal bed including the water-
retaining layer present within it;
• Widening: Relocating the canal banks/embankments, with
a new water-retaining layer to be established on the new
bank;
• Dredging: Lowering the canal bed (mainly sludge) at
locations where the existing water-retaining layer is
at sufficient depth.
What to Do in Case of an Accident/Emergency?
➢ An emergency first aider is present on every project. This is
primarily the Coordinator of Execution mentioned in this
brochure, but other members of the Van den Herik project
organization are also first aiders. Their phone numbers are
provided in this brochure as well as on the Emergency Card,
which can be found in every living and working area of the
project.
➢ In addition to the Emergency Card, a route description to the
nearest general practitioner and hospital is available.
➢ In the project office and on board, at least one ‘A’-type first
aid kit is available..
➢ Fire extinguishers are present at various indicated locations.
In the Event of a (Serious) Accident:
➢ Immediately notify the supervisor (If First Aider)
➢ The supervisor will then act as a First Aider or call upon
another First Aider from the project organization
➢ The First Aider will, if necessary, call emergency services.
Via 112
The Coordinator of Execution (supervisor):
➢ Acts according to the "Emergency Response Flowchart"
from the emergency plan, which is posted on the wall in
the (break) cabin
➢ Assigns someone to guide the ambulance.
➢ Ensures that the route to the victim is clear of obstacles.
The work road in the dry canal can be used by the
ambulance; if necessary, the ambulance can be assisted
by machines on-site if the accessibility of the work road
is insufficient.
What to Do in Case of Fire?
➢ Alert your colleagues who are in immediate danger.
➢ Waarschuw de leidinggevende, en verzamel op
aangewezen loc.
➢ Notify the supervisor and assemble at the designated
location. The supervisor will, if necessary, call the fire
department.
➢ Attempt to extinguish the fire yourself, using as many
firefighting tools as possible simultaneously.
➢ Follow the instructions of the fire department.
➢ Ensure that you do not put yourself in danger!!!
Emergency Contact List:
In case of emergency: call 112 for life-threatening situations.
For other cases, contact the Coordinator of the Execution
Phase of the project::
06 53375242
For other phone numbers, see the Project Phone and
Address List (posted on the wall in the (break) cabin).
General Practitioner Urmond
Graetheidelaan 11A, 6129GC, Urmond
Tel: 046-4331850 (by emergency press 1)
For the route description, see the Project Phone and Address
List (posted on the wall in the (break) cabin).
Zuyderland Medical Center Hospital
Dr. H. van der Hoffplein 1, 6162 BG Geleen
Tel: 088-4597777
For the route description, see the Project Phone and Address
List (posted on the wall in the (break) cabin)